Loading...
HomeMy WebLinkAboutOWTS Design Report 09.27.19l(tn l(unstAs¡oclat¡c, lnc. 5020 County Road 154 Geotechnical and Mater¡als Eng¡neers Glenwood Springs, CO 81601 and Ênvkonmenralscieilists phonil: (g7o) 945-7ggg fax: (970) 945-8454 email: kaglenwood@kumarusa.com An Employcc Orncd Compony www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado ONSITE WASTEWATER TREATMENT SYSTEM DESIGN PROPOSED RESIDENCE LOT I, SLLTVAN SUBDTVISTON TBD COUNTY ROAD 335 GARFTELD COUNTY, COLORADO PROJECT NO. 19-7-291.02 SEPTEMBER27,2019 PRT,PARED FOR: JOHN GOSS 4726 COANTY ROAD 335 NEW CASTLE, COLORADO 81647 @ TABLE OF CONTENTS INTRODUCTION 1 IPROPOSED CONSTRUCTION SITE CONDITIONS.... SUBSURFACE CONDITIONS OWTS ANALYSIS DESIGN RECOMMENDATIONS SOIL TREATMENT AR84...... owTS COMPONENTS ............ OWTS OPERATION AND MAINTENANCE OWTS HOUSEHOLD OPERATION OWTS MAINTENANCE OWTS CONSTRUCTION OBSERVATION LIMITATIONS.......... F'IGURES FIGURE 1 _ OWTS SITE PLAN FIGURE 2 - USDA GRADATION TEST RESULTS FIGURE 3 _ SOIL TREATMENT AREA CALCULATIONS FIGURE 4 _ SOL TREATMENT AREA PLAN VIEW FIGURE 5 _ SOIL TREATMENT ARE CROSS SECTION FIGURE 6 _ DISTRIBUTION LINE CLEANOUT DETAIL ATTACHMENTS VALLEY PRE,CAST 1,OOO GALLON, THREE-CHAMBER SEPTIC TANK DETAIL ORENCO PF3OO5 PUMP PERT'ORMANCE CURVE a a-J- -4- 4 6 -9- 9- ...- 10 - - 11- - 11- Kumar & Associates, lnc.Project No. 19-7 -291.02 INTRODUCTION This report provides the results of an onsite wastewater treatment system (OWTS) design for the proposed residence located on Lot l, Sillivan Subdivision, TBD County Road 335, west ofNew Castle, Garfreld County, Colorado. The purpose of the report is to provide design details for the OWTS in accordance with the 2018 Garfield County Building Department Onsite Wastewater Treatment System Regulations and the Colorado Department of Public Health and Environmental Regulation#43. The services were performed as part of our agreement for professional services to John Goss dated May 9, 2019. We previously conducted a subsoil study for foundation design for the residence and presented our findings in a report dated June 27, 2019, Project No. 19-7-291. PROPOSED CONSTRUCTION The proposed residence will be a single story, modular structure over a basement level located on the lot as shown on Figure l. Ground floor will be slab-on-grade floor. The proposed residence will have three bedrooms. The proposed soil treatment area (STA) for the OWTS will be located to the south of the proposed residence as shown on Figure l. Water service will be provided by a well located as shown on Figure 1' If proposed construction is different than that described, we should be contacted to re-evaluate our design recommendations. SITE CONDITIONS The lot is vacant. The lot primarily consists of the Colorado River, steep banks down to the river and small terraces along County Road 335. The site consists of two gently sloping areas connected by a narrow strip. The residence is proposed in the north area. There is a large fill pile on the south area near the proposed STA. Vegetation consists of grass and weeds with Kumar & Associates, lnc.Project No. 19-7 -29'1.02 2 pinyon and juniper trees on the riverbank. The Colorado River flows to the west and in elevation far below the building area and terraces. A 25 feet setback it required from the STA to the steep slope on the site and a 100 feet setback is required to the well from the STA. SUBSURFACB CONDITIONS The field exploration for the OWTS was conducted on May 30, 2019. Two profile pits (Profile Pits 1 and 2) were excavated with a backhoe at the approximate locations shown on Figure I to evaluate the subsurface conditions at alternate planned soil treatment areas for the OWTS. The pits were logged by a representative of Kumar & Associates. Logs of the profile pits are provided below. Log of Profile Pit I Log of Profile Pit 2 The soils encountered in profile pits consisted of about 6 inches of topsoil of overlying Loamy Sand to the pit depths of 8 feet. Hydrometer and gradation analyses were performed on a disturbed bulk sample of the soils from Profile Pit 2 from 2 to 3 feet depth with the results Depth USDA Classification 0-6"TOPSOL;organic Sandy Loam, firm, moist, brown. 