Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-12-19-6082 Jonah Frank Detached Garage — Manufactured Steel Building 6023 County Road 214, New Castle 1) ALL WORK SHALL COMPLY WITH 2015 I.B.C., I.R.C., & 2009 I.E.C.C., AND MANUFACTURER'S INSTALLATION REQUIREMENTS. THIS STRUCTURE IS ALSO SUBJECT TO GARFIELD COUNTY'S "RURAL" ZONE DISTRICT REQUIREMENTS. 2) IMPROVEMENTS SHALL COMPLY WITH ALL APPLICABLE ITEMS CONTAINED IN ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON THE PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) BUILDING IS APPROVED AS A DETACHED RESIDENTIAL ACCESSORY STRUCTURE. 4) A LOT IMPROVEMENT CERTIFICATE SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR 15 REQUIRED AT FOUNDATION INSPECTION TO VERIFY THAT STRUCTURE IS IN COMPLIANCE WITH BUILDING SETBACK REQUIREMENTS. 5) AN OPEN -HOLE SOILS REPORT PREPARED BY A COLORADO LICENSED PROFESSIONAL ENGINEER IS REQUIRED AT FOOTING INSPECTION TO VERIFY 3,000 P.S.F. MINIMUM SOILS BEARING CAPACITY AS PER STRUCTURAL ENGINEER'S REQUIREMENTS. PROVIDE COPY OF REPORT FOR BUILDING INSPECTOR REVIEW AT FOUNDATION INSPECTION. 6) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR PER THE SPECIAL INSPECTIONS PROVISIONS OF I.B.C., CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 7) A MINIMUM OF (1) WALK-THROUGH SIDE -HINGED DOOR (MIN. SIZE: 36" WIDE X 80" HT.) IS REQUIRED FOR EGRESS. 8) REFER TO ATTACHED ITEMS #59, 62, 63, 64, 65 & 71 FOR HEATING/MECHANICAL SYSTEMS REQUIREMENTS. MECHANICAL VENTILATION AT BATHROOM AS PER ITEM #57. 9) BUILDING SHALL COMPLY WITH 2009 I.E.C.C. FOR EXTERIOR INSULATION AND THERMAL ENVELOPE REQUIREMENTS, INCLUDING INSTALLATION OF RIGID INSULATION AT CONCRETE SLAB EDGE ALONG FOUNDATION PERIMETER AS PER I.E.C.C., SECTION 402.2.8. 10) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL 15 REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.