HomeMy WebLinkAboutSoils Report 05.15.2019RECEIVED
GEOLOGIC REVIEW AND SOILS
ENGINEERING REPORT
223 Eagle Ridge Drive
Parachute, CO
AUG 0 2 2019
GARFIELD COUNTY
COMMUNITY DEVELOPMENT
Prepared For:
Wade Wiggins
Prepared By
CAPSTONE '
ENTERPRISES WEST, L �
GEOTECHNICAL AND MINING ENGINEERING
TESTING AND INSPECTION SERVICES
618 PARTEE DRIVE
GRAND JUNCTION, CO 81504
PHONE (970) 250-3331
martin@capstonewest.com
May 15, 2019
Job No. 4396
CAPSTONE-�sn_: 2ascsa
ENTERPRISES WEST, LLC
GEOTECHNICAL AND MINING ENGINEERING
TESTING AND INSPECTION SERVICES
618 PARTEE DRIVE
GRAND JUNCTION, CO 81501.
PHONE (970) 250-3331
martin@ca pstonewest.co m
May 15, 2019
JOB # 4396
Attention: Wade Wiggins
Grand Junction, CO
Subject: Geologic Review and Soils Engineering Report
223 Eagle Ridge Drive
Parachute, CO 81635
As per the request, Capstone Enterprises West, LLC (Capstone) performed a site
specific geotechnical investigation of the aforementioned parcel. The purpose of
this work is to make foundation recommendations for the construction of a new
home at the site.
SITE LOCATION
The property is a 0.29 parcel located on the the section line between sections 16
&17 T7S R97W. The following image shows the general location.
SITE DESCRIPTION
The site was previously grazing land, prior to the development to the Battlement
Mesa Golf Community. The property slopes gradually to the south.
CAPSTONE ENTERPRISES 4396 2
r
.i•'ri ` 4 "rrur�roe[wl
i r .r
• r+ara' m, -;t•
'......4..14 ..:. :...p.
.'rri =_7ti her.: i.:
--77:!1'
i`fh Irprx
i:1.
1 • ;� :kssaHro 1
s •
'Site Location
f [ .- k J '. ^,/n-'`. �.._. • `Y iNlli[f1911 f
':'=�:;: .i:• �:eletil/n41AI ry�S,t 7._...._.
:lit km:IHith—"Ai,
%,...:;......:,,,—;.4.,:.,,,....1.,_{.....,....",..u.,,..!..-
.IyS'-t: Ir
.tit F
y .:nrmrn
1 tirmrlef«cr 1
1r• sy
$n1,I,�Knr i
1.V41111.lert
GEOLOGIC DESCRIPTION
Bedrock in the area has been mapped as Wasatch Formation (Tws and Twm).
However, the bedrock is covered with a layer of alluvial/colluvial mudflows
mapped as the Lands End Formation (Qla). A portion of the USGS Geologic Map
of the DeBeque Quadrangle shows the regional geology of the site.
Qa Ic
QoJ
CAPSTONE ENTERPRISES 4396
Site Location
0 l
Qgmt
.7/25Ta if illi T: ii,;:1S f :CP di 6113
E,i n op:fe•3I1
Cli LI:•ayrit '±ri;e 10 rJn ..ITei deyy�i:lN••Gr:.l;�.;e,p,+
Y.•M 9rlrel 6f bice': els 71:4!lf ierlfid iy9i/.
11t %4b!SSST7i 1.71.rllflr [;
war./ M1.r!'Nf: fR•:r1) M11 I II'4 1 rl[ fr,+ri1+,4
41,01r 1 ee71 nt ,r«i. 71lrrn Ihivklgll :X, It
'1}.r_.
Ogmt
•
•
The following map shows the National Resources Conservation Service's
breakdown of surface soil types in the area.
Rifle Area, Colorado, Parts of Garfield and Mesa Counties
56—Potts loam, 6 to 12 percent slopes
Map Unit Setting
National map unit symbol: jnys
Elevation: 5,000 to 7,000 feet
Farmland classification: Farmland of statewide importance
Map Unit Composition
• Potts and similar soils: 85 percent
• Estimates are based on observations, descriptions, and transects of the
mapunit.
