Loading...
HomeMy WebLinkAboutAspen Glen HOA Approval CorrespondenceDave Argo Sent: To: Cc: From: Attachments: brad jordan < bradjordanarchitect@g mail.com > Thursday, October 24,2019 4:17 PM Dave Argo Chris Hilgert lExternall Hllgert AG approval letter.pdf Subiect: Dave, Attached is the Final Approval Letter from Aspen Glen pertaining to the proposed roof over the existing patio for the Hilgert Residence. You have the drawings in your queue, so this letter can be added to the file. Respectfully, Brad Jordan Jordan Architect 1 ô ASPEN[cln¡l Homeowners Association at Aspen Glenr Inc. October 24,2019 via email Mr. Chris Hilgert 734 Camelot Lane Houston, T){77024 Re: Summary of Preliminary/Final Review - 93 River Glen Dear Chris: The Design Review Committee (DRC), during their regular meeting on October l6rh,20lg conducted a preliminary and final review for the proposed roof extension at 93 River Glen. The DRC did not receive any negative comments from the notice to neighbors and found that the preliminary/final review is complete and approved. Although the plan is approved, the DRC did make an architectural suggestion to move the support posts in away from the end corners of the structure. If you do choose to make this change, please forward me the final drawings so the plan I have on file is accurate for final inspection. The DRC review fee for minor additions is $1,650. I understand you have mailed a check for this amount and I will send an email confirmation upon receipt. Please be aware that this fee covers 2.5 hours of review time, which includes preliminary/final review, a pre-construction meeting, final inspection, and attendant administrative time. If for some reason the review process exceeds 2.5 hours, an additional fee will be charged at arate of $600 per hour. As per our agreement, the $166/month Security Access Fee (SAF), $300 Construction Road Access Fee (CRAF), and the $5,000 Builder's Completion deposit will be due at time of County Building Permit receipt. Finally, the HOA has adopted a schedule of Violations & Fines. A copy of which is attached to this letter and will be provided to your contractor at the pre-construction meeting. Please familiarize yourself and your sub-contractors with this schedule to avoid unnecessary costs. Sign and return this document to my attention in advance of construction. 80 Bald Eagle llay Carbondole, CO 81623 Tel: (970)-963-3362 www.aspenglenhoa.com