6"-8',LOAMY SAND; single grain structure, medium dense, moist to slightly moist, brown to tan. a a a Disturbed bulk sample obtainedfrom 3 to 4 feet' Bottom of pit @ 8feet. No.free water or tc s observed at time excavation. Depth USDA Classification 0-6"TOPSOL;organic Sandy Loam, firm, moist, brown 6"-8',LOAMY SAND; single grain structure, medium dense, moist to sl ightly moist, brown to tan. a a a Disturbed bulk sample obtainedfrom 2 to 3 feet Bottom of pit @ I feet. No free water or redoximorphic observed at time of pit excavation. Kumar & Associates, lnc.Project No. 19-7 -291.02 -J- provided on Figure 2. The tested sample (minus No. 10 size sieve fraction) classified as Loamy Sand per the USDA system. Based on the subsurface conditions, the soils have been classified as Soil Type 1 per State regulations. No free water was encountered in the pits nor indications of seasonal high groundwater observed at the time of excavation. Based on the subsurface conditions and laboratory testing, the soils at the STA have been classified as Type 1 per State regulations, which equates to a long-term acceptance rate (LTAR) of 0.80 gallons per square foot per day. OWTS ANALYSIS Based on the site conditions and profile pit evaluations, the evaluated areas should be suitable for a pressure-dosed infiltration disposal system. Due to set-back requirements and the topography of the site, the STA will need to be located on the south bench area near the existing fill pile. The system will consist of chambers in a trench confìguration. To accommodate for possible future development, the STA will be sized for three bedrooms in the proposed residence and one additional bedroom for a total of four bedrooms and an average daily flow of 75 gallons per person and two persons per bedroom using an LTAR of 0.80 gallons per square foot per day for the natural soils. The sewage will gravity flow from the residence to the septic tank for primary treatment and then be pressured-dosed on a regular basis from the tank to the STA for dispersal and final treatment. Any basement area facilities will need to be pumped to the tank and should be designed by the plumber. The STA will consist of three trenches with Infiltrator chambers. Equal distribution will be provided to the trenches by an automatic distribution valve (ADV). Due to the setback distance from the well and the elevation change to the STA, the system needs to be pressure dosed. The pressure-dosing to the STA also allows for a reduced field size. A 25 feet minimum setback from the STA and a 10 feet minimum setback from the septic tank are required to the edge of the bank. The setbacks are shown on Figure L Based on site measurements, these components are near to these minimum setbacks and their locations should Kumar & Associates, lnc.Proiect No. 19-7 -251.02 -4- be confirmed prior to construction to veriff adequate setback. The effluent line from the septic tank to STA will likely encroach on the 10 feet minimum setback to the top of the bank and should be double encased with larger diameter Schedule 40 or stronger pipe along the entire length of the encroachment which is essentially the entire length of the effluent pipe. A 100 feet minimum setback from the STA and a 50 feet minimum setback from the septic tank are required to the existing well located in the north part of the site. The setbacks are shown on Figure 1. Based on site measurements, the well appears to be approximately 280 feet from the STA and 100 feet from the septic tank. The location of the STA and septic tank with respect to the well should be confirmed prior to construction to veriff adequate set-back. The waterline from the well to the building should have adequate set-back from the OWTS components. Currently a dirt fill pile approximately l0 feet tall is in the area of the proposed STA. The fill pile should be removed to the natural ground surface prior to construction. The underlying native soil is loamy sand and should elastically rebound after removal of the pile without lasting compaction effects. DESIGN