Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-06-20-6333 and SEPT-06-20-6334 Uriel Mellin New Single -Family Residence TBD Callicotte Ranch Road, Carbondale Callicotte Ranch — Lot 23 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS. REDLINED NUMERICAL NOTATIONS ON PLANS REFER TO ITEMS ON THE ATTACHED "RESIDENTIAL PLAN REVIEW LIST". 3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 P.S.F. 4) INSTALLATION OF A RESIDENTIAL FIRE -SPRINKLER SYSTEM IS REQUIRED, AND SYSTEM SHALL BE DESIGNED TO COMPLY WITH N.F.P.A. 13D OR I.R.C., SECTION 2904. VERIFY ALL FIRE SPRINKLER SYSTEM REQUIREMENTS AND COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT. PROVIDE EVIDENCE OF ROUGH -IN APPROVAL AT FRAMING INSPECTION & FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) ALL RESIDENTIAL CONSTRUCTION AND SITE DEVELOPMENT SHALL MEET THE WILDFIRE MITIGATION CRITERIA AS PER "FIRE -WISE CONSTRUCTION: SITE DESIGN & BUILDING MATERIALS" PUBLISHED BY AND AVAILABLE FROM COLORADO STATE FOREST SERVICE. 6) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 7) ON -SITE WASTEWATER TREATMENT SYSTEM TO BE DESIGNED AND INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE FINAL APPROVAL REPORT FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) ACCESORY DWELLING UNITS (ADUs) ARE PROHIBITED IN THE CALLICOTTE RANCH SUBDIVISION (AS PER PLAT NOTE #28). 9) WOOD SHINGLES OR SHAKES ARE NOT ALLOWED IN THE CALLICOTTE RANCH SUBDIVISION (AS PER PLAT NOTE #32). 10) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.