HomeMy WebLinkAboutCorrespondenceDave Argo
From: Dave Argo
Sent: Monday, July 13, 2020 10:55 AM
To: mccallumb@stifel.com
Cc: Ikrol@garfield-county.com
Subject: Permit #BLRE-06-20-6339
Hunter & Breanna:
We are currently reviewing plans for a new home to be located at Richardson Minor Subdivision, Lot 2 in the South
Canyon area just west of Glenwood Springs.
However, before we can finalize our review or issue permits there are several items which must first be completed:
A. Engineered Foundation —According to the Final Plat, you must submit foundation plans as prepared by a
Colorado licensed Professional Engineer, and we have not received these to date.
B. There are very specific requirements regarding South Canyon Creek included on the Final Plat including the
following items:
1. 35-foot setback from the "Typical & ❑rdinary High Water Mark" — Although there is information
included on the survey indicating distance from the centerline of South Canyon Creek to the proposed
structure, there is not any indication of where the high water mark along the creek is located. Please
have your Surveyor provide this specific information as per the Resource Engineering floodplain
assessment dated 12/06/2019 and in compliance with Final Plat requirements.
2. Building Location on Lot 2 — Similarly, the Resource Engineering assessment also references a minimum
building elevation of the new structure's "lowest habitable floor" as a minimum of 7-feet above the flow
line of the creek. Although some existing grade elevations are provided on the survey with vertical
distance above the centerline of the creek, there is no reference for the proposed finished floor
elevation of the new residence provided on plans. Please have your Surveyor verify this information and
include on the survey.
Please submit (2) copies of this additional information to our office so that we can finalize our plan review and issue
permits for your project.
Thanks for your attention to this matter.
Dave Argo
Plans Examiner
L
_ Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
1
Dave Argo
From: McCallum, Breanna <mccallumb@stifel.com>
Sent: Monday, July 13, 2020 11:44 AM
To: Dave Argo
Subject: RE: [External] Permit #BLRE-06-20-6339
Hi Dave,
Thank you for being these details to our attention. We were surprise that our structural engineer did not submit our
foundation design; we will get that design to you asap. Additionally, we will contact our surveyor to make those
adjustments as well.
Thank you,
Breanna
Breanna McCallum, CFP®, CRPC°D
Financial Advisor
(970) 945-5275 main I (970) 945-5173 fax I mccallumb@stifel.com
2520 South Grand Avenue, Suite 210 1 Glenwood Springs, Colorado 81601
ST1FEL MNS Financial Group
Investment Services Since 1890
Visit our website at:
www.glenwoodstifel.com
Find us on n
From: Dave Argo <dargo@garfield-county.com>
Sent: Monday, July 13, 2020 10:55 AM
To: McCallum, Breanna (Glenwood Springs) <mccallumb@stifel.com>
Cc: Lindsay Krol <Ikrol@garfield-county.com>
Subject: Permit #BLRE-06-20-6339
Hunter & Breanna:
We are currently reviewing plans for a new home to be located at Richardson Minor Subdivision, Lot 2 in the South
Canyon area just west of Glenwood Springs.
However, before we can finalize our review or issue permits there are several items which must first be completed:
A. Engineered Foundation —According to the Final Plat, you must submit foundation plans as prepared by a
Colorado licensed Professional Engineer, and we have not received these to date.
B. There are very specific requirements regarding South Canyon Creek included on the Final Plat including the
following items:
1. 35-foot setback from the "Typical & Ordinary High Water Mark" — Although there is information
included on the survey indicating distance from the centerline of South Canyon Creek to the proposed
structure, there is not any indication of where the high water mark along the creek is located. Please
have your Surveyor provide this specific information as per the Resource Engineering floodplain
assessment dated 12/06/2019 and in compliance with Final Plat requirements.
2. Building Location on Lot 2 — Similarly, the Resource Engineering assessment also references a minimum
building elevation of the new structure's "lowest habitable floor" as a minimum of 7-feet above the flow
1
line of the creek. Although some existing grade elevations are provided on the survey with vertical
distance above the centerline of the creek, there is no reference for the proposed finished floor
elevation of the new residence provided on plans. Please have your Surveyor verify this information and
include on the survey.
Please submit (2) copies of this additional information to our office so that we can finalize our plan review and issue
permits for your project.
Thanks for your attention to this matter.
Dave Argo
Plans Examiner
CGarfield County r
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212 Ext. 1610
Email: dargo@garfield-county.com
Web: garfield-county.com
This message, and any of its attachments, is for the intended recipient(s) only, and it may contain information that is
privileged, confidential, and/or proprietary and subject to important terms and conditions available at
http://www.stitel.com/disclosures/emaildisclaimers/. If you are not the intended recipient, please delete this message
and immediately notify the sender. No confidentiality, privilege, or property rights are waived or lost by any errors in
transmission.
2