RECOMMENDATIONS The design recommendations presented below are based on the proposed construction, the site and subsurface conditions encountered and our experience in the area. A layout ofthe proposed OWTS components is provided on Figure 1. If conditions encountered during construction are different than those that are described in this report, please contact us to re-evaluate our design recommendations. SOIL TREATMENT AREA ¡ The STA will consist of three trenches with 12 Infiltrator Quick 4 Plus Standard chambers placed in each trench (36 chambers total) on the native Loamy Sand soils. A pressure distribution system will be used to disperse the effluent to the trenches on a regular basis. o The STA was sized based on an LTAR of 0.80 gallons per square feet per day. Kumar & Associates, lnc.Project No. 19-7 -29'1.02 5- r Each chamber was allowed 12 square feet of area. A20% reduction in the STA was applied for pressure dosing to a trench and a30Yo reduction of the STA size was applied for use of Infiltrator chambers in a trench configuration. The total STA is 432 square feet. Soil treatment area calculations are shown on Figure 3. ¡ Distribution lines, consisting of 1.5-inch diameter, Schedule 40 piping, with 3/16-inch orifice holes drilled at 4-foot centers near the center of the chambers, should be installed along the complete length of the chambers, see Figure 4. The distribution lines should be suspended approximately 2 inches from the top surface of the infiltrators by pipe ties. The orifice holes should face up toward the chamber surface above. o AVa-inch hole should be drilled on the bottom of each end of the distribution pipe to allow for complete drainage of the distribution line following pressure dosing. Install splash plates below drain holes' ¡ The trenches should be oriented along ground contours to minimize soil cut and cover. o The base and sidewalls of the trench excavations should be scarified prior to the chamber placement. . A minimum of 12 inches and a maximum of 24 inches of cover soil should be placed over the chambers. . Backfill should be graded to deflect surface water away from the STA and should be sloped at 3 horizontal to 1 vertical or flatter. o Disturbed soil should be re-vegetated as soon as possible with a native grass mix. No trees, shrubs or other plants with deep roots should be planted on or near the STA as this may damage the sYstem PiPing' . Four-inch diameter inspection ports should be installed vertically into the knockouts provided in the chamber end caps. Install ports at each end of the trench. The inspection port piping should be screwed into the top to the chambers and should not extend down to the ground surface inside the chambers. The inspection ports should extend at least 8 inches above the finished ground surface or be protected in a valve box at finished grade. o A plan view of the STA is presented on Figure 4 and a cross section of the STA is presented on Figure 5. o Cleanouts are required at the end of the distribution line. See Figure 6 for the cleanout detail. Kumar & Associates, lnc.Project No.'19-7 -291.02 -6- OWTS COMPONENTS Recommended OWTS components provided below are based on our design details and our experience with the specific component manufacturers. Equivalent components may be feasible but need to be approved by us prior to construction. Septic Tank o A 1,000 gallon, three-chamber septic tank (1,500 gallons total) will be used for primary treatment and dosing to the STA. The frrst two chambers of the tank will be utilized for treatment and settling, and the third chamber will contain the dosing pump. A detail of the tank is provided as an attachment to the report. o A submersible effluent pump enclosed in a Biotube Pump Vault will be installed in the third chamber. o The tank must be a minimum of five feet from the residence and from the STA. The tank must be a minimum of 10 feet from any potable water supply lines and the edge of the steep slope. The tank must be a minimum of 50 feet from the well. ¡ The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling coufse. o The tank lids must extend