Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-07-19-5854
Stella Mae Olsen Trust
Verizon Cellular Tower Improvements
Replacement of Maintenance Deck & Stair
921 West 9t" Street
Glenwood Springs, Colorado
1) ALL NEW WORK SHALL COMPLY WITH THE 2015 I.B.0 AND MANUFACTURER'S
INSTALLATION REQUIREMENTS.
2) SEE PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
INSPECTIONS POLICIES.
3) WORK SHALL COMPLY WITH CONDITIONS OF THE PLANNED UNIT DEVELOPMENT.
4) STAIRS, LANDINGS AND RAILINGS PER 2015 I.B.C., SECTION 1011 & 1014. INSTALL
HANDRAILS AT BOTH SIDES OF STAIRS.
5) GUARDRAILS PER 2015 I.B.C., SECTION 1015.
6) LANDINGS AT DOORS PER 2015 I.B.C., SECTION 1010.1.6.
7) IF APPLICABLE, ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY
COLORADO STATE ELECTRICAL BOARD.