General Information
Activity Number: 1
Air Temperature (F): 75
Activity Date: 09/15/2020
Weather Conditions: Sunny, Dry
Site Observations
Contractors Equipment:
• Rubber tire excavator
• Jumping jack
Construction Observation and Communication:
I arrived on site at 1:05. The contractor was just about to begin excavating material. He had spent the morning hauling away soil he was not going to use to backfill. He had dug
down to 5 feet in the southwest corner. He will be ready for the first compaction test tomorrow afternoon.
Technician: Rubi Araiza
Reviewed By:
Daniel E. Hardin, P.E.
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.