HomeMy WebLinkAboutAs-built Report 12.20.2019Scpr-- lD-1 -(1b
KENNETH J ROTSKY, PE
558 RIO OSO LANE
GRAND JUNCTION, CO 81507,
CONSULTING ENGINEER
970 216 8861
December 20, 2019
GARFIELD COUNTY COMMUNITY DEVELOPMENT
108 - 8 TH STREET, SUITE 401
GLENWOOD SPRINGS, CO 81601
Re: Certification Letter & "AsBuilt"
On -Site Wastewater Treatment System
TBD, (Tract 24) CR 237 (ROSE)
Silt, CO
To Whom It May Concern:
This is to Advise that inspections were made during construction of the above referenced
OWTS and that the system has been constructed essentially in accordance with the
approved Plans and Specifications, except that the Owner decided to move the house
farther to the west making it necessary to locate the tank and absorption bed to the south
as shown.
Measurements from the house to the septic tank and manifold tee, are shown on the
attached "Construction Plan of Record". Additionally. risers on the septic tank and the
south end of the absorption bed further mark their location .
A02 7-/-/
..,.
`.r..
•
•
CLEANOU'C
;.
INSTALLED BY : J. CALIBER CONSTRUCTION
1250
1000 GALLON .►
SEPTIC TANK
PLASTIC
2 RISERS ABOVE
GRADE
CONSTRUCTION PLAN
OF RECORD
ON-SITE WASTEWATER TREATMENT
SYSTEM (OWTS)
TBD - CR 237
TRACT 24
SILT, COLORADO
G ARFIFi,n ( )ITNTV