HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-08-20-6459
NAB 6776, LLC
Nelson's Auto Body — Addition to Existing Structure
Amended Plans with Reduction to Overall Building Size
6776 Highway 82, Glenwood Springs
1) WORK SHALL COMPLY WITH THE FOLLOWING CODES: 2015 I.B.C., I.F.C., I.M.C., I.P.C.,
AND 2009 I.E.C.C. AND SHALL ALSO COMPLY WITH STATE & FEDERAL REGULATIONS &
MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS,
PLAN REVIEW COMMENTARY AND INSPECTIONS POLICY.
3) BUILDING IS APPROVED AS I.B.C. CONSTRUCTION TYPE V-B AND OCCUPANCY GROUP
S-1 (STORAGE/MODERATE HAZARD) WITH NO AUTOMATIC FIRE SPRINKLER SYSTEM.
DO NOT EXCEED MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE & COMBUSTIBLE
MATERIALS AS PER 2015 I.B.C., SECTION 414 AND I.F.C., CHAPTERS 27 AND 34.
4) CONTACT LOCAL FIRE DISTRICT ABOUT ALL I.F.C. REQUIREMENTS, INCLUDING FIRE
EXTINGUISHERS, ALARMS, ETC. FIRE DISTRICT'S FINAL APPROVAL LETTER IS REQUIRED
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
5) ALL HIGH -STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR &
SIGN -OFF PER I.B.C., CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
6) MEANS OF EGRESS SHALL COMPLY WITH I.B.C., CHAPTER 10 REQUIREMENTS. EXIT
DOORS AND LANDINGS AT DOORS PER SECTION 1010. LOCKS, LATCHES & LANDINGS
PER SECTION 1008. MEANS OF EGRESS ILLUMINATION PER SECTION 1008.
7) BUILDING ACCESSIBILTY REQUIREMENTS AS PER 2015 I.B.C., CHAPTER 11, AND I.C.C.
A117.1-2009 STANDARD FOR ACCESSIBILE BUILDINGS & FACILITIES.
8) VENTILATION & LIGHTING AT BUILDING INTERIOR AS PER SECTIONS 1203 AND 1205.
9) BUILDING MECHANICAL SYSTEMS SHALL COMPLY WITH INTERNATIONAL MECHANICAL
CODE (I.M.C.) AND I.E.C.C., SECTION 503. MECHANICAL ROUGH -IN INSPECTION
REQUIRED PRIOR TO FRAME INSPECTION.
10) PLUMBING REQUIREMENTS AS PER INTERNATIONAL PLUMBING CODE (I.P.C.) AND
PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
11) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME
INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION
& CERTIFICATE OF OCCUPANCY.
12) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH I.E.C.C., SECTION 505.