HomeMy WebLinkAboutSoils Report 08.13.2019GEOLOGIC REVIEW AND
SOILS ENGINEERING
886 MESA DRIVE
RIFLE, CO
Prepared For:
Pinnacle Homes
Prepared By:
r i h :bfrrri.:•.�'l.;�r.'r4•.; :•i r4Y: tv.• r.: r% Y.4>Yrrr . •
CAPSTONE
ENTERPRISES WEST, LLC
GEOTECHNICAL AND MINING ENGINEERING
TESTING AND INSPECTION SERVICES
618 PARTEE DRIVE
GRAND JUNCTION, CO 81504
PHONE (970) 250-3331
August 13, 2019
Job No. 4439
CA PST0NE
ENTERPRISES W ES T, LLC
GEOTECHNICAL AND MINING ENGINEERING
TESTING AND INSPECTION SERVICES
618 PARTEE DRIVE
GRAND JUNCTION, CO 81504
PHONE (970) 250-3331
August 13, 2019
JOB # 4439
Attn:
Bill Grace
Pinnacle Homes
2755 North Ave #105
Grand Junction, CO 81501
Subject: Geologic Review and Soils Engineering Report
886 Mesa Drive
Rifle, CO 81650
At your request, Capstone Enterprises West, LLC directed and mapped the three
test pits excavated at aforementioned property. The purpose of our work was to
determine if the soils are suitable for support of the proposed foundation for the
structure. Or, if necessary, to provide recommendations to prepare a proper soil
sub grade for support of the proposed structure. A percolation test for a septic
system design was also performed. The results of which are cover in a separate
report.
The following maps show the location of the parcel and the approximate location
of the excavations.
CAPSTONE ENTERPRISES WEST, LLC 2
JOB NUMBER 4439
.—Site Location
h
. . t� • ,* fps
L , a
Ili "44
V4 `it 11111.41.14 f 1
t.
r^
TP -1
i r 4 .. . itt 4h •-
TP -2
l,r,nIwt .
P
+r
.4
CAPSTONE ENTERPRISES WEST, LLC 3
JOB NUMBER 4439
SITE DESCRIPTION
The property has been virtually undisturbed grazing land until the development of
the subdivision.
Geologically, the bedrock in the area is the Shire Member of the Wasatch
Formation (Tws). This particular site has been the site of erosional and
depositional environments. The bedrock was eroded at some time in the past
then blanketed with layers of silt, sand and gravel.
• Qlo - Wind deposited silt
• Qto- Water deposited terrace sediments
• Qsw- Landslide deposited sediments
SUBSURFACE INVESTIGATIONS
The geologic logs of the test pits are presented on the following page. No water
was encountered in the test pits nor was the evidence of a season high water
table.
CAPSTONE ENTERPRISES WEST, LLC 4
JOB NUMBER 4439
TP -1
VIII
K 10
1oroli
0000.0
0400
10044
$1+:
TEST PIT GEOLOGY
TP -2
Topsoil- Silt w/ Roots
Reddish Tan Silt
Firm Dry Clayey Silt
PI = 13
Dry Density = 117.1 pcf
Moisture = 11.5%
10 10
Topsoil- w/ Roots
Reddish -Tan Silt
Brown Silty Clay
PI = 10
Dry Density = 100.4 pcf
Moisture = 7.6%
LABORATORY TESTING AND RESULTS
The suitability for foundation material is generally determined by two tests: the
Swell/Consolidation test and the Atterberg Limits test. The Swell/Consolidation
test consists of placing an undisturbed sample of material in a device that applies
a load to the soil. The specimen compacts or "consolidates". After the initial load
stabilizes, the specimen is saturated, and the specimen will either swell or
consolidate further. The results for the native materials are presented on the
following pages. The relative compactions are calculated from a Standard
Proctor Test presented later in this report.
CAPSTONE ENTERPRISES WEST, LLC 5
JOB NUMBER 4439
TP -1 at 2 ft
PERCENT STRAIN
0.00%
-1.00%
-2.00%
-3.00%
-4.00%
-5.00%
-6.00%
-7.00%
-8.00%
-9.00%
-10.00%
CONSOLIDATION TEST REPORT
00
V
/ATE
2AD
DED
1
00
Job No.4439 Mesa View
APPLIED PRESSURE - psf
00
Job Number Job No.4439 Mesa View
Sample Source TP -1 at 2 ft
Sample Description Silt
Natural Dry Density 117.1 pcf 106% Relative Compaction
Natural Moisture Content 11.5% -3.2% From Optimum
Saturated Moisture Content 15.4%
This sample was very well consolidated and exhibited 0.6% swell, if 6 feet of this
material were to swell 0.6% that would result in vertical displacement of less than
1/2 inch. Proper moisture conditioning of the foundation subgrade will reduce this
risk even further.
