Loading...
HomeMy WebLinkAboutSnow Load Verification 01.09.2019,N110 STEEL STEEL BUILDING SYSTEMS Jonah Frank 6023 CR 214 New Castle, CO 81647 Attn.: Jonah Frank Project Location: New Castle, CO 81647 Pm' U 1908310A Project Name` 20196459 Jonah Frank Buildings: A->30'-0"x50'-0"xl6'-0"(RCG,3.0:12) Version 2019.02.19 (2/25/19) January 9, 2019 This Letter of Design Certification ensures that the materials furnished by the metal building supplier will be designed in accordance with the information specified to the metal building supplier on the order documents and summarized by the loading information listed below. The Project Engineer of Record (not the metal building supplier) is responsible for verifying that the building code and design loads meet any and all applicable local requirements. The Professional Engineer whose seal appears on this Letter of Certification is employed by the metal building manufacturer and does not serve as or represent the Engineer of Record for this project and shall not be construed as such. DESIGN LOAD CRITERIA: Structural Loads Applied in General Accordance with: Risk Category: PROJECT -WIDE LOADING INFORMATION: Ground Snow Load: 57.2 psf Roof Live toad: 20.0 psf IBC 2015 II - Standard Buildings Snow Exposure Factor,Ce: 1.00 Snow Imp. Factor, Is: 1.00 Not Reducible Per Code. Ultimate Design Wind Velocity: 115 mph Nominal Design Wind Velocity: 89 mph ***Components & Cladding Pressures: 24 psf/ -32 psf Is Roof to meet UL 90 Requirements?: No Seismic Criteria: Design Sds / Shc: Seis. Imp. Factor, Ie: Seis. Design Category: Ss: 0.316 Sl: 0.081 0.326/0.130 1.00 B Wind Exposure: B • No ground snow included in seismic calculations. Analysis Procedure: Equiv. Lat. Force Procedure Basic SFRS: Ord. Steel Mom. Frames & Ord. Steel Cantilever Columns Site Class: D • Bld .........M4. A Roof Dead 4.0 Collateral Dead Snow Coefficient Snow Load t psf i Wind Seismic Pri (psf Sec (psf) Ct Cs Ps (psf) #*Pm (psf) Enclosure GCpi R Cs V (kips) 1.0 1.0 1.0 1.00 40.00 40.00 Enclosed ± 0.18 1.25 0.261 4.65 • *Primary Structural Not Included **P„, is based on the minimum roof snow load calculated per building code or the contract -specified roo/snow load, whichever is greater. This value, P,,, , is only applied in combination with Dead and Collateral Loads. Roof Snow in other loading conditions is determined per the specified Building Code. ***Design wind pressures to he used for wall exterior component and cladding materials not provided by Metal Building Supplier. Mezzanine Infotmalion: Floor Dead Load: N/A Floor Collateral Load: N/A Floor Live Load: N/A Crane nforrnation: No cranes on building. Roof --Top Unit Information No roof -top units on building. t * Oma: 6 r° a PE -43511 lc t The design of structural members supporting roof gravity loads is controlled by the more critical effect of roof live load or roof snow applied in accordance with the governing building code. DESIGN STANDARDS REFERENCED: • AISC Specification for Structural Steel Buildings - Steel Construction Manual, 14th Edition, ® 2010. • AISI North -American Specification for the Design of Cold -Formed Steel Structures, ® 2012 Edition. • IBC codes are designed in accordance with ASCE7-10 Edition. • MBMA Low Rise Building Systems Manual, Latest Edition. • AWS Latest Edition of Structural Welding Code. • No buyout structural components provided on this project. Professional Seal leF Dave Argo From: Jonah Frank <jonah@sopris.net> Sent: Thursday, January 9, 2020 9:03 AM To: Dave Argo Subject: [External] Fwd: U19O8310 - Jonah Frank Attachments: U19O8310A LOC REV1 SEALED.pdf Dave, Attached is the new Snow load document. I also dropped off the Foundation plans on Tuesday. I will try calling today to make sure that you have everything you need to keep moving forward. Thanks Jonah 970-456-9393 Begin forwarded message: From: Les Robertson <Irobertson@rhinobldg.com> Subject: FW: U19O8310 - Jonah Frank Date: January 9, 2020 at 8:31:54 AM MST To: "'lonah@sopris.net"' <jonah@sopris.net> Les Robertson Senior Sales Representative Rhino Steel Building Systems 4305 1-35 North Denton, TX 76207 Toll Free: 1-888-320-7466 Phone: 940-383-9566 Fax: 940-484-6746 Email: Irobertson@rhinobidq.com Website www.rhinobldg.com