Loading...
HomeMy WebLinkAboutObservation of Excavation 05.21.2019CAPSTOlVE ENTERPRTSE.S WEST,LLC Date: Job Number: ó18 PARTEE DRIVE GRAND JUNCTION, CO 81504 PHONE (970) 2s0-5551 martln@cô pstonewest.com s/2712079 4354 Attention:J Caliber Construction jcaliberconstruction.com Rifle CO,81650 Subject:Construction lnspection Parcel 2779O53O2O24 At yourrequest,CapstoneEnterprisesWest,LLC(Capstone) inspectedtheconstruct¡onof thefoundationpadat parcel 217905302024(theRobinsonResidence). Thepurposeoftheseinspectionswastoverifythatthesoilswere as anticipated from the prev¡ous geotechnical reports and to insure that the subgrade and backfill were moisture cond¡tioned and compacted as recommended The site was inspected as follows: Report-1 5lL6/2O79 AM Foundation excavated to subgrade and compacted The soils were as anticipated from the previous geotechnical investigations After re-work, pad showed good moisture and density Pad approved for backfill Report-2 5l2c.l2ct9 AM Pad brought to final grade After re-work, pad showed good moisture and density Pad approved for concrete forms The preparation of the foundation pad at Parcel 2L79O53O2024 meets the requirements for the construction of a residence designed for a maximum bearing capacity of 1500 psf. Capstone approves of the compaction at the time of the testing. Respectf ully Submitted Mart¡n W. Chenoweth P.E. Capstone Enterprises West, LLC s7784 CAPSTONEENÏERPRTSESWEST, rtcCtIENT J cal¡ber constructionPROJECT Pârcel21790s3o20z4JOB-NOCONTRACÏORTESTED BYJ CaliberM ChenowethSOURCE DESCRIPTIONR¡fle Nat¡ve SiltMAX DD112.5OPT MC14.2%GEOTECHNICAL AND MINING ENGINEERINGTESTING AND INSPECTION SERVICES6IS FÀRTËE DRIVEGRAND JL|NCTToN, CO 8r5O/*PHONE (970) 250-535r4354ACTIONS TO BE TAKENTEST RESULTSslL6l20r9DATE;ERVICES PROVIDEDOBSERVATIONSSTATE OF PROJECTAMAM/PMPad approved for backfillAfter re-work, pad showed good moisture and density98765432LTESTMloisture and Densiw TestingExcevated materiels as anticipeted from previous geotechnical investigat¡onscoundetion excavated to subgrade and compactedREPORT NO. 4354-01SGSGSGSGSGSGSGSGSGLIFTNorth Footer Line RETESTNorth Footer Line RETESTSouth Footer LineNorth Footer Line RETESTEast Footer LineSouth Footer LineSouth Footer LineWest Footer LineNorth Footer L¡neLOCATIONsiltsilrsiltsiltsilts¡ltsiltsiltsiltPROCTOR712.5112.5LL2.5772.5r12.5172.5112.5r72.5Itz.5Mâx DDt4.2%14.2%14.2o/o14.2%14.2%t4.2%14.2%t4.2%74.2%OPT MCTRIP CHARGErIME CHARGEDLT]..7tor.4ro4.4104.0rr2.2110.597.2107.596.4DRY DENSITY139.r%7,2%a.4%9.3%13.2%to.7%6.5o/o7.4%a.t%MOISTURECONTENT99.3%90.r%92.8%92.4o/o99.7%94.2%46.4%95.6%85.7%RELATIVECOMPACTIONPASSFAILFAILFAILPASSPASSFAILPASSFAILPASS/FArLCOMPACTIONCOMMENTS w.CAPSTONE..=T=-eruienpnrses WEST, ttcCtIENT J caliber constructionPROJECT Parcel2179os3o2024SOURCE DESCRIPTIONRifle Native SiltMAX DDttz.5OPT MC74.2%GEOTECHNICAL AND M¡NING ENGINEERINGTËSTING AND INSPECTÏON SERVICESóIB PARTEE DRIVEGRAND JUNCTION, CO 8I5O/-PHoNE (970) 250-555rJOB-NOCONTRACTORTESTED BY4354I Cal¡berM ChenowethACTIONS TO BE TAKENIEST RESULISsl20l20t9DATESERVICES PROVIDEDSTATE OF PROJECTAMAM/PMPad aooroved for concrete formsAfter re-work, pad showed good mo¡sture and density10987654321TESTMoisture ând Density TestingPãd brought to final gradeREPORT NO. 4354-02SGSGSGSGSGSGSG5GSGSGLIFTCenterEast Footer L¡neRETESTMid Eest Footer Line RETESTSouthwest OuarterSoutheast QuarterMid East Footer LineEâst Footer LineNortheest QuarterNorth Footer LineWest Footer L¡neLOCATIONsiltsilrs¡lts¡ltsilts¡ltsilrsiltsiltsiltPROCTORttz.5L12.5112.5112.5!L2.5L12.5112.57t2.5112.5trz.5Max DD14.2%t4.2%14.2%t4.Zo/"L4.2%14.2%14.2%L4.Z%t4.2%L4.2%OPT MCTRIP CHARGEIIME CHARGED110.9107.5107.5111.0111.1103.3104.3111.5118.5115.8DRY DENSITY139.4%a.9%6.1%70.4%105%6.7%5.s%7.a%17.7%1r.6%MOISTURECONTENT94.6%95.6%95.6ø/098.7o/o98.8%9t.a%92.7%99.7%t053%1o2.9%RELATIVECOMPACTIONPASSPASSPASSPASSPASSFAILFAItPASSPASSPASSPASS/FAILCOMPACTIONCOMMENTS