to final surface grade and made to be easily located. ¡ Install the tank with2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. Sewer Pipe o The sewer line to the septic tank should not be less than the diameter of the building drains and not less than 4 inches in diameter. ¡ The sewer pipe should have a rating of SDR35 or stronger' r The sewer pipe should be sloped between 2o/o to 4o/o to help limit disturbance of solids in the tank and potential sewage bypass of the first chamber of the tank. If a steeper slope is needed, this can be accomplished with vertical step-downs in the sewer line. Kumar & Associates, lnc.Project No. 19-7 -291.02 -7 - a a A minimum 36 inches of cover soil should be provided over the sewer pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas, and the pipe be insulated on top and sides with 2-inch-thick blue foam insulation board. If adequate soil cover is not possible, we should be contacted for re-evaluation prior to installation. The sewer pipe should be double encased with larger diameter Schedule 40 PVC pipe underneath driveway surfaces and be provided with at least 36 inches of soil cover and be insulated on top and sides with 2-inch thick foam board insulation. The encasing pipe should be sealed at both ends. The sewer pipe should be bedded in compacted'A inch road base or native soils provided that the native soils contain no angular rocks or rocks larger than 2Yz inches in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing effluent to freeze and damage the PiPing. Install cleanout pipes within 5 feet of the building foundation, where the sewer pipes bend 90 degrees or more and every 100 feet of sewer pipe. All 9g-degree bends should be installed using a 9O-degree long-sweep or by using two 45-degree elbows. The sewer line location shown on Figure I is considered conceptual. We assume that there will be only one sewer line exiting the residence. It is the responsibility of the owner/contractors to locate all sewer line exit locations and connections to the septic tank. We should be notified if there are other sewer lines exiting the building. a o o Effluent Transport PiPing ¡ The effluent transport pipe should be 1.5-inch diameter Schedule 40 piping sloped at2Yo minimum to drain back from the ADV to the dose tank and from the ADV to each trench The ADV should be the high point of the system. . The effluent transport pipe should be bedded in compacted3á inch road base or native soils provided that the native soils contain no angular rocks or rocks larger than2% inches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage to the piping. Kumar & Associates, lnc.Project No. 19-7 -291.02 o a a a -8- A minimum l8 inches of cover soil should be provided over the effluent transport pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost. We recommend 48 inches of soil cover over the effluent pipe and insulation with at least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible, we should re-evaluate the condition prior to installation. The effluent pipe should be double encased with larger diameter Schedule 40 PVC pipe underneath driveway surfaces and be provided with at least 48 inches of soil cover and be insulated on top and sides with 2-inch-thick foam insulation board. The effluent pipe should be double encased with larger diameter Schedule 40 PVC pipe wherever the effluent pipe encroaches nearer than 10 feet from the bank. The encasement should be sealed at both ends. All 9g-degree bends should be installed using a 90 degree long-sweep or by using two 45-degree elbows. Effluent Pumping System o An Orenco PF3005, I15-volt, submersible effluent pump with a L25-inch diameter discharge assembly, or equivalent, will be required for effluent pumping. ¡ The maximum effluent transport distance from the pump discharge to the STA estimated to be 200 feet. o The elevation difference from pump discharge to the STA is estimated to be 1l feet. o The pump should be enclosed in an Orenco Biotube Pump Vault for effluent frltering and protection of the pump from vibration. o An equivalent pump must be capable of operating at 12.7 