Loading...
HomeMy WebLinkAboutArchitect Report 05.23.11Tordan Ár nchitect'ure Tnc.'¿:--: 23May 2All Garfield County Building'Dept. Attn: Dave Bartholomew Re: Irick Residence 109 King Fisher Lane, Aspen Glen : Foundation,Rebar Inspection Dave, Prior to pouring the foundation at the lrick residence, I performed an inspection of the rebar and foundation placement. My notes follow. Bar size and spacing coincide with the drawings. Bar laps are correctly placed. Vertical bars are correctly placed and tied off. Double horizontal bars, top & bottom are installed per the drawings Dowels are in place and coincide with the drawings Therefore, the foundation and reinforcement pass inspection and are ready to receive concrete. submitted, J Principal Architect I rffiÊfr $CTTT ffffRÐpiñ I I ¡"¡'",r;¡<_r.rç.-{r 4ß20th Street, Suite 204 r P O. Box 1031 o Glenwood Springs, Colorado 81602 o Phone: 970-947-1837 c Fax:970.9+7-0+25 rl,1i'.M .1 a: l:# ii s. ! lo'i1 i¡trþ JE4aq Archlaecaqre nry 23 i|'day 2011 Garfield County Building Dept. Attn: Dave Bartholomew Re: IrickResidence 109 King Fisher Lane, Aspen Glen Foundation Rebar Inspection Dave, Uaon further review of sheet S4.0 that was submitted and approved. The contraclor asked for a stick frame option for the Roof Framing Plan. Auached is the revised Roof Framing Plan (Sheet SR4.0) that will replace the previously submitted sheet S4.0. Included on SR4.0 is Detail 17 the shows the bottom chord of a truss being removed and replaced to coincide with the new ceiling,in the addition. Upon inspection of the truss, thè new bottom chord, bearing points, and added columns to support the truss pass inspection. I have attached pictures from the field that illustrates Detail 17 at each end of the truss Respectfully submitted, Principal Architect BfIAPLFY SiJOTT JüRDAÍq to 41020t1¡Süeet, Suite 204 r P O. Box 1031 o Glenwood Springs, Colorado 81602 o Phone: 970.947-1837 o Fax: 970-947.0425