Loading...
HomeMy WebLinkAboutConstruction Observation 09.15.2020Client: Project: I(+A Kumar 8 Associates, Inc. Gectechnical and Materials Engineers and Environmental Scientists kumarusa.com Glenwood Springs 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Construction Observation Doolen Construction 3838 County Road 243 New Castle, CO 81647 20-7-343.A Lot 32, Pinyon Mesa Pinyon Mesa, Cliffrose Way Carbondale, CO 81623 General Information Activity Number: 1 Air Temperature (F): 75 Activity Date: 09/15/2020 Weather Conditions: Sunny, Dry Site Observations Contractors Equipment: • Rubber tire excavator • Jumping jack Construction Observation and Communication: I arrived on site at 1:05. The contractor was just about to begin excavating material. He had spent the morning hauling away soil he was not going to use to backfill. He had dug down to 5 feet in the southwest corner. He will be ready for the first compaction test tomorrow afternoon. Technician: Rubi Araiza Reviewed By: Daniel E. Hardin, P.E. The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Page 1 of 1