Loading...
HomeMy WebLinkAboutLetter from DRB 11.11.2019Four Mile Ranh HOA - Design Review Committee PO Box 1207 Glenwood Springs, CO 81602 Date: Monday, November 11th, 2019 To: Mogli and David Cooper, Brad Jordan (via email) Cc: DRC Board Members and 4 Mile Ranch Executive Board Re: Lot 57, Four Mile Ranch Glenwood Springs, CO Subject: Final Plan Review for Lot 57 — Cooper Residence RECEIVED NOV 3 2019 ,.4RFIELD COUNTY as niry nEVELOPMENT After receiving your final plan set on October 29th, 2019, the DRC has the following minor comments on the plans to be addressed prior to the start of construction: 1. The DRC accepts your Waiver Request for a modification to the Building Envelope dated October 29th, 2019. 2. The colors selected appear to be very close in color to the home on adjacent Lot 58. The colors of the home are not approved at this time but will be reviewed for approval by the FMR DRC in the future when an updated material board is submitted. 3. Grading is represented on two different sheets (Conceptual Grading and Construction Management) differently. The DRC accepts/approves the stamped Construction Management plan grading. 4. "Note 4" on the Landscaping Plan will not be allowed. Berms are not permitted in accordance with DRC Guideline 3.3. Excess material shall be removed from the lot and not used to create landforms. 5. Provide the required DRC review fees and construction deposits to Greg Kontour. Feel free to contact Greg Kontour or myself to discuss any of the information provided. Sincerely, 47, Four Mile Ranch DRC Secretary Nicholas A. Senn