HomeMy WebLinkAboutProject Description & Site PlanS II'2037' w
Grading plan for TBD N 13th. Silt, CO.
The area that we would like to work on grading is at the top north of the land. It is highlighted in the blue.
�rjrM■rwrs trllatI LDS
UR 11
AM JO
Ar It/ r*11or
'SOrTO' F
33.35 lb
■
a
.aim., +
a=oma:i •r•'•■‘.I
KaMAII•rrkV. #III. r d
ViaR r ■•#7i:' I
WASK I. r .0"il 1 U I
■1 MaI i•'•r tit''/
Si MIS ■I L a i ■=1111 SR/
I�IOI:[•.a:I.•#f� ''■
L EVAL Gt3C1S11770•44
We would start 3 ft from the fence and work on a slope of lft by lft, to get it to be leveled to
the middle part of the land. Currently the land has 3 areas all different levels. We would start at
3ft from where the fence is and take it down lft by lft. until we reach the similar level of where
the light pull is. In the actual pictures below, you can see the unevenness of the land the
desired outcome level. This area is about 375 ft by 50ft. We would direct
the grading to runoff to the street which is south of the land.
We will be pushing all the dirt towards that area.
--3ft---
7ft.
Since the land is so uneven in the 3 parts, we would take the extra earth dirt and move it to the
bottom part of the land to even it out with the middle part of the land. The picture below
demonstrates the land below and were it will be moved too, to bring the level of the ground a
little bit higher to meet with the middle area of the land. That lower area has an irrigation ditch
were we will be careful to do work around it. The random fences will also be taken out.
,______,__,______________.
1PoIrilnYreitia' {? C--A
trhq
.p",), 01/4
■
r}.
P; op.o sec( dra 'kt\o,G?.,
s FM
Proposer�
x.
I
EaswDIr ice! naz
avast iti:&A.:4-As •r■4I r�
IT 111111
r•-:
rims lritaamapti-
al is a stAirvz st IA BMW
;rAIM [3•:171C-
Moat
iracE7ar
5' cr-
S 7� R -0' 6,4r
1
N 7.11136. C
47.19
to t 1)0POW, UA
�J7�
s Zt.
nf.,
A0v 1Y
PINE
o Eck arac\;[-C.
-e.vecre-
L-50 "kit*
t�t
+&
O
ZaCkiY1 cki y4'&' 1�
1. t [\1�•(i a - c ��� SJ extck
of VA- laid 'co. by ;�;1 fine
i' 1°C112525:9 3°°1
/q 2so
' 8c)
35,
Erosion Control Plan Pinela Project:
- Tracking Pad
- Property Line
- Silt Fence
By Stutsman Gerbaz Inc.
Shay Stutsman
06-01-2020