Description of Potts
Setting
• Landform: Valley sides, benches, mesas
Down-slope shape: Convex, linear
• Across -slope shape: Convex, linear
CAPSTONE ENTERPRISES 4396 4
• Parent material: Alluvium derived from basalt and/or alluvium derived from
sandstone and shale
Typical profile
• Hi - 0 to 4 inches: foam
• H2 - 4 to 28 inches: clay loam
• H3 - 28 to 60 inches: loam
Properties and qualities
• Slope: 6 to 12 percent
• Depth to restrictive feature: More than 80 inches
• Natural drainage class: Well drained
• Runoff class: High
• Capacity of the most limiting layer to transmit water (Ksat): Moderately high
(0.20 to 0.60 in/hr)
• Depth to water table: More than 80 inches
• Frequency of flooding: None
• Frequency of ponding: None
• Calcium carbonate, maximum in profile: 15 percent
• Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0
mmhos/cm)
• Available water storage in profile: High (about 10.3 inches)
Interpretive groups
Land capability classification (irrigated): 4e
• Land capability classification (nonirrigated): 4e
• Hydrologic Soil Group: C
• Ecological site: Rolling Loam (R048AY298C0)
Hydric soil rating: No
SUBSURFACE INVESTIGATIONS
Two test pits were excavated on the site. The location is presented on the
following image. The geology of the excavations is presented on the following
page.
GROUNDWATER
No free groundwater was encountered in the test pits. Nor was there evidence of
a seasonal high-water table.
CAPSTONE ENTERPRISES 4396 5
lz
1 `•
•
1 .HR)I I1itP74
a!o1«^w►
' r t amltupm:'
4.6
•
2.1071011111.9
(111:11e17
1
r
TP -1
71D712.111U14
•
.•
•
ifi'nife5aj�Y 7.,
} 2407/7210,1 :.
• !
w— ••: f .'Id11125101 Of
_ >� a 1 -
216717:1117A •
TEST PIT GEOLOGY
TP -2
Topsoil- Silt w/ Roots
Red -Brown Silt w/ Gravel
PI=5
Dry Density = 97.0 pcf-
Moisture
cfMoisture = 10.1%
Tan Silt w/ Gravel
PI = 22
Dry Density = 83.3 pcf I
Moisture = 14.7%
Cobbles in Tan Silt Matrix
Topsoil- Silt w/ Roots
Red -Brown Silt w/ Gravel
PI = 5
ry Density = 97.7 pcf
Moisture = 13.1%
Tan Silt w/ Gravel
PI = 22
Cobbles in Tan Silt Matrix
LABORATORY RESULTS
The suitability for foundation material is generally determined by two tests: the
Swell/Consolidation test and the Atterberg Limits test. The Swell/Consolidation
test consists of placing an undisturbed sample of material in a device that applies
CAPSTONE ENTERPRISES 4396 6
a Toad to the soil. The specimen compacts or "consolidates". After the initial load
stabilizes, the specimen is saturated, and the specimen will either swell or
consolidate further. The test results for the samples from the test pit are
presented below and on the following page.
TP -1 at 2 ft
0.00%
100
-1.00%
-Z00%
-3.00%
x{.00%
-5.00%
-6.00%
-7.00%
-8.00%
-9.00%
-10.00%
PERCENT STRAIN
CONSOLIDATION TEST REPORT
WAT
ER AD
i
DEO
0000
Job No.4396 Parachute
Job Number
Sample Source
Sample Description
Natural Dry Density
Natural Moisture Content
Saturated Moisture Content
APPLIED PRESSURE - psf
Job No.4396 Parachute
TP -1 at 2 ft
Red Silt
97.0 pcf 89% Relative Compaction
10.1% -6.1% From Optimum
26.0%
CAPSTONE ENTERPRISES 4396 7
PERCENT STRAIN
TP -1 at 4 ft
0.00%+
1C
-1.00%
-2.00%
-3.00%
-4.00%
-5.00%
-6.00%
-7.00%
-8.00%
-9.00%
-1 0.00%
CONSOLIDATION TEST REPORT
0
r
WATER, ADC
IED,'/
Job No.4398 Parachute
APPLIED PRESSURE - psf
Job Number
Sample Source
Sample Description
Natural Dry Density
Natural Moisture Content
Job No.4396 Parachute
TP -1 at4ft
Tan Slit
83.3 pcf
14.7%
CAPSTONE ENTERPRISES 4396 8
TP -2 at 2 ft
—1.00%
-2.00%
-3.00%
-4.00%
-5.00%
su
-6.00%
-7.00%
-8.00%
-9.00%
-10.00%
CONSOLIDATION TEST REPORT
c0
WA -ER
ADDED
Jeb No.4396 Parachute
APPLIED PRESSURE- psf
Job Number
Sample Source
Sample Description
Natural Dry Density
Natural Moisture Content
Job No.4396 Parachute
TP -2 at 2 ft
Red Silt
103.1 pcf 94% Relative Compaction
13.1% -3.1% From Optimum
These consolidation tests show that the dry soils will consolidate when saturated
and the well compacted soils will swell slightly when saturated.