CAPSTONE ENTERPRISES WEST, LLC 6
JOB NUMBER 4439
PERCENT STRAIN
TP -2 at 4 ft
0.00%
1
-1.00%
-2.00%
-3.00%
-4.00%
-5.00%
-6.00%
-7.00%
-8.00%
-9.00%
-10.00%
CONSOLIDATION TEST REPORT
00
1 OC)0
0
WAT
:RAD
DED
\\
Job No.4439 Mesa View
APPLIED PRESSURE - psf
00
Job Number Job No.4439 Mesa View
Sample Source TP -2 at 4 ft
Sample Description Silt
Natural Dry Density 100.4 pcf 91% Relative Compaction
Natural Moisture Content 7.6% -7.1% From Optimum
Saturated Moisture Content 21.9%
This sample has relatively good compaction. However, it will require moisture
conditioning and recompaction to produce a suitable foundation subgrade.
The Atterberg Limits Test gives an indication of the mechanical properties of fine
grained materials. The first part of the test is to determine the Plastic Limit of the
material. Then the Liquid Limit is determined. The difference between the Liquid
Limit and the Plastic Limit is defined as the Plasticity Index. Swell potential based
on the plasticity limit (PI) is shown on the following page.
CAPSTONE ENTERPRISES WEST, LLC 7
JOB NUMBER 4439
Plasticity Index (PI)
Inherent Swelling Capacity
0-15
10-35
Low
Medium
20-55
35+
High
Very High
(After Seed et al. 1962)
The results presented below indicate there is a low potential for swelling for the
silty clay material. While the shale samples have a slightly high capacity to swell.
This was confirmed in the swell consolidation tests.
Material
Source
Depth
Silty Clay TP -1
Silty Clay TP -2
2-3 ft
Liquid
Limit
32
Plastic
Limit
Plasticity
Index
Swell Potential
19
1-3 ft
28
13
Low to Moderate
18 10
Low to Moderate
The Atterberg Limits Tests indicate the silt soils is marginally suitable for
foundation structural fill.
The in place dry densities of the material tested in the Swell/Consolidation Tests
and a grab sample ranged from 100.4 to 117.1 pounds per cubic foot. These are
relative compactions of only 91 % and 106%.
DESIGN CONSIDERATIONS
As mentioned earlier, Wasatch Formation is the bedrock unit in this area. The
alluvial and colluvial sediments overlaying the Wasatch suitable for structural fill
when properly compacted. The lower density material demonstrated collapse
when saturated, while the well compacted sample from TP -1 exhibited slight
swelling when saturated.
It is important to make the foundation subgrade as
uniform as possible to prevent differential movement.
CAPSTONE ENTERPRISES WEST, LLC 8
JOB NUMBER 4439
DESIGN RECOMMENDATIONS
HOME FOUNDATION
We recommend this residence be constructed on a
conventional stemwall and
footer foundation system resting on a compacted mat of native soil. The mat should
be a minimum of 2 thick; one foot of soil removed and replaced after the subgrade
has been moisture conditioned and compacted. A maximum bearing load of 1,500
psf should not be exceeded.
A lateral earth pressure of 45 psf per linear foot should
be designed for. The following sketch shows the general requirements for the
foundation pad.
Landscape Backfill +92% Compaction at or above Opt MC
Native Backfill +95% Compaction +/-2% Opt MC
Base of Footer
Subgrade Moisture Conditioned and Compacted
+95% Compaction Near Opt MC
EXCAVATION
The topsoil should be removed and stockpiled for landscaping.
The footprint of the
foundation should be excavated 2 feet below the bottom of the planned foundation
elevation. The excavation should extend laterally 2 feet from the footprint of the
foundation.
HOME SUBGRADE PREPARATION
If moisture conditioning is required, the subgrade should be scarified a depth of 8 to
10 inches and thoroughly moisture conditioned to near optimum. Any soft spots
noticed during compaction should be removed or reconditioned.
