Loading...
HomeMy WebLinkAboutEngineer's Letter - Foundation Stepped Footing 05.15.2019TAMARACK' T3 GROVE EMOINE May 15, 2019 Garfield County Community Development Department Attn: Dave Argo 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970)-945-8212 Ext. 1610 Re: Heyl Residence, Foundation Stepped Footing Review & Approval — TGE19-11949 Mr. Argo, The purpose of our letter is to address the perimeter foundation stepped footing construction for the above-mentioned project. After reviewing the photos provided by Dave Heyl (Heyl Construction, Inc.) on May 15th 2019, Tamarack Grove Engineering has analyzed to the best of our knowledge, and with verbal verification provided by Dave Heyl that the perimeter foundation stepped footing locations, rebar placement, and spacing has been adequately constructed per the design noted on the approved construction documents stamped on April 29th, 2019. All perimeter foundation stepped footing locations have been reviewed through provided photos and back checked with the most current construction drawings set stamped on April 29th, 2019. The list of items noted below are changes made in the field. Current construction drawing set stamped on April 29th, 2019 shows one stepped footing location for garage perimeter footings. For the garage perimeter foundation stepped footing locations, multiple stepped footing segments are permitted due to the subgrade slope. If there are any other questions related to this project, please feel free to contact our office. Kind Regards, rpt Tyler C. Maier Tamarack Grove Engineering 812 La Cassia Dr. Boise, ID. 83705 Ph. (208) 629-0879 Email: Tyier.Maier@tamarackgrove.com 05/15/19 SpeatiVill u Sbu VIAL 6Utu 812 L. Cassis Or. • Boise. ldsho 83705 • Phonic 208.348.8841 • Fax; 208.345.8848