The Atterberg Limits Test gives an indication of the mechanical properties of fine
grained materials. The first part of the test is to determine the Plastic Limit of the
material. Then the Liquid Limit is determined. The difference between the Liquid
Limit and the Plastic Limit is defined as the Plasticity Index. Swell potential based
on the plasticity limit (PI) are shown below.
CAPSTONE ENTERPRISES 4396 9
Plasticity Index (PI)
Inherent Swelling Capacity
0-15
Low
10-35
Medium
20-55
High
35+
Very High
(After Seed et al. 1962)
The results of the bulk samples taken from the test pits TP -1 and TP -2 between 1
and 3 feet below the surface indicated the material had low plasticity, indicating
there is a low swelling potential. The tan silt sample had a PI of 22; however, it
falls into the silt category due to the high plastic limit.
Material
Source
Depth
Liquid
Limit
Plastic
Limit
Plasticity
Index
Red -Brown Silt
TP -1&2
1-3 ft
28
23
5
Tan Silt
TP -1&2
3-5 ft 55
33
22
70
60
50
to 40
x
20
10
0
0
UNIFIED SOIL CLASSIFICATION CHART
20
Job No.4396 Parachute
40 60
LfQUWD LIMIT (LL)
80
100
CAPSTONE ENTERPRISES 4396 la
o Tf•182FromTlo$-RCJ19n to
4 TP•182 From 9•lo6 -Tan Sil
CH
ALINE
CL
CLAY
(')
/SILSIL
1 (M)
MH OR
CL -ML
M ML0tOL
20
Job No.4396 Parachute
40 60
LfQUWD LIMIT (LL)
80
100
CAPSTONE ENTERPRISES 4396 la
1 determine the relative compaction of the native state, a Standard Proctor test
was performed on a TP -1 and TP -2 composite bulk sample from 1 to 3 feet below
the surface. The results are presented below.
Wade Wiggins
Parachute
Job No.4396
120.0
118.0
116.0
cd 110.0
108.0
106.0
104.0
102.0
MOISTURE -DENSITY RELATION (ASTM D-698)
Reddish Silt
109.4 pcf @ 16.2%MOISTURE
100.0
10%
12% 14% 16% 18% 20% 22% 24%
MOISTURE CONTENT %
CAPSTONE ENTERPRISES 4396 J.J.
DESIGN CONCERNS
The materials were very similar in both test pits, with the reddish brown silt at the
foundation elevation. The surface soils were moderately dry. The dry soils are
prone to collapse when saturated. Therefore, the depth of moisture conditioning
should be deep enough to mitigate this risk. The tan silt had a PI of 22 indicating
moderate swell potential; however, the native sample showed consolidation when
saturated and very little rebound in the swell/consolidation test.
FOUNDATION RECOMMENDATIONS
Based on the amount of consolidation observed, Capstone recommends the
structure be built on a stemwall and footer system. The maximum bearing Toad
The material below the footer shall be compacted to greater
than 95% of the Standard Proctor at +/- 2% of optimum moisture content. The
should be 1,250 psf.
compacted area shall extend a minimum of 2 feet beyond the actual foundation
limits, The depth of subgrade compaction should be a minimum of 2 feet. The
following sketches show the general arrangements. Essentially, the topsoil with the
abundant roots is removed and the foundation is built 1 foot below the existing
ground.
