Loading...
HomeMy WebLinkAboutDOLA Inspection ReportCOLORADO Ðepartment of Local Affairs Division of Housing AC (alternative construction) INSPECTION REQUIRED NOTICE The following is based on information provided to the Codes Section and may be modified based on the actual findings of the field inspection. DATE: March 12,2019 MANUFACTURER: BonnaVilla lD NO.: 3276 Mike Morrow / mike.morrow@chiefind.com CONTACT: Bob Phillips /FAX NO MODEL NO.: PlD3747 P/A NO.: 5'153574C INSPECTION REQUI REMENTS Check on-site installation/finishing of: Check 36" depth of OSBO landing at recessed entry. lnstallation of siding and weather-resistant barrier, fascia & soffit, soffit ventilation. The OSB exterior siding should be factory-installed. Check installation of OSBO large doors at pre-framed openings. Ensure adequate support of sunk-in shower base in the Master Bedroom. 1 2 3) 4) Site Address The tocat building department by signing this form takes responsibility for inspecting the site built construction stated above to approved plans and current codes. Normal permits and fees for these inspections are to be per the local jurisdiction. State approved plans for Factory Built Construction be oþtained from the Builder/Manufacturer Building Official Printed Building Official Si Local jurisdiction may check or DOH approved lnspector. n to the Division of Housing,lnitials A copy of this Notice must be included with the installation instructions and shipped with the unit. Governor Jared Potis I Rick M. Garcia, Executive Director | Ätison George, Division Director 1313 Sherman St., Room 500, Denver, CO 80203 P 303.864.7813 F 303.864.7856 TDD/TTY 303.864.7758 www.dola.colorado.gov Stre ngthe ni ng Colorado Communi ti esraua! ffdst{Go??ô¡TuNttY