gallons per minute at23.2 feet of total dynamic head. A pump perforrnance curve is provided as an attachment to this report. o The floats should be set to provide a dose volume of approximately 133 gallons. The actual dose volume will be about 112 gallons assuming 21 gallons of drainback in the transport line. To achieve the desired dose volume, the upper ("ON") and lower ("OFF") floats should be set approximately 1 1% inches apart. ¡ The flow differential between the first and last orifices is estimated to be 7.7o/o. Kumar & Associates, lnc.Project No.'19-7 -291.02 a a -9- The high-water alarm float should be placed approximately 3 inches above the "ON" float in the dose tank. The high-water alarm must be wired on a separate electrical circuit from the pump. AY, inch diameter weep hole should be drilled in the effluent transport line prior to exiting the dose tank so the transport line can drain after each pumping cycle. Automatic Distributing Valve o An Orenco V6403 Automatic Distributing Valve (ADV) will be used to distribute effluent to the three trenches. . The ADV must be installed level and must be the high point in the system. ¡ The ADV should be installed in a sprinkler box, or equivalent, such that it is serviceable and protected from freezing. We recommend the ADV be equipped with heat tape for additional frost protection during winter months. ¡ We recommend the ground surface be graded away from the ADV in all directions. Improper surface drainage could cause standing water to freeze and damage the valve and/or piping. ¡ The valve has clear sections of pipe that should be inspected at least annually to ensure that it is alternating doses to each trench. OWTS OPERATION AND MAINTENANCE The OWTS will require periodic inspection and maintenance to function properly. A properly designed, installed and maintained system can greatly increase its lifespan. The level of maintenance will vary depending on the complexity of the system and water use habits of the residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be developed. Depending on the complexity of the system, a contract with an OWTS maintenance provider may be prudent. Below are some basic recommendations for the OWTS O&M. OWTS HOUSEHOLD OPERATION Use of high efficiency water fixtures is recommended to decrease the hydraulic load ona Kumar & Associates, lnc.Project No, 19-7 -29'1.02 -10- the OWTS system. Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil absorption system. Do not irrigate the area on top of or directly upgradient of the soil absorption field as this may cause a hydraulic overload. Do not dispose of household waste down drains as this may clog or damage OWTS components. Examples of household waste includes: dental floss, cotton swabs, coffee grounds, paper towels, feminine products and many other kitchen and bath items. Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized, kitchen wastewater should be screened thoroughly. Many kitchen solids are not decomposed in the septic tank and may cause increased tank pumping frequency. Do not dispose of household chemicals, greases, oils, paints, hot tub water or water softener backwash in household drains. A separate drywell, if feasible, may be necessary for hot tub water or water softener backwash disposal. Limit the use of bleach as this may harm useful bacteria in the septic tank and soil absorption system. Liquid dishwasher and clothes washer detergent is recommended for households served by an OWTS. Clay substances used as fillers in powder detergents may result in clogging of the soils absorption system. The effluent in septic tanks can freeze during extended periods of non-use in cold weather. We recommend that a tank heater be installed in this system to help prevent freezing. OWTS MAINTENANCE Inspect the septic tank, pump, pump vault filter, ADV and STA at least annually for problems or signs of failure. The filter should be cleaned annually by spray washing solids into the first chamber of the septic tank. The septic tank should be pumped and cleaned every 3 to 5 years depending on use. Longer pumping intervals may increase the amount