HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-05-19-5760
252Coryell, LLC
Manufactured Steel Building for Assembly & Storage of Cabinetry
252 County Road 167 (Coryell Ridge Road)
Glenwood Springs, Colorado
1) ALL WORK SHALL COMPLY WITH THE FOLLOWING: 2015 l.B.C., l.M.C., I'P.C., l.F.G.C., l.F.C',
AND 2OO9 I.E.C.C. AS WELL AS MANUFACTURER,S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
INSPECTIONS POLICIES.
3) ALL WORK SHALL COMply W|TH "COMMERCIAL LIMITED" ZONE DISTRICT REGULATIONS PER
GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE, AND SEPTIC SYSTEM SHALL COMPLY
WITH GARFIELD COUNTY'S O.W.T.S. REQUIREMENTS.
4l BUtLDtNG AppRovED AS CONSTRUCTION TYPE ll-B AND OCCUPANCY GROUP F-1.: "MODERATE-
HAZARD FACTORY ¡NDUSTRIAL,,. THE MAXIMUM ALLOWABLE QUANTITY OF COMBUSTIBLE OR
HAZARDOUS MATERIALS AS PER I.B.C., SECTIONS 413 & 4L4. HIGH-PILED OR RACK STORAGE
SHALL COMPLY WITH I.F.C., CHAPTER 32.
s) A 3-HOUR "FtRE BARR|ER" tS EMPLOYED TO DIVIDE THE BUILDING INTO 2 SEPARATE FIRE AREAS,
THEREBY ELIMINATING REQUIREMENT FOR AN AUTOMATIC FIRE SPRINKLER SYSTEM, THE FIRE
BARRIER SHALL COMPLY WITH I.B.C., SECTION 707 IN ITS ENTIRETY. CONTACT THE LOCAL FIRE
DISTRICT FOR APPLICABLE I.F.C. REQUIREMENTS, AND FIRE DISTRICTS FINAL APPROVAL REPORT
IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
6) BUtLDtNG tS APPROVED FOR CORE & SHELL CONSTRUCTION. INSULATION ATTHERMAL ENVELOPE
SHALL COMply WITH 2009 LE.C.C., SECTTON 502. INTERIOR TENANT IMPROVEMENTS (INCLUDING
PARTITION WALLS) MAY REQUIRE ADDITIONAL BUILDING PERMITS'
7l oPEN-HOLE SOILS REPORT lS REQUIRED AT FOOTING INSPECTION, 2500 P.S.F.
8) ALL HtcH-STRENGTH BOLTTNG AND FTELD WELDING REQUIRES SPECIAL INSPECTOR PER l.B.C.,
CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
9) EGRESS DOORS SHALL MEET |CC/ANS| A117.1--2009 FOR ACCESSIBILITY. LOCKS, LATCHES &
LANDINGS PER I.B.C., SECTION 1008. VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL
ROUGH-IN INSPECTION.
10) BUtLDtNc SHALL COMply W|TH ACCESSTBILITY REQUIREMENTS PER LB.C., CHAPTER L1AND
tcc/ANSt At17.t-2OOg, INCLUDtNG PARKTNG, SITE ACCESS, ENTRANCES AND RESTROOMS.
BATHROOM FACILITIES TO MEET MINIMUM REQUIREMENTS FOR SIZE, LAYOUT, CLEARANCES,
FEATURES, ETC.
i.1) MECHANTCAL/HEATING SYSTEMS SHALL COMPLY WITH l.M.C. AND |.E.C.C. - SECTION 503.
MECHANICAL ROUGH-IN INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION.
12) PLUMBtNG SHALL COMply W|TH t.P.C. & |.F.G.C. REQUIREMENTS, AND ROUGH-lN INSPECTION
IS REQUIRED PRIOR TO FRAME INSPECTION.
L3) LTGHT & VENTILATION PER l.B.C., CHAPTER 12.
L4) ELECTRTCAL PERMtTTtNG & tNSPECT|ONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL APPROVAL IS REQUIRED
PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.