CAPSTONE ENTERPRISES WEST, LLC 9
JOB NUMBER 4439
BACKFILL
Any imported structural fill should consist of non -expansive, granular material with a
PI of less than 10. The material should be moisture conditioned and placed in 4-6
inch lifts depending on the size of equipment used. The structured fill should be
compacted to at least 95 percent of the maximum standard Proctor density at a
moisture content (±)2% of optimum. We recommend that Capstone staff be
contracted to perform field moisture density testing to confirm compaction is being
obtained. Tests should be performed after the 1 foot of fill is compacted and at the
final grade. The relatively fine texture of the native silty sand is prone to break up
under traffic; therefore, Capstone recommends that once the silt is compacted it be
capped with a more traffic resistant material such as -1/4" crusher fines, unless the
concrete forms can be set immediately after compaction testing.
SLAB CONSTRUCTION
Slab -on -grade construction may be used if the same subgrade preparation as
described earlier is used:
• 1 -foot excavation below foundation
• Moisture condition bottom of excavation (preferably overnight)
• Compact subgrade and backfill to greater than 95% of Standard Proctor at
+/- 2% of optimum moisture
• Cap silty fill with -1/4" crusher fines if needed
WATER SOLUBLE SULFATES
Gypsum crystals were observed in the sediments. This indicates a sulfate content
of in excess of 2000 ppm. This concentration of water soluble sulfates represents a
severe degree of sulfate attack on concrete exposed to these materials. Based on
this observation, sulfate resistant cement (Type II modified) should be used in all
concrete exposed to the on-site soils.
CAPSTONE ENTERPRISES WEST, LLC 10
JOB NUMBER 4439
SURFACE DRAINAGE AND LANDSCAPING
The success of shallow foundations and slab -on -grade systems is contingent upon
keeping the subgrade soils at more or less constant moisture content, and by not
allowing surface drainage a path to the subsurface. Positive surface drainage away
from structures and exterior slabs must be maintained at all times. Landscaped
areas should be designed and built such that irrigation and other surface water will
be collected and carried away from foundation elements.
The final grade of the foundations backfill and any overlying concrete slabs or
sidewalks should have a positive slope away from foundation walls on all sides. We
recommend a minimum slope of 12 inches in the first 10 feet; however, the slope
can be decreased to 4 inches in 10 feet if the ground surface adjacent to
foundations is covered with concrete slabs or sidewalks.
Backfill material should consist of non -expansive, non -free draining granular
material. Backfill material should be placed near optimum moisture content and
compacted to at least 92% of maximum standard Proctor density in landscaped
areas and to at least 95% maximum standard Proctor density beneath structural
areas (sidewalks, patios, driveways, etc.). All roof downspouts and faucets should
discharge well beyond the limits of all backfill. Irrigation within ten (10) feet of
foundations and driveway slabs should be carefully controlled and minimized. The
collapsing soils are very sensitive to moisture changes. Thus, control of watering
and downspouts next to foundation members is essential.
LIMITATIONS
The analysis and recommendations submitted in this report are based in part upon
the data obtained from the excavations, field observations and laboratory testing.
The nature and extent of variation may not become evident until construction. If
variations then appear, it will be necessary to reevaluate the recommendations in
this report.
CAPSTONE ENTERPRISES WEST, LLC 11
JOB NUMBER 4439
It is recommended that the geotechnical engineer be provided the opportunity for
general review of the final design and specifications in order that earthwork and
foundation recommendations may be properly interpreted and implemented in the
design and specifications. It is also recommended that the geotechnical engineer,
or a qualified geo-technician under his supervision, be retained to provide
continuous engineering services during construction of the foundation, excavations,
and earthwork phases of the work. This is to observe compliance with the design
concepts, specifications, or recommendations and to modify these
recommendations in the event that subsurface conditions differ from those
anticipated.
This report does not constitute a warranty either expressed or implied, as no one
can predict the Tong -tern changes in subsurface moisture conditions resulting from
improper grading, excessive irrigation by the home owner or neighbors or other
causes during and after construction.
If you have any questions, or if we may be of further assistance, please do not
hesitate to contact us.
Respectfully Submitted:
CAPSTONE ENTERPRISES WEST, LLC
Martin W. Chenoweth, PE
Registered Professional Engineer
MWC
CAPSTONE ENTERPRISES WEST, LLC 12
JOB NUMBER 4439