of solids that reach the STA, which a a o a a a a a a a a Kumar & Associates, lnc.Project No. 19-7 -291.02 a - 11- may shorten its life span. pumping of the septic tank should take place when the level of the sludge and scum layers combined take up 25 to 33o/o of the capacity of the first chamber of the tank. OWTS CONSTRUCTION OBSERVATION The Garfield County Building Department requires that the designer of the system provide a record drawing and certification of the OWTS construction (As-Built inspection). We should be provided with at least 48-hour notice prior to the installer needing the inspections. Prior to issuance of our certification letter, we require observation of all system components prior to backfill. The number of site visits required for the inspection will depend on the installer's construction schedule. LIMITATIONS We have conducted this design in accordance with generally accepted engineering principles and practices in this area atthis time. We make no warranty either expressed or implied. The recommendations provided in this report are based on the site conditions, profile pit evaluations and soil texture analysis, the proposed construction and our experience in the area. Variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and fìeld services during construction to review and monitor the implementation of our recommendations, and to verifr that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to our design. It is our opinion that the designed location of the OWTS components does not violate any setback requirements of the current Garfield County Regulations with the exception of the Kumar & Associates, lnc.Project No. 19-7 -29'1.02 -t2- effluent line which has been addressed in the design portion of this report. Below is a table of common minimum horizontal setbacks to OWTS components. Refer to the Garfield County Regulations for a complete list of required setbacks. We recommend the OWTS components be surveyed by a Professional Colorado Land Surveyor. Table 1- Common Minimum Horizontal Setbacks from OWTS Please contact us for any necessary revisions or discussion after review of this report by Garfield County. If you have any questions, or if we may be of further assistance, please let us know Respectfully Submitted, Kumar & Assoeiates, fnc. Shane M. Mello, Staff Engineer Reviewed by: David A. Young, P.E. sMMnjf Septic Tank Occupied Dwelling Lined Ditch or Lake Lake, Irrigation Ditch, Stream Dry Ditch or Gulch Wells Water Supply Line 20'10'50'2s',t525',STA 100' )5 10'50'10'50'10'Septic Tank 0'10'50'10'50'5'Building Sewer Kumar & Associates, lnc.Proiecl No, 19-7-291.02 *\.I{l\t r'.Dr-lit'--xl.'åORìVE\'ItlstNcaccEssuor**2] OO'SETBACK14It\{.ì*EUIú]NffiYBUILOIÑG fOOPRIMIFffiFSÛTBOMroporsñr -VALLEY PRECASTl.OOO GALLON THREE CHAMBERSEPTIC TANK WITH AN ORENCOPF3OO5 EFFLUENT PUMPINSTALLED IN'THE THIRDCHAMBER.tNV lN EL = 5s79'.--''\ -'1.rå'*ç:3 BEDROOMRESIDENCEMAIN FF EL = 5585'l,ll;\LOT 11 7.32 ACRES.:.'ìsoTMENT AREA(sTA) C0NSiSTING 0F 3 R0WS 0F 1 2INFILIRA'IOR OUICK4 PLUSSTANDARD CHAMBERS (36CHAIVBERS TOTAU.BOTTO|V] 0F TRENCHES EL = 5589.5'n¡coveno vetowPHSÍTC Cæ tS S5n WC',/t/..\'.\coØ8ADo300iir-;*E:_ttVFBSCALE-FEETLOT 1 SILLIVAN SUBDIETNCffiAMtoP or 3å'IUMNUM cÂP AT ìH[s0ul8oNt SffiEENTHCoFñ$ftryAIl0N:55&.42(19ð8 NÀVo 0AIUM)EXEMPTION 1AMENDEI)NEW CASTLE, COLONADONOTES:1 BÍAfiINGSSHOWN ANE ÆRSUBDMSION EIII4NON,1$AMENDFO, RN 802079,2. THIS TOPOGRAPTIIC MAP OOTS NO-T CONSTIIUTT A MONUMEI'IITO LÅJ'{D SURVEY.PROPOSED ORENCO V6403AU-IOMATIC DISTRIBUTINGVALVE (ADV).EL : 5590'_ -.-__=*:-9\ '.:-\-.-,{?,.,,¿,b'1RffiMDPUSC tÆ'6 $572 WCTl(oo=-l(t(,/)=rflTt-z.^c30)eoØØo9.9¡oU'(oI!IN)(obN) = E too 90 ao 70 co 50 40 30 20 to o o fo 20 30 40 50 60 70 80 90 a too DIAMETER OF PARTICLES IN MILLIMETERS CLAY COBBLES mm .02 .05 .l SAMPLE OF: LOAMY SAND FROM: PROFILE PIT 2 AT 2 10 5 FEET 2mm 5 20 76 ENTIRE SAMPLE GRAIN SIZE(-.)SIEVE SIZE % FINER 't27.OO 5 f00 76.00 5"100 38-t0 1-r /2"r00 l9-05 3/1"r00 9.50 3/8'r00 1.75 ,1 99 2.00 #f0 97 r.00 {f8 s¿ 0.50 #35 86 0.25 #60 6¿ 0.t06 *1 10 59 0.045 #323 21 PARTICLE SIZE DISTRIBUTION % COBBLES 0 GRAVEL 3 SAND 73 SILT 20 CLAY 1 PORTION OF SAMPLE PASSTNG #r0 STEVE PARTICLE SIZE DISTRIBUÏION % SAND 75 SILT 2t CLAY 1 TOTAL SAMPLE RETAINED ON #10 SIEVE: 3% GRAIN SIZE(.