Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLM F-10-L9 -5997 a nd SEPT-L0-19-5998 John Goss New Manufactured Home over Unfinished Basement TBD County Road 335 - New Castle, Colorado Sillivan Subdivision Exemption - Lot l- 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (c.D.o.H.) AND ALL FACTORY-BUtLT STRUCTURES INSTALLED lN GARFIELD COUNTY SHALL COMPLY WITH C.D.O.H. GUIDELINES FOR MANUFACTURE & INSTALLATION AT THE JOB SITE. 2I REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY,S BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 3) BUtLDtNc pERMtT ts tssuED FoR MANUFACTURED SINGLE-FAMILY RESIDENCE INSTALLED OVER UNFINISHED BASEMENT. THE UNFINISHED BASEMENT MUST BE INSULATED AND CONDITIONED IN COMPLIANCE WITH THE 2OO9 I.E.C.C. IF THE FLOOR FRAMING ABOVE BASEMENT CONSISTS OF ENGINEERED WOOD JOISTS, INSTALLATION OF A FIRE PROTECTION BARRIER AT UNDERSIDE oF FLOOR FRAMTNG tS REQUTRED (r.R.C., SECTTON R302.13). ALL BASEMENTS lN DWELLING UNITS ARE REQUIRED TO HAVE AT LEAST ONE OPERABLE WINDOW OR DOOR APPROVED FOR EMERGENCY ESCAPE OR RESCUE WHICH OPENS DIRECTLY TO THE OUTSIDE. 4l FUTURE tNTER|OR FtNtsH AT BASEMENT REQUIRES ADDITIONAL BUILDING PERMIT, AND ITEMS #25_29 LISTED ON PLAN ATTACHMENTS WILL APPLY. 5) ALL pLUMBtNG AND GAS ptptNc coNNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 6) ELECTRTCAL pERMtTTtNc AND TNSPECTIONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTI FICATE OF OCCU PANCY. 7) ON-S|TE WASTEWATER TREATMENT SYSTEM (O.W.T.S.)SHALL BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER,S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) GARFTELD COUNTy BUtLDtNG DEPT. TNSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION c. DECK/ROOF FRAMING & GUARDRAILS AT COVERED DECKS D. SEPTIC SYSTEM E. PLUMBING/GAS F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* * NOTE: GARFIELD COUNW REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.