HomeMy WebLinkAboutApplicationlipliornwe
BUILDING PERMIT
APPLICATION
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.ga rfield-county corn
TYPE OF CONSTRUCTION
n Commercial/Multi-Family
[� Manufactured Home (Single or Multi -Level)
I-1 Residential (SF, Duplex or Townhome)
Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET
Q Demolition
ID Reroof
INVOLVED PARTIES
Property Owner: Michael Bordrogi Phone: ( 970 )580-5373
Mailing Address: 998 Huebinger Dr. Glenwood Springs CO 81601
Email Address: mbodrogi1@gmail.com
Contractor: Giard Homes INC.
Mailing Address: 1431 Airport Rd., Rifle CO 81650
Email Address: roger.giard@giardhomes.com
Architect: Jeff Johnson
Phone: ( 970 ) 625-2347
Mailing Address: 136 East 3rd, Rifle CO 81650
Email Address: jjarch@rof.net
Phone: ( 970 )625-0580
Engineer: Studio M Engineers LLC
Mailing Address: 250 Tripp Dr., Rifle CO 81650
Email Address: studiom.engineer@gmail.com
Phone: ( 970 ) 366-8690
Manufactured Home Installer: Phone: ( )
Mailing Address:
Email Address:
PROJECT DETAILS
Describe Work: New Single Family
Job Address: Lot H26, Final Plat Aspen Glen, Filing NO.7
Assessor's Parcel Number: 239513406026
sub. Aspen Glen
Owner's Valuation of Work: $ 266,149.52
Lot
H26
Block
Property Size (Sq. Ft. or Acres):.64 acres
Sq. Ft. of Building: 2514 Height: 20' 1 1/16" # of Floors: 2
Class of Work: fNew
Garage: I Y Attached
:❑ Remodel/Alteration
El Addition
Detached
PROJECT DETAILS CONTINUED
•
Septic: WT5
Ty �e of Heat:
f Natural Gas
Permit: Exempt
Permit:
N • ICE
Propane
Community
— -4- —
n Electric
L.__I Other
LIPermit #:
Authority. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by
thelOwner, must be provided with this Application.
Legion Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a'•State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION — —
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
per ission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the�uilding Division. In consideration of the issuance of the Building Permit, I agree that I and: my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
othel- applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. f
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requ ring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applipable law. Review of this Application, including submittals, and inspections of the work by the Building
Divis an do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and county Regulations rest with me and my authorized agents, including without limitation my architect
desi er, engineer and/ or builder.
I herey acknowledge that I have read and understand the Notice and Certification above, as well as, have
providd the required information which is correct and accurate to the best of my knowledge.
�(S® o M/Q Rhea? ./ f--1/ -zd
Property Owner Print and Sign
OFFIgAL USE ONLY
Special Conditions:
Date
g,LL G 'G 4 1,i* of ati(1.41'0(w5.
Adjusted Valua ion: Plan Cheek Fee: Permit Fee:
11 Manu. Home fee:
Kemal, 11,1104 et&
L9ftIO;c)
Misc. Fees:
04763z
4763
Iptal (Fees: fees Paid: Balance Due: BP No: OWTS No:
3/'3740.61 12 eZ 11714 t gam- 11:1 1 Nhl
?etb iks•_ u ( OCC Group: (gG Const. Type: mc Zoning: g: Puy
1076,71,010
Signed Approval Date
BUILD NG / PLANNING DIVISION :
PD- 1253 SZ 10
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
BUILDING PERMIT
FEE ESTIMATE
WORKSHEET
Applicant: Michael Bodrogi
Project Address: Lot H26,Filing No.7
Subdivsion: Amen Gten
Phone: 970-580-5373
Lot:
Block:
UMW SOW
Square Feet
Valuatio _
Finished Living Space (N/A for Manufactured Homes)
2514
187,745.52 $74.68
Unfinished Basement
Multi -Levet ($600)
$41.00
Crawl Space
2514
45,252 $18.00
Garage (Conditioned) (i.e. insulation, sheetrock)
802
25,664 $32.00
Garage (Unconditioned)
$24.00
Covered Patio/Deck
416
7488 $18.00
Uncovered Patio/Deck
$12.00
Misc:
$0.00
Misc:
$0.00
266,149.52 ;$;l1P
Manufactured Home Set-up
by Garfield County
Fee _
gle Level ($400)
Manufactured Home Set -Up Fee
$0.00
Multi -Levet ($600)
Other (Ex: Road Impact Fee)
Total Fees Due
$0,00
Septic (OARS)
Fee
New Installation ($123)
$0.00
Alteration and/or Repair ($75)
$0.00
IOW - . This Section Determined
by Garfield County
Plan Review Fee
Building Permit Fee
Manufactured Home Set -Up Fee
Septic Fee (OWTS)
Other (Ex: Road Impact Fee)
Total Fees Due
$0.00
***All fees are estimates until final plan review is comp le
Garfield County
BUILDING DEPARTMENT
108 Eighth Street, Suite 401, Glenwood Springs, CO 81601
Tel: (970) 945-8212
PLAN REVIEW CHECKLIST
Permit No: $I -K"01 -2O -404a7
Building Issues
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ Topography 30%
Attach Residential Plan Review List
Subdivision Plat Notes
Fire Department Review
Valuation Determination/ Fees
Red Line Plans/ Stamps/ Sticker
Attach Conditions
Application Signed
Plan Reviewer to Sign Application
Parcel/ Schedule No.
40# Snowload Letter — Manu. Homes
Soils Report
Skwiaw/ : Are&
(,lN(ivii9Si O A*0
f7IW4JL
Cpv.Gv4$- pafia
COW l ° a-
Planning/Zoning Issues
N4
NA
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
r Building Height
f Zoning Sign -Off
Road Impact Fees
Grade/ Topography 40%
Planning Issues
Subdivision Plat
Description & Summary:
iao A ('i F-& $ 2) 703.
(itcA• 17191yio'('
117.0 x 4 ?500
x 400
615 x 92.1x
-470 x 4 4.00
2)520 x 16.00
4 I A,006.
x
4 4,46,0.
42g?)5 -