HomeMy WebLinkAboutFire District CorrespondenceDave Argo
From: Bill Gavette <gavette@carbondalefire.org>
Sent: Saturday, February 22, 2020 4:18 PM
To: Dave Argo
Cc: Max Filiss; Erik VanTassel; Andy Schwaller
Subject: RE: [External] Aspen Equestrian Remodel + Addition Follow -Up
Dave,
The notes are accurate. The installation of fire sprinklers per NFPA 13D in both levels of the remodeled section will be
appropriated based upon the scope of the project.
Thanks,
Bill Gavette
Deputy Chief
Carbondale & Rural Fire Protection District
www.carbondalefire.org
970-963-2491
-U1=-3
FIREFIRE , EMS. RESCUE
From: Dave Argo [mailto:dargo@garfield-county.com]
Sent: Friday, February 21, 2020 1:57 PM
To: Bill Gavette
Cc: Max Filiss; Erik VanTassel; Andy Schwaller
Subject: Aspen Equestrian Remodel + Addition Follow -Up
Bill:
Just wanted to follow-up after our meeting over at Aspen Equestrian Estates Arena/Barn on Wednesday.
I've attached a "File Note" summary of our discussion about fire sprinkler system and occupancy separations. Please
review for accuracy and let me know if there's anything else we need to document. My goal is to issue the building
permit by Monday, so please let me know if there's anything else I've missed.
Thanks & have a great weekend —
Dave Argo
Plans Examiner
:-. Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
1
Dave Argo
From: Dave Argo
Sent: Friday, February 21, 2020 1:57 PM
To: Bill Gavette (gavette@carbondalefire.org)
Cc: Max Filiss; Erik VanTassel; Andy Schwaller (aschwaller@garfield-county.com)
Subject: Aspen Equestrian Remodel + Addition Follow -Up
Attachments: Site Visit File Note 2020-02-19.pdf
Bill:
Just wanted to follow-up after our meeting over at Aspen Equestrian Estates Arena/Barn on Wednesday.
I've attached a "File Note" summary of our discussion about fire sprinkler system and occupancy separations. Please
review for accuracy and let me know if there's anything else we need to document. My goal is to issue the building
permit by Monday, so please let me know if there's anything else I've missed.
Thanks & have a great weekend —
Dave Argo
Plans Examiner
ie. Garfield County I
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
1
Garfield County
BUILDING DEPARTMENT
108 Eighth Street, Suite 401, Glenwood Springs, CO 81601
Tel: (970) 945-8212
FILE NOTE
PROJECT: Remodel + Addition of Aspen Equestrian Estates Arena/Barn
PERMIT NUMBER: BLCO-01-20-6094
DATE: Feb. 19, 2020
SUBJECT: Fire Sprinklers & Occupancy Separations
NOTE BY: Dave Argo — Plans Examiner
RE: Meeting at project site & existing facilities with Bill Gavette & Pablo (Carbondale Fire District), Max
Filiss & Erik Van Tassel (Divide Creek Builders) and Dave Argo (Garfield County Bldg. Dept.)
At this meeting to review existing conditions and proposed design changes at the existing building, it
was agreed that the new 2 -story remodel + addition will be fully sprinklered (at both levels) and 1 -hour
occupancy separation will be provided between Occupancy Groups U, B and R-3. This approach should
provide safe means of egress for residents of the new upstairs sleeping quarters who will need to
descend the grand stairway open to the office entry foyer at the main level prior to exiting the building.
More specifically, fire -rated vertical separations shall comply with requirements of "Fire Partitions"
(I.B.C., Section 708) and fire -rated horizontal floor/ceiling assemblies shall comply with "Horizontal
Assemblies" (I.B.C., Section 711).
The builder is responsible for coordinating automatic fire sprinkler system design criteria, installation
requirements and inspections with the local Fire District. Approval/sign-off from the Fire District will be
required at frame inspection and prior to final building inspection & Certificate of Occupancy.
Dave Argo
From: Dave Argo
Sent: Friday, February 21, 2020 2:33 PM
To: Max Filiss; Bill Gavette (gavette@carbondalefire.org)
Cc: Andy Schwaller; Erik VanTassel; Mark Ward
Subject: RE: Aspen Equestrian Remodel + Addition Follow -Up
Max:
As we discussed with Bill on Wednesday, the existing windows between Group B offices and Group U arena/barn areas
can remain. However, there is a requirement for a one-hour occupancy separation between B and R-3 sleeping units
above, and this one-hour fire rating not only applies to the floor/ceiling assembly itself but also to any structural support
for upper level floor framing.