Landscape Backfill +92% Compaction at or above Opt MC
Native Backfill +95% Compaction +/- 2% Opt MC
Subgrade Moisture Conditioned and Compacted
+95% Compaction -0/+2 Opt MC
EXCAVATION
Capstone personnel should be contracted to observe the excavation to assess the
subgrade and make any changes if warranted. The foundation envelope should be
CAPSTONE ENTERPRISES 4396 12
cleared of the topsoil containing abundant roots (approximately 12" minimum). The
foundation envelope should extend a minimum of 2 feet beyond the actual
foundation limits (including any pads isolated from the stemwall). This material may
be used for backfilling around the foundation and surface grading away from the
house.
COMPACTED MAT
In order to minimize the risk of differential settlement, Capstone recommends that
the footprint of the house be moisture conditioned to consolidate the poorly
consolidated native soils. ibis moisture conditioning should be to a minimum of 2
feet below the foundation. One foot should be removed from the foundation
envelope (and processed to uniform moisture and texture), then the envelope area
should be scarified 6 to 8 inches deep and moisture conditioned. Ideally this
moisture conditioning would be done toward the end of the day to allow the
moisture to soak in overnight. Frozen material shall never be placed within the
foundation envelope. The scarified and moisture condition subgrade should be
compacted to a minimum of 95% of the maximum dry density at a moisture content
+/- 2% of optimum. Once that is achieved, the material removed from the envelope
can be moisture conditioned and replaced, being compacted to the same 95%
specification.
SLAB CONSTRUCTION
To minimize the risk of driveway and patio distress, the subgrade below them
should be moisture conditioned and compacted a minimum of 1 foot deep.
DRAINAGE AND IRRIGATION
The success of shallow foundation and slab -on -grade floor systems is contingent
upon keeping the sub grade soils at more or less constant moisture content, and
by not allowing surface drainage a path to the subsurface. Positive surface
drainage away from the structures must be maintained at all times (including
construction). Landscaped areas should be designed and built such that
CAPSTONE ENTERPRISES 4396 13
irrigation and other surface water will be collected and carried away from
foundation elements. The final grade of the foundation's backfill and any
overlying concrete slabs or sidewalks should have a positive slope away from the
foundation walls on all sides. We recommend a minimum slope of 10" in the first
ten feet; however, the slope can be decreased to 3" in ten feet if the ground
surface adjacent to the foundation is covered with concrete slabs sidewalks or
pavement.
• As much as practical, we recommend, landscaping vegetation that is
common to semi -arid climates, with low moisture requirements. A "drip"
system of watering could be utilized to keep water usage low. Dry -type
landscaping is encouraged.
• Areas close to foundation elements, where snow will drift and accumulate,
should be protected from standing water during periods of snowmelt.
• Landscaped areas should be placed away from the foundation elements,
and be designed to drain surface runoff away from the foundation
elements.
• The structure should have a rain gutter system that directs water well
away from the foundation elements.
• To reduce the permeability of the backfill around the foundation, it should
be moisture conditioned and compacted as soon as practical.
LIMITATIONS
The analysis and recommendations submitted in this report are based on the test
pit excavations field observations and laboratory testing. The nature and extent of
variation may not become evident until construction. If variations then appear, it will
be necessary to reevaluate the recommendations in this report.
It is recommended that the geotechnical engineer be provided the opportunity for
general review of the final design and specifications inorder that earthwork and
foundation recommendations may be properly interpreted and implemented in the
design and specifications. it is also recommended that the geotechnical engineer,
or a qualified geo-technician under his supervision, be retained to provide
CAPSTONE ENTERPRISES 4396 14
continuous engineering services during construction of the foundation, excavations,
and earthwork phases of the work. This is to observe compliance with the design
concepts, specifications, or recommendations and to modify these
recommendations in the event that subsurface conditions differ from those
anticipated.
The recommendations contained in this report are made in a manner consistent
with the level of care and skill used by geotechnical engineers practicing in this area
at this time. This report contains no warranty either express or implied.
If you have any questions, or if we may be of further assistance, please do not
hesitate to contact us.
Respectfully Submitted:
CAPSTONE ENTERPRISES WEST, LLC
Martin W. Chenoweth, PE
Registered Professional Engineer
MWC
CAPSTONE ENTERPRISES 4396 15