Loading...
HomeMy WebLinkAboutApplicationlipliornwe BUILDING PERMIT APPLICATION Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.ga rfield-county corn TYPE OF CONSTRUCTION n Commercial/Multi-Family [� Manufactured Home (Single or Multi -Level) I-1 Residential (SF, Duplex or Townhome) Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET Q Demolition ID Reroof INVOLVED PARTIES Property Owner: Michael Bordrogi Phone: ( 970 )580-5373 Mailing Address: 998 Huebinger Dr. Glenwood Springs CO 81601 Email Address: mbodrogi1@gmail.com Contractor: Giard Homes INC. Mailing Address: 1431 Airport Rd., Rifle CO 81650 Email Address: roger.giard@giardhomes.com Architect: Jeff Johnson Phone: ( 970 ) 625-2347 Mailing Address: 136 East 3rd, Rifle CO 81650 Email Address: jjarch@rof.net Phone: ( 970 )625-0580 Engineer: Studio M Engineers LLC Mailing Address: 250 Tripp Dr., Rifle CO 81650 Email Address: studiom.engineer@gmail.com Phone: ( 970 ) 366-8690 Manufactured Home Installer: Phone: ( ) Mailing Address: Email Address: PROJECT DETAILS Describe Work: New Single Family Job Address: Lot H26, Final Plat Aspen Glen, Filing NO.7 Assessor's Parcel Number: 239513406026 sub. Aspen Glen Owner's Valuation of Work: $ 266,149.52 Lot H26 Block Property Size (Sq. Ft. or Acres):.64 acres Sq. Ft. of Building: 2514 Height: 20' 1 1/16" # of Floors: 2 Class of Work: fNew Garage: I Y Attached :❑ Remodel/Alteration El Addition Detached PROJECT DETAILS CONTINUED • Septic: WT5 Ty �e of Heat: f Natural Gas Permit: Exempt Permit: N • ICE Propane Community — -4- — n Electric L.__I Other LIPermit #: Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by thelOwner, must be provided with this Application. Legion Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a'•State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION — — I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting per ission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the�uilding Division. In consideration of the issuance of the Building Permit, I agree that I and: my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any othel- applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. f further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requ ring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applipable law. Review of this Application, including submittals, and inspections of the work by the Building Divis an do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and county Regulations rest with me and my authorized agents, including without limitation my architect desi er, engineer and/ or builder. I herey acknowledge that I have read and understand the Notice and Certification above, as well as, have providd the required information which is correct and accurate to the best of my knowledge. �(S® o M/Q Rhea? ./ f--1/ -zd Property Owner Print and Sign OFFIgAL USE ONLY Special Conditions: Date g,LL G 'G 4 1,i* of ati(1.41'0(w5. Adjusted Valua ion: Plan Cheek Fee: Permit Fee: 11 Manu. Home fee: Kemal, 11,1104 et& L9ftIO;c) Misc. Fees: 04763z 4763 Iptal (Fees: fees Paid: Balance Due: BP No: OWTS No: 3/'3740.61 12 eZ 11714 t gam- 11:1 1 Nhl ?etb iks•_ u ( OCC Group: (gG Const. Type: mc Zoning: g: Puy 1076,71,010 Signed Approval Date BUILD NG / PLANNING DIVISION : PD- 1253 SZ 10 Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com BUILDING PERMIT FEE ESTIMATE WORKSHEET Applicant: Michael Bodrogi Project Address: Lot H26,Filing No.7 Subdivsion: Amen Gten Phone: 970-580-5373 Lot: Block: UMW SOW Square Feet Valuatio _ Finished Living Space (N/A for Manufactured Homes) 2514 187,745.52 $74.68 Unfinished Basement Multi -Levet ($600) $41.00 Crawl Space 2514 45,252 $18.00 Garage (Conditioned) (i.e. insulation, sheetrock) 802 25,664 $32.00 Garage (Unconditioned) $24.00 Covered Patio/Deck 416 7488 $18.00 Uncovered Patio/Deck $12.00 Misc: $0.00 Misc: $0.00 266,149.52 ;$;l1P Manufactured Home Set-up by Garfield County Fee _ gle Level ($400) Manufactured Home Set -Up Fee $0.00 Multi -Levet ($600) Other (Ex: Road Impact Fee) Total Fees Due $0,00 Septic (OARS) Fee New Installation ($123) $0.00 Alteration and/or Repair ($75) $0.00 IOW - . This Section Determined by Garfield County Plan Review Fee Building Permit Fee Manufactured Home Set -Up Fee Septic Fee (OWTS) Other (Ex: Road Impact Fee) Total Fees Due $0.00 ***All fees are estimates until final plan review is comp le Garfield County BUILDING DEPARTMENT 108 Eighth Street, Suite 401, Glenwood Springs, CO 81601 Tel: (970) 945-8212 PLAN REVIEW CHECKLIST Permit No: $I -K"01 -2O -404a7 Building Issues Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign Application Parcel/ Schedule No. 40# Snowload Letter — Manu. Homes Soils Report Skwiaw/ : Are& (,lN(ivii9Si O A*0 f7IW4JL Cpv.Gv4$- pafia COW l ° a- Planning/Zoning Issues N4 NA Property Line Setbacks 30 ft. Stream Setbacks Flood Plain r Building Height f Zoning Sign -Off Road Impact Fees Grade/ Topography 40% Planning Issues Subdivision Plat Description & Summary: iao A ('i F-& $ 2) 703. (itcA• 17191yio'(' 117.0 x 4 ?500 x 400 615 x 92.1x -470 x 4 4.00 2)520 x 16.00 4 I A,006. x 4 4,46,0. 42g?)5 -