For example, if a bearing wall supports upper level floor framing that bearing wall will be required to meet one-hour fire
rating. Similarly, there are (2) steel beams that support the north & west perimeter of the upper level R-3 occupancies
and these beams and any posts supporting them will also need to comply with a one-hour fire rating as well.
Dave Argo
Plans Examiner
_ Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
From: Max Filiss <max@dividecreekbuilders.com>
Sent: Friday, February 21, 2020 2:04 PM
To: Dave Argo <dargo@garfield-county.com>
Cc: Andy Schwaller <aschwaller@garfield-county.com>; Bill Gavette (gavette@carbondalefire.org)
<gavette@carbondalefire.org>; Erik VanTassel <evt23@hotmail.com>; Max Filiss <max@dividecreekbuilders.com>
Subject: Re: [External] Aspen Equestrian Remodel + Addition Follow -Up
Just to confirm on my end, we would not have to upgrade vertical assemblies between Occupancy group B and group U.
More specifically, I am concerned about the windows looking out to the arenas.
Can you confirm for me.
Thanks
Max
Dave Argo
From: Dave Argo
Sent: Tuesday, February 18, 2020 11:53 AM
To: Bill Gavette (gavette@carbondalefire.org)
Cc: Andy Schwaller (aschwaller@garfield-county.com)
Subject: Aspen Equestrian Barn Remodel + Addition Follow -Up
Bill:
The question I forgot to ask you in my previous email is whether or not the 2 -story portion of the Equestrian Arena/Barn
should be considered to be a separate "Fire Area" from the remainder of the building?
If that is indeed the case, in addition to fire sprinklers throughout the 2 -story remodel/addition scope of work, this new
work area will also need to be provided with "Fire Barriers" separating it from the remainder of the building with a 2 -
hour fire resistance rating (per IBC, Table 707.3.10). To complicate things a little bit, there are apparently existing
windows looking into the arena from the main level offices and there is also an overlook area that looks into both the
Targe and small arenas. These "complications" are the reason I feel the need to go out to look at the existing facility.
If this was a new building, given the overall size we'd probably be looking at "separated occupancies" which would
include separate smaller sized fire areas to achieve overall building area/size compliance with the Building Code.
However, since we are dealing with what Dave Bartholomew identified in 2014 as a "pre-existing, non -conforming
structure" it's a little different situation and we do have more latitude by way of the Existing Building Code (IEBC).
Anyway, I wanted to reach back out to see what your thoughts about this may be.
Thanks,
Dave Argo
Plans Examiner
'y.. Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
Dave Argo
From: Dave Argo
Sent: Tuesday, February 18, 2020 10:52 AM
To: Bill Gavette (gavette@carbondalefire.org)
Cc: Andy Schwaller (aschwaller@garfield-county.com)
Subject: Aspen Equestrian Barn Remodel + Addition
Attachments: Aspen Equestrian Estates Barn Remodel.pdf
Bill:
I am currently reviewing plans for the remodel/addition proposed at Aspen Equestrian Estates Arena & Horse Barn
which includes a gut remodel of the main level offices (occupancy group "B") and second story addition of (2) residential
sleeping units (occupancy group "R-3").
As you know, the original arena/barn and subsequent additions over the past several years include a total building area
of approximately 54,000 S.F. and it appears that this unusually large size was allowed as per IBC, Appendix C under the
"Group U —Agricultural Buildings" exemption for unlimited size, single -story buildings surrounded or adjoined by 60 -foot
minimum width yards or public ways.
Given that this new permit seeks to effectively change use of the building from Group U to "mixed use occupancies"
(Groups B, R-3 and U) and to exceed the single -story requirement of the exemption noted above, we agree with your
assessment that the new upstairs residential sleeping quarters must be sprinklered as per IBC, Section 903.2.8 (NFPA
13D).
However, given that the only means of egress from the new upstairs residential sleeping quarters is to use the stairway
that is open into the remodeled lobby/foyer of the main level offices (Group B) below, we also believe that the main
level offices should also be fire sprinklered to maintain integrity of the exit accessway out of the building. Would you
agree with this assessment?
