Architectural Control Committee
January 24, 2020
David and Sheila Poulson
VIA EMAIL
Re: Approval of Architectural Plans
Lot 14, Pinyon Peaks
David and Sheila,
RECEIVED
GARFIELD
COMMUNITY [3EVELOPMEN7
I am pleased to inform you the Pinyon Peaks Architectural Committee has reviewed and
approved your plans with the following conditions/clarifications;
1. Pinyon Peaks Architectural Control Committee approval does not constitute a County
Building Permit. This must be obtained from Garfield County prior to construction,
2. This approval does not constitute approval for any structural, mechanical, electrical or
any other functional aspect of the home and its construction. Approval is limited to
compliance with the Pinyon Peaks Covenants,
3. The Architectural Control Committee has determined the steel siding and the color
presented by you complies with the intent of the covenant which requires blending in
with the natural environment,
4. The driveway as presented on the plans is not approved and the driveway staked on
the lot is approved. The driveway represented on the plans calls for significant grading
to create an elevated platform of 4 to 6 feet which would be visible and not safe in
winter. While no grading plan has been submitted for the driveway that is staked on
the lot, this seems to represent a more logical alignment and would minimize grading.
However, since no grading plan has been submitted for review, either a grading plan
must be submitted for review and approval prior to construction, or an Architectural
Control Committee member must be notified during construction and approve the
alignment and grading as it is constructed.
5. All applicable components contained within the covenants shall apply. Additionally,
work should be scheduled around the spring and fall freeze/thaw cycles to prevent
road damage by heavy equipment and trucks. Owner is responsible for road damage
caused by construction traffic. Work hours shall be within 7:00 am to 6:00 pm,
Monday through Friday. Construction activity shall not exceed 18 months.
Thank you for your patience and we look forward having you as neighbors. If you have any
questions, comments or should require further clarification, please do not hesitate to contact
us,
On behalf of the Pinyon Peaks Architectural Control Committee,
Tom Stevens