-)TIME PASSED (min)% FINER 0_037 f t4 0.0t9 1 12 0.009 19 I 0.005 60 7 0.002 ,135 1 0.001 I 545 2 PERCENT OF MATERIAL RETAINED ON #10 SIEVE PASSING 3,/,+" SIEVE: 10O% NOTE: Hydromêtår Anolysís wos performed on o bulk somplo following screaning of oll mol€rlol lorger thon the #10 sieve (2.0 mm) per USDA guídelines. lh€sc l.et rosulls opply only lo lho lompbs *hich w.r. f!¡i.d. thc lalllng r.port lholl not ba r.prôduc.d, rxcrpl ln full, wllhoul lh6 wrltl.n dpprovol of Kuñor & A.soclol.., lnc. Sl€y€ onolylir t.ll¡ng ¡! parfomrd ln occordoncs w¡lh ASTY 0422, ASTM Cl36 ond/or ASTM Dll,l0. SIEVE ANALYSISHYDROMETÉR ANALYSIS U.S. STANDARO SERIES CUAR SOUARE OPENINGSTIYE READINOS 2' HRS 7 HRS ixttr GRAVELSANDSILT IVEDIUM co.v. co.FINE IVEDIUI\,I COARSEFINEco.V. FINE FINE 19-7 -291 .02 Kumar & Associates USDA GRADATION TEST RESULTS Fig. 2 OWTS SO IL TREATMENT AREA CALCULATIO NS In accordance wilh the Gafield County OWTS Regulations and the Colorado Department of Public Health and Environment's Regulation #43, the soil treatment area was cabulated as follot¡rs: CALCUTATION OF OWTS DESIGN FLOW: Q = (FXBXN) WHERE: Q = DESIGN FLOW F = AVERAGE FLOW PER PERSON PER DAY B = NUMBER OF BEDROOMS N = NUMBER OF PERSONS PER BEDROOM PROPOSED RESIDENCE 75 GALLONS PER DAY 4 BEDROOMS 2 PERSONS 600 GALLONSPERDAY l- $= N- a- CALCULATION OF OWTS SOIL TREATMENT AREA: MINIUMUM TREATMENT AREA = Q + LTAR WHERE: Q= LTAR (SOIL TYPE 1) = MINIMUM SOIL TREATMENT AREA = REDUCTION FACTOR FOR CHAMBERS = REDUCTION FACTOR FOR PRESSURE DOSING TO TRENCH = MINIMUM SOIL TREATMENTAREA WITH REDUCTION = AREA PER INFILTRATOR QUICK 4 STANDARD CHAMBER = TOTAL CHAMBERS NEEDED = NUMBER OF TRENCHES = CHAMBERS PERTRENCH = TOTAL NUMBER OF CHAMBERS AS DESIGNED = TOTAL SOIL TREATMENTAREA = 750.0 SQUARE FEET 0.70 0.80 420 SQUARE FEET 12 SQUARE FEET 35 CHAMBERS 3 12 CHAMBERS 36 CHAMBERS 432 SQUARE FEET 600 GALLONS PER DAY 0.8 GALLONS/FTTDAY Fig. 3SOIL TRTATMENT ARTA CALCULATIONSKumar & Associates19-7-291.02 1.5'DIAMETER SCH. 40 SOLID PVC PIPE SLOPED AT 2% MIN. TO DRAIN BACK TO DOSE TANK oRENCO V6403 AUTOMATIC DISTRIBUTION VALVE (ADV) 1.5' DIAMETER SCH.40 SOLID PVC PIPE SLOPED AT 2% MIN, TO DRAIN TO TRENCHES DRTLL ONE å' DIAMETER HOLE ON THE BOTTOM OF EACH END OF DISTRIBUTION PIPE TO ALLOW FOR COMPLETE DRAINAGE. INSTALL SPLASH PLATES BENEATH DRAIN HOLES INFILTRATOR OUICK 4 PLUS STANDARD CHAMBERS IN THREE TRENCHES, 12 CHAMBERS IN EACH TRENCH. 36 CHAMBERS TOTAL. 4INCH DIAMETER PVC OBSERVATION PORTS INSTALLED VERTICALLY INTO KNOCKOUTS PROVIDED IN END CAPS. INSTALL PORTS AT EACH END OF EACH TRENCH. REMOVABLE LID TO BE PLACED ON TOP OF PIPE. PIPE MUST STICK UP AT LEAST 8 INCHES ABOVE FINISHED GRADE OR BE PLACED AT GRADE IN AN ACCESSIBLE VALVE BOX. PIPES SHOULD NOT EXTEND TO SOIL SURFACE AND SHOULD BE SECURED TO CHAI\¡BER WITH SCREWS OR COUPLINGS TO PREVENT SLIDING DOWNWARD. INFILTRATOR QUICK 4 PLUS CLEANOUTS INSTALLED AT END OF EACH DISTRIBUTION LATERAL. SEE FIGURE 6 FOR DEIAIL 1.5"SCH. 40 PVC DISTRIBUTION PIPE WITH %6'DIAMETER HOLES DRILLED AT 4 FOOT CENTERS ON TOP OF EACH PIPE. PLACE HOLES NEAR CENTER OF EACH CHAI\¡BER- PIPE TO BE INSTALLED LEVEL AND SECURED WITH 120 LB. MIN. TENSILE STRENGTH CABLE TIES AT EACH END OF EACH CHAMBER, STANDARD END CAP 10 0 20 SCALE-FEET Notes:jfthambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if necessary. 2. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of trench excavations should be scarifìed prior to chamber installation. 3. Fill placed over the soil treatment area should be properly benched into the hillside. 4. Changes to this design should not be made without consultation and approval by Kumar & Associates, S. Referio the 2018 Garfield County Onsite Wastewater System Regulations for other applicable specifications, Fig.4SOIL TREATMENT AREA PLAN VIEW9-7-291.0 Kumar & Associates lnfiltrator Quick 4 Plus Standard Chamber lnstalled Level Þ 12" min. 24" max. Cover Soil Graded to Deflect Surface Excavate 36" -- Wide Trench WaterExisting Fill Pile to be Removed Ground Surface Scarify ground surface Prior to chamber placement. Notes: .l . chambers should be lnstalled level on a scarified ground surface. concrete sand may be used as a leveling course if necessary' 2. care should be taken by the contractor to avoid compaction of the natìve soils in the trench areas. The base and side walls of trench excavations should be scarified prior to chamber installation. 