Curtis Odom <curtis@esperanzainc.net>
Tuesday, August L3,201-9 8:21 AM
Andy Schwaller; Dave Argo; exline9000@gmail.com; Colette Smith; 'Eric Kraai'
Matt Provost; Jim Wilson
[External] Re: 62 Sweet Grass Inspection Report
Thank you Andy! And a big THANK YOU to your associates in Garfield County (Dave, Matt, Jim) and to Colette and Eric for their
patient assistance in getting this project moving forward.
Best Regards,
Curtis Odom, Architect, NCARB, President
I
t$ptßütiI
.t: 4.1. t.. ... iji. t:.
Aspen Board of Realtors, Affiliate Member
Mobile # 970 708-0599
http://espera nzaexperts.com
From: Andy Schwaller <aschwa ller@ga rfield-countv.com>
Date: Tuesday, August 13, zOLg at 8:16 AM
To: Curtis Odom <curtis@esperanzainc.net>, Dave Argo <dargo@garfield-countv.com>, Brandon Exline
<exline9000@gmail.com>, Colette Smith <csmith@rmg-engineers.com>, Eric Kraai<eric@kraaidesign.com>
Cc: Matt Provost <mprovost@garfield-countv.com>, Jim Wilson <iwilson@garfield-countv.com>
Subject: RE: 62 Sweet Grass lnspection Report
Curtis,
Following the framing inspection on Monday August 12,201-9, we have removed the red tag for the project. Work and
future inspections will be following the typical process toward getting the final inspection and hopefully certificate of
occupancy for the structure.
Thanks everyone for the attention to detail required to reach this point
Regards,
Andy Schwaller
Building Official
Garfield County
From: Curtis Odom [ma ilto:curtis@espera nzainc.net]
Sent: Friday, August 09,2OL9 9:29 AM
To: Dave Argo <dargo@garfield-countv.com>; exline9000@gmail.com; Colette Smith <CSmith@rmg-engineers.com>;
'Eric Kraai' <eric@kraaidesign.com>
1
Cc: Andy Schwaller <aschwaller@garfield-countv.com>; Matt Provost <mprovost@garfield-countv.com>; Jim Wilson
<iwilson @sarfield-countv.com>
Subject: IExternal] Re: 62 Sweet Grass lnspection Report
Good Morning Dave:
Thanks for the feedback regarding the inspection on Wednesday. As you probably know, we have set up a site meeting with
Colette and Matt for Monday (Aug 12, 2019) at 11:00. I am hopeful that we can get any and all issues brought forward and
rectified so that we can move forward with this job.
Best Regards,
Curtis Odom, Architect, NCARB, President
I
t$ptnIl|tÍ
1..,'1:.t:t .t:. it,. .). . 1': /
Aspen Board of Realtors, Affiliate Member
Mobile # 970 708-0599
http://espera nzaexperts. com
From: Dave Argo <da rgo @ga rfield-countv.com>
Date: Thursday, August 8,zOLg at 2:23 PM
To: Curtis Odom <curtis@esperanzainc.net>, Brandon Exline <exline9000@email.com>, Colette Smith <csmith@rmg-
engineers.com>, Eric Kraai <eric@kraaidesign.com>
Cc: Andy Schwaller <aschwaller@garfield-countv.com>, Matt Provost <mprovost@garfield-countv.com>, Jim Wilson
<iwilson@garf¡eld-countv.com>
Subject: 62 Sweet Grass lnspection Report
Curtis
ln the interest of facilitating good communications between our office and Exline's team, I wanted to provide you with a
summary of our field inspection visit conducted yesterday afternoon at 62 Sweet Grass in Aspen Glen.
Please refer to the attached Field Inspection Report.
Dave Argo
Plan's Examiner
GurJield County
Community Development Department
708 9th Street, Su¡te 407
Glenwood Springs, CO 87601
Tel: 970-945-8272 Ext. L610
E mo i I : d o rg o @ g a rfie I d-cou nty. co m
W e b :g o rf i e I d -co u n ty. com
2
Andy Schwaller
From:
Sent:
To:
Cc:
Subject:
Andy Schwaller
Friday, July 05, 2019 L2:07 PM
'cu rtis@esperanzainc.net'
Jim Wilson; Dave Argo
Correction Notice July 3, 20L9 Sweetgrass Project
Curtis,
This email is in follow up to various mechanical and plumbing inspections from our inspection last Wednesday. Please
note, further inspections are required to verify the corrections made, and we reserve the option of always finding new
¡tems anytime we do any inspections. I believe you also took notes, but please call if you have any questions. Here is
what we found on WednesdaY:
L. Finish deck drains through patio ceiling'
2. Vent master bath.
3. Add water main shut offs as per code.
4. Complete various roof jacks.
5. Either add additional vent to bathroom or remove bathroom vent penetration through roof
6. Add fire place shutoffs to code.
7. Run gas to furnace and retest pressure test'
8. Makeup air is required for range hood if over 400 cfm.
9. Provide conditioned air for crawl space
10. Repair floor joist cut out for trunk line in crawl space below mechanical platform in garage.
11. Add attic/roof ventilation as per code. Cut out overlayment from ridge.
L2. Provide attic access and service platform for mechanical in attic.
13. Provide certification the mold issue was corrected in crawl space.
1-4. Call for shower pan inspections once completed.
15. Verify emergency egress from basement meets code'
16. Complete the fire rated assembly as per architect.
17. Other items as discussed and located during construct¡on.
Thanks,
Andy Schwaller
Building Official
Garfield County
1
Dave Argo
From:
Sent:
lo:
H. Carter Barger <srchconslt@gmail.com>
Saturday, April 20, 2019 4:10 PM
Dave Argo
Thank you!Subject:
Dave:
It was a pleasure meeting you last Thursday, and thank you for allowing for my unplanned visit. I found
our meeting to be very enlightening about your history with the Exline project, and I am hoping that we can
soon get this construction on track for completion within a 6 month window. I have given your card to Atty.
Haley Carmer and suggested that she affange a meeting with you soon. Please let me know if such a meeting
occurs.
Again, many thanks for your time and information.
Best regards,
Carter tsarger
H. Carter Barger
Board Director & Executive Search Consulting
(Since 1973)
67 Golden Bear Drive
Carbondale, CO 81623
Office: (9'70) 340-4129
Mobile: (603) 493-5548
E-Mail: srchconslt@gmail.com
1