Since I am unfamiliar with this project, I have scheduled a meeting with Max Filiss out at the building on Wednesday
afternoon at 2:30 pm to review existing conditions. Don't know if you're available or not, but you are welcome to join
us. Alternately, if you are on duty tomorrow, I can easily stop by your station to visit with you about this project after I
have visited the site.
Also, don't know if you've seen plans for the proposed remodel/addition or not, but I've attached a PDF that identifies
location within the building and identifies the key issues related to fire sprinkler system and egress from new units at
upper level.
Let me know your thoughts
Dave Argo
Plans Examiner
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
1
1
38'
6 - g
-
0
w ti
[BuiIding Permit Number: BLCO-01-20-6094
Remodel Offices + Upstairs Dwelling Unit Addition
ASPEN EQUESTRIAN ESTATES ARENA/BARN
3275 County Road 100, Carbondale
;Or
L."
j. Ato --LJE . i..__ F.L. 0 d p- fLJ 4
.
- 4F P
04/ VW.4 f 19 Of tey119 9 f
R- uq s9 wigs Is �-
wi St n• o
4bt1f7W � 469
1
(act en c f iy )
3636 Foey�I�aII
�i4u-_ t •ati -
ca'ur a T 'rd $ gpRi Nk,trja
NtiW (AritAws Addi FI
RO;A{;al Ef 0143
pe -ti potvey @ip 1'1,-50
ezer r-usti-111116g sill 1/
-.°..
i=
kelt-.67 .ita,tier*
rr
o
� x
Gast lqi-A#E416'
Kia -eh 42-.90F 117 vioN9
RZeifila l 'ti1/1045
pk-r4c nc,1 1444/1.1,2 R-3`
1J I✓vu boa P / 2 N P p1,d9R
C�?b�EF�.NI
p -o - vs
r ii y —a—P7F Gap,
Zr12' S Id'. . 4.J $.W
razdr
•
try-Y;� 5(2>1.. 14-(F �'.
_ o i1Gi
karrO# cc IgistAc.1
daupm1 f gvoup l
::-
•
ice''#+�;U LL.21 s -e •C T I
mak
Dave Argo
From: Bill Gavette <gavette@carbondalefire.org>
Sent: Wednesday, January 29, 2020 9:58 AM
To: Max Filiss
Cc: Spencer Boothe; Dave Argo
Subject: RE: [External] Barn at old polo club
Max,
Based upon Garfield County's amendment to IBC Section 903.2.8, a NFPA 13D sprinkler system would be appropriate for
the residential unit which is 1,000 square feet or Tess.
Thanks,
Bill Gavette
Deputy Chief
Carbondale & Rural Fire Protection District
www.carbondalefire.org
970-963-2491
FIRE • EMS• RESCUE
From: Max Filiss [mailto:max@dividecreekbuilders.com]
Sent: Friday, January 24, 2020 3:32 PM
To: Bill Gavette
Subject: Barn at old polo club
Bill
We are in for permit for the old polo club barn for updating the existing office space and turning the upstairs
into two small bedrooms. Dave Argo from Garfield County asked that I reach out to you for review.
The architect and I reviewed code and garfield county precedent and are pretty confident that this situation does
subject us to needed NFPA-13D in the upstairs sleeping areas.
The access will stay the same and I think you had been pretty happy with the way it lays out, you can still have
full access all the way around the full barn.
Please let me know if you want to discuss...or meet onsite to review.
Thanks and have a good weekend.
Max
Max Filiss
1
Dave Argo
From: Dave Argo
Sent: Friday, February 14, 2020 4:04 PM
To: Max Filiss
Subject: Equestrian Estates Barn Remodel/Addition
Max:
I am currently reviewing plans for the remodel/addition to the existing Equestrian Arena/Barn at Aspen Equestrian
Estates. Since I am unfamiliar with this building and the proposed alterations are integral to the existing structures, I
think it makes sense for me to conduct a site visit early next week to take a firsthand look at the existing structure to
better understand how these alterations will interface with the rest of the building(s).
Would you be available to meet me at the project site next week? Our office is closed on Monday for Presidents' Day
holiday, but I can meet you out at the equestrian center on Tuesday or Wed. whenever it works best for your schedule.
If you can let me know what day/time would be convenient, I'll look forward to seeing you next week.
Thanks,
Dave Argo
Plans Examiner
CGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
1