Loading...
HomeMy WebLinkAboutSteel Special Inspection Report 05.22.2019THUNDER MOUNTAIN TESTING 2970 N. Ronlin Avenue / Grand Junction, Colorado 81504 Office (970) 256-9965 / Cell (970) 210-7008 / Fax (970) 314-7067 E -Mail: kxkid39@aol.com / www.thundermountaintesting.com I-fuddleston-Berry Engineering and Testing, LI ,C 2789 Riverside Parkway Grand Junction, CO 81503 AT -TN: Mr. Jason Collard RE: Dollar General Store 119 Stone Quarry Road Parachute. CO 8I635 *Field Inspection Dear Mr. Collard, May 22, 2019 ,Permit #BLCO-06-18-5320 As requested, structural steel special inspection was conducted per the IBC 2015 Edition - Chapter 17: Structural Tests and Special Inspection and the Town on Parachute requirements. I arrived on-site at 2:15 PM. I net with Mr. Nate Arvin with Altech. Inc. of Texarkana, Texas to review project requirements and areas ready for inspection. The purpose of this inspection visit was to confine the repair of deficiencies identified and reported by Mr. Dan Bricker with 'Thunder Mountain Testing on 5-17-19. Mr. Arvin directed nie to four locations which bore rejection markings placed by Mr. Bricker during his inspection. Et was observed that all repair bolting deficiencies had been adequately tensioned. One additional bolted connection was tested and observed to have been tensioned to the project bolt tension requirements of snug tight. Itt;Sl1CClItlIIy StthIlli 1(eile,f dr William K. Burgin AWS CWI #11120021 Thunder Mountain Testing WIIiaru K Burin CWI 1112002 ' C)C 1 I Xp 121112,(1) Y1* Iteyiewrrl Le titti3il'' . 111�kw AWS CWI #91040201 ICC' Certified #0863569-S1 & S2 ASNT NDT Level III #30242 Thunder Mouninin Testing I y 11 !✓ Maxwertll F/ �IIL U; - �yI� i 2O2 t