Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-10-19-6001 Roaring Fork Water and Sanitation District -Waste Water Treatment Building 1) ALL WORK MUST COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODES (I.B.C.), 2009 INTERNATIONAL FIRE CODE (I.F.C.), 2009 IECC AND MANUFACTURER'S INSTALLATION SPECIFICATIONS. 2) STRUCTURE IS APPROVED AS TYPE 5-B CONSTRUCTION, F-1 OCCUPANCY. 3) MAXIMUM ALLOWABLE QUANTITY OF HAZARDOUS MATERIALS PER 2015 I.B.C., SECTION 414, Table 307.1(1) AND 2009 I.F.C. 4) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT INTERNATIONAL FIRE CODE (I.F.C.) REQUIREMENTS. FIRE DISTRICT APPROVAL IS REQUIRED PRIOR TO FINAL/COMPLETION INSPECTION. 5) ELECTRICAL PERMITTING & INSPECTIONS ARE BY COLORADO STATE ELECTRICAL BOARD. ROUGH -IN AND FINAL ELECTRICAL APPROVAL IS REQUIRED PRIOR TO FRAMING AND FINAL BUILDING INSPECTION.