HomeMy WebLinkAboutCorrespondenceDave Argo
From:
Sent:
To:
Cc:
Subiect:
Community Development Department
708 8th Street, Su¡te 407
Glenwood Springs, CO 81601
Tel: 970-945-8272 Ext. 7670
Emoil : d o rgo@ g a rfie ld-county.com
Web : go rfiel d-cou nty. com
Dave Argo
Sunday, November 10,2019 6:13 PM
Brad Jorda n (bradjordanarchitect@g mail.com)
Andy Schwa I ler (aschwal ler@ ga rfield -cou nty.com)
Hilgert Aspen Glen - Permit #BLRE-10-19-6016
Brad
We are currently reviewing plans for a roof addition to Hilgert's residence located at Aspen Glen Club Villas, Lot 1'
However, there is not enough detail provided in submitted drawings for us to approve these plans at this time.
More specifically, we require a Colorado licensed Professional Engineer to provide structural engineering for this
remodel/addition including the following details:
r Base plate connection between bottom of new 8 x 8 posts and existing steel beam below including
waterproofing at existing deck
¡ Connection between new heavy timber beams and 8 x 8 posts
o Connection between new heavy t¡mber beams and corner posts at exísting wall framing
r Verify timber ridge and/or blocking requirements between new timber roof trusses - large timber ridge beam is
shown on East Elevation but is not depicted ¡n timber truss details
o Verify truss connect¡ons at collar tie
please submit supplemental drawíngs clarifying this work and provide the Engineer's wet-seal/stamp on these amended
drawings so that we can finalize our review and issue a building permit.
Thank you for your assistance in this matter.
p.S. ln order to expedite plan review approvals you may want to consider having an Engineer to assist with the
preparation of structural plans and details on your future submittals to our department.
P.P.S. I will be out of the office for the next few weeks, so if
is also copied on this correspondence.
ave any questions please address these with Andy who
Dave Argo
Plans Examiner
Garfielcl Cuunty
Ft+q.ï h
fi**,tt, ?4¡r.
ttt Et"u
1