Loading...
HomeMy WebLinkAboutAs-built Report 12.20.2019Scpr-- lD-1 -(1b KENNETH J ROTSKY, PE 558 RIO OSO LANE GRAND JUNCTION, CO 81507, CONSULTING ENGINEER 970 216 8861 December 20, 2019 GARFIELD COUNTY COMMUNITY DEVELOPMENT 108 - 8 TH STREET, SUITE 401 GLENWOOD SPRINGS, CO 81601 Re: Certification Letter & "AsBuilt" On -Site Wastewater Treatment System TBD, (Tract 24) CR 237 (ROSE) Silt, CO To Whom It May Concern: This is to Advise that inspections were made during construction of the above referenced OWTS and that the system has been constructed essentially in accordance with the approved Plans and Specifications, except that the Owner decided to move the house farther to the west making it necessary to locate the tank and absorption bed to the south as shown. Measurements from the house to the septic tank and manifold tee, are shown on the attached "Construction Plan of Record". Additionally. risers on the septic tank and the south end of the absorption bed further mark their location . A02 7-/-/ ..,. `.r.. • • CLEANOU'C ;. INSTALLED BY : J. CALIBER CONSTRUCTION 1250 1000 GALLON .► SEPTIC TANK PLASTIC 2 RISERS ABOVE GRADE CONSTRUCTION PLAN OF RECORD ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) TBD - CR 237 TRACT 24 SILT, COLORADO G ARFIFi,n ( )ITNTV