HomeMy WebLinkAboutSteel Special Inspection Report 05.22.2019THUNDER MOUNTAIN TESTING
2970 N. Ronlin Avenue / Grand Junction, Colorado 81504
Office (970) 256-9965 / Cell (970) 210-7008 / Fax (970) 314-7067
E -Mail: kxkid39@aol.com / www.thundermountaintesting.com
I-fuddleston-Berry Engineering and Testing, LI ,C
2789 Riverside Parkway
Grand Junction, CO 81503
AT -TN: Mr. Jason Collard
RE:
Dollar General Store
119 Stone Quarry Road
Parachute. CO 8I635
*Field Inspection
Dear Mr. Collard,
May 22, 2019
,Permit #BLCO-06-18-5320
As requested, structural steel special inspection was conducted per the IBC 2015
Edition - Chapter 17: Structural Tests and Special Inspection and the Town on Parachute
requirements. I arrived on-site at 2:15 PM. I net with Mr. Nate Arvin with Altech. Inc. of
Texarkana, Texas to review project requirements and areas ready for inspection. The
purpose of this inspection visit was to confine the repair of deficiencies identified and
reported by Mr. Dan Bricker with 'Thunder Mountain Testing on 5-17-19.
Mr. Arvin directed nie to four locations which bore rejection markings placed by Mr.
Bricker during his inspection. Et was observed that all repair bolting deficiencies had been
adequately tensioned. One additional bolted connection was tested and observed to have
been tensioned to the project bolt tension requirements of snug tight.
Itt;Sl1CClItlIIy StthIlli
1(eile,f dr
William K. Burgin
AWS CWI #11120021
Thunder Mountain Testing
WIIiaru K Burin
CWI 1112002 '
C)C 1 I Xp 121112,(1)
Y1*
Iteyiewrrl Le
titti3il'' . 111�kw
AWS CWI #91040201
ICC' Certified #0863569-S1 & S2
ASNT NDT Level III #30242
Thunder Mouninin Testing
I y 11 !✓ Maxwertll
F/ �IIL U; - �yI�
i 2O2 t