HomeMy WebLinkAboutArchitect Report 05.23.11Tordan Ár nchitect'ure Tnc.'¿:--:
23May 2All
Garfield County Building'Dept.
Attn: Dave Bartholomew
Re: Irick Residence
109 King Fisher Lane, Aspen Glen
: Foundation,Rebar Inspection
Dave,
Prior to pouring the foundation at the lrick residence, I performed an inspection of the
rebar and foundation placement. My notes follow.
Bar size and spacing coincide with the drawings.
Bar laps are correctly placed.
Vertical bars are correctly placed and tied off.
Double horizontal bars, top & bottom are installed per the drawings
Dowels are in place and coincide with the drawings
Therefore, the foundation and reinforcement pass inspection and are ready to receive
concrete.
submitted,
J
Principal Architect
I
rffiÊfr
$CTTT
ffffRÐpiñ
I I ¡"¡'",r;¡<_r.rç.-{r
4ß20th Street, Suite 204 r P O. Box 1031 o Glenwood Springs, Colorado 81602 o Phone: 970-947-1837 c Fax:970.9+7-0+25
rl,1i'.M
.1
a:
l:#
ii s.
! lo'i1 i¡trþ
JE4aq Archlaecaqre nry
23 i|'day 2011
Garfield County Building Dept.
Attn: Dave Bartholomew
Re: IrickResidence
109 King Fisher Lane, Aspen Glen
Foundation Rebar Inspection
Dave,
Uaon further review of sheet S4.0 that was submitted and approved. The contraclor
asked for a stick frame option for the Roof Framing Plan. Auached is the revised Roof
Framing Plan (Sheet SR4.0) that will replace the previously submitted sheet S4.0.
Included on SR4.0 is Detail 17 the shows the bottom chord of a truss being removed and
replaced to coincide with the new ceiling,in the addition. Upon inspection of the truss,
thè new bottom chord, bearing points, and added columns to support the truss pass
inspection.
I have attached pictures from the field that illustrates Detail 17 at each end of the truss
Respectfully submitted,