HomeMy WebLinkAboutScope of Work - InsulationEnergyPro Insulati*rl, Tn*"
912712019
Ion Todd
Jons custom wood working
4il CR261
Silt Co, 81652
PO Box 2(ñ6, Grand.lutrction, CO 81 502 Office 970-623-7327
jontoddbja@gmail.com
80r-645-2574
RE:Corey Addition rev 1
w to fumish and install the ofWork 'Work
Options
Acæpbnæ: Cmtractormaychâìgemd/uwithdmwllisagreermtifc@tactdd6rctræeiveyotsignedâfteptañcewiftinl0buinffidaysafurtlrcdatelidedabove
Tflm of Paymflt COD urless priu pa1mflt mgmts üe nuke between Cutmq üd Contractor.
you sign tiis agment. If perfomæ of this agrffiilt extflds beyond lhme 90 &ys, you agree lo pay CantËctü's tho mflt prícíig fu the Wo* perfored aftø those 90 days
Respectfully Submitæd: Reviewed and Accepted
Work Area NotesR-Value Material
Ceiling Area Flat Install to the ceiling area. þoly and
blow)
R-38 Loose-fill Fiberglass
ExteriorWalls Installed to the exterior walls of the
house addition
R-21 Unfaced Fiberglass
Batt
Crawl space subfloor Install to the crawl space sub-floorR-30 Unfaced fiberglass batt
Penetrations Per Code Fire rated foam installed into
electrical & plumbing penetrations
percode. Includes low expanding
foam to all windows & doors, and
white caulking installed to the
bottom of windows only when
needed.
Air Infiltration Fire Foam
Cardboard baffles installed into
every truss bay ateaves for attic
ventilation.
Ventilation Baffle
(Cardboard)
Ceiling Area FlatAir Infiltration
Install to the flat ceiling ͡s a vapor
barrier
6 mil Poly Ceiling Area FlatAir Infiltration
6 mil black poly sealed to
foundation wall and all seams
laooed and slued.
6 mil Poly Crawl space FloorAir Infiltration
ExteriorWalls Installed to the exterior walls of the
house addition.
Air Infiltration 4 mil Poly
R-Value Material Work Area Notes For the additional
sum of:
R.-24 Dense Pack
Fiberslass
ExteriorWalls Upgrade to Dense Pack in lieu of
R-21
-R-49 Loose-fill
Fiberslass
Ceiling Area Flat Upgrade to R-49 in lieu of R-38
-
Matt Gibson
Customer Date
Page I of1