AC (alternative construction) INSPECTION REQUIRED NOTICE
The following is based on information provided to the Codes Section and may be modified based on the
actual findings of the field inspection.
DATE: March 12,2019
MANUFACTURER: BonnaVilla lD NO.: 3276
Mike Morrow / mike.morrow@chiefind.com
CONTACT: Bob Phillips /FAX NO
MODEL NO.: PlD3747 P/A NO.: 5'153574C
INSPECTION REQUI REMENTS
Check on-site installation/finishing of:
Check 36" depth of OSBO landing at recessed entry.
lnstallation of siding and weather-resistant barrier, fascia & soffit, soffit ventilation. The OSB
exterior siding should be factory-installed.
Check installation of OSBO large doors at pre-framed openings.
Ensure adequate support of sunk-in shower base in the Master Bedroom.
1
2
3)
4)
Site Address
The tocat building department by signing this form takes responsibility for inspecting the site built
construction stated above to approved plans and current codes.
Normal permits and fees for these inspections are to be per the local jurisdiction.
State approved plans for Factory Built Construction be oþtained from the Builder/Manufacturer
Building Official Printed
Building Official Si
Local jurisdiction may check
or DOH approved lnspector.
n to the Division of Housing,lnitials
A copy of this Notice must be included with the installation instructions and shipped with the unit.
Governor Jared Potis I Rick M. Garcia, Executive Director | Ätison George, Division Director
1313 Sherman St., Room 500, Denver, CO 80203 P 303.864.7813 F 303.864.7856 TDD/TTY 303.864.7758 www.dola.colorado.gov
Stre ngthe ni ng Colorado Communi ti esraua! ffdst{Go??ô¡TuNttY