3. changes to this design should not be made without consultation and approval by Kumar & Associates' 2 2-5 SCALE- FEET Native Soil Undisturbed Soil Between Trenches Fig. 5SOIL TREATMENT AREA CROSS SECTIONKumar & Associates9-7 -291.0 lnsulate lid with 2" blue boardlnstall 6" valve box at ground surface Ground Surface Backfill valve box to bottom of cap with onsite soil 1.5" Sch, 40, threaded cap -1.5" Sch. 40, 90" long-sweep or two 45" elbows APPROXIMATE SCALE: lINCH:3FEET Notes: 1. All piping, fittings and valves should be Sch. 40 PVC. 2. lnstall distribution line cleanouts at the end of each distribution line. 49-7 -291 .0 Kumar & Associates DISTRIBUTION LINE CLEANOUT DETAIL Fis. 6 looor€GP.llll (f 5OO Gallon Total Volume) DESIGN NOÏES. Design per performonce test per ASlìrl c1227o Top surfoce oreo 62.3 ft2¡ fc O 28 do¡æ; concrete = 6,000 PSI Min. lnstollotion:¡ Tonk to be set on 5' min. sond bed or peo grovel¡ Tonk to be bockfilled uniformly on oll sides in lÍfts less thon 24" ond mechoñ¡colly compoctedr Excovoted moteriol moy be used for bockfill, províded lorge stones ore removed. Excovot¡on should be dewotered ond tonk f¡llêd with woter pr¡or to bêing put in service for lnstqllotion with woter toble less thon 2' below grode. Meets C1644-06 for roslllent connectorê¡ lnlet ond Outlet identifled obove pipe¡ Delivered complete with înternol piping¡ Control Ponel to be mounted in sight líne of tonk¡ 4' Moxímum bury depth Top View 6l J" l¡lúrrllt RLülhþht Rl¡e¡e b Grde DhsrËt VdtË Dbdügr Boot l{.leht Ru!ôcr Sch ALLOWABLE BURY (Bosed on Woter Toble) WAIER TABLE ALLOWAËLL EAR]H FILL 0'- 0"3'- 0" 1'-0'3'- 0" 2'-O"c-0" 3'- O"4'-o" DRY 4'-0" 6i 3n Section View *Servlbe contracts available for maintenance* Pr¡mp:. Lou€rr TSS and lmprcves d[uentq¡aftybfieHr Gompleb ln¡tallaüm (wlrlng, panel,mannül¡ and sûart{p procodrJrss)e Gompletawarrrtty [-rrrr<--lI ,o_l L t---þ:l C¡aerAail II qJ t1 1 1 Digging Specs lnvert Dimensions Net Copocity Net Weight '13' Long x 8' wlde 56" below inlet lnlet Outlet Lenoth width Mtn. Heiqht lnlet M¡ddle Outl¿t Totol Lid Tonk Totol 56"54" or73'132"68"92"666 gol 332 9ol 503 gol 1501 gol 3600 lbs '11756 tbs 5556 lbs Phone: 719€9567G4 Fu:7194%'3j721 Webclb: www.wlleyprcætæm Ermll : fionüæk@wlleyprcætæmBuen¿ Vbter Golorado ñ PRtcAs[¡rnG. Pump Selection bra Pressurized Sysbm 1 g7 -291 .02 I Lú. 1, Sil livan Subdivis ion Parametels DisdageAss€Íüryee TrãËpcrtterqhB*e\åæ TrargtPiæCbs TrasptLireSze D¡sfihf¡ngVd\/d\lodd TrasptLergt'AûrVåæ TrãEptPþeClæs TraEpcrtPipeSÞe I\/kEle\dmLilt l\,laiEdL€rEfl l/ffidFlFClæs ttilaiHdPlpSze NurbdlâdsperCdl LâdLÊrEh t-eÞrdHpChs LädHFee OrifceSze OrilceSglrg Re*idHed Flo,fvîâ 'Actlûf Fridirlæses Galculations Mrirrrn Flo,t/RæF Orifce Nlffbdori¡cesFZrÊ TddFlcÀrRægZcrE NürterdL*rdsFZøÞ % Flo¡i,DiÍrerf d 1sr-dOriÍce TrãFFt\åæiV Báevdve TrãËFt\HæiVA¡b'Vd\æ Frictional Head Losses LGsfru€hDisdãW LæsinTraspcrlB#e\ärc Lr6süf€1{hVd/e LæsinTrasptdb\Hve IcesinMaiHd LæinLtrds Lcesfrq{lrFloMrÈ 'Adcrl Fridiîtæses Pipe Volumes - Single Family Residence Prcjec{ 1â infEs nftd Æ 150 incfEs 64æ 15 Ëd Æ 1.50 infEs 128 OE ß 150 indEs 3 ß Ëet Æ 150 irdÉs 916 ¡ntEs 4 Ëet 5 Ëel Nme irdæs 0 ËEt 200 300 250 150 100 50 PumpData (Fn lffn o/o þ fÊ 097 13 12:7 I 17 2ß zo oolr ¿oF d(!oE .9 Eıc o ı ot- 0 0 Ëd Êd Ëet Êet Êd Þd ËÉ Ëd 1.1 21 02 00 02 00 00 5 10 15 20 25 Net Dbcharye (gpm) 30 35 40 VddftasFttitæBáeVdtæ Vd dl-raæpatLirnAlÞ\ä\,e vddf\ibiHd Vddl*rdspZce TddvdB#e\äve.IUVdAúb\A,E 212 16 00 51 z2 67 gds 94, gds S* sds Sd, PFffiH(ÍHedEi'.ErtPurp 30GPM,1zHP 115,fo/ 1øqHzñ{gqHz Minimum Pumo DeigrFlo¡vR€te TdDyrsricH€d 127 (pn 82 Êel *G OFnco 6yrlens' lncorporated SygnCule PrrpCuve PurpOÉndRãge OperdrgPd¡t DesignRirt o Charyíng rha lVal th wtld Dus VøøøuP