Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-08-20-6459 NAB 6776, LLC Nelson's Auto Body — Addition to Existing Structure Amended Plans with Reduction to Overall Building Size 6776 Highway 82, Glenwood Springs 1) WORK SHALL COMPLY WITH THE FOLLOWING CODES: 2015 I.B.C., I.F.C., I.M.C., I.P.C., AND 2009 I.E.C.C. AND SHALL ALSO COMPLY WITH STATE & FEDERAL REGULATIONS & MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS, PLAN REVIEW COMMENTARY AND INSPECTIONS POLICY. 3) BUILDING IS APPROVED AS I.B.C. CONSTRUCTION TYPE V-B AND OCCUPANCY GROUP S-1 (STORAGE/MODERATE HAZARD) WITH NO AUTOMATIC FIRE SPRINKLER SYSTEM. DO NOT EXCEED MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE & COMBUSTIBLE MATERIALS AS PER 2015 I.B.C., SECTION 414 AND I.F.C., CHAPTERS 27 AND 34. 4) CONTACT LOCAL FIRE DISTRICT ABOUT ALL I.F.C. REQUIREMENTS, INCLUDING FIRE EXTINGUISHERS, ALARMS, ETC. FIRE DISTRICT'S FINAL APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) ALL HIGH -STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR & SIGN -OFF PER I.B.C., CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 6) MEANS OF EGRESS SHALL COMPLY WITH I.B.C., CHAPTER 10 REQUIREMENTS. EXIT DOORS AND LANDINGS AT DOORS PER SECTION 1010. LOCKS, LATCHES & LANDINGS PER SECTION 1008. MEANS OF EGRESS ILLUMINATION PER SECTION 1008. 7) BUILDING ACCESSIBILTY REQUIREMENTS AS PER 2015 I.B.C., CHAPTER 11, AND I.C.C. A117.1-2009 STANDARD FOR ACCESSIBILE BUILDINGS & FACILITIES. 8) VENTILATION & LIGHTING AT BUILDING INTERIOR AS PER SECTIONS 1203 AND 1205. 9) BUILDING MECHANICAL SYSTEMS SHALL COMPLY WITH INTERNATIONAL MECHANICAL CODE (I.M.C.) AND I.E.C.C., SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 10) PLUMBING REQUIREMENTS AS PER INTERNATIONAL PLUMBING CODE (I.P.C.) AND PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 11) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 12) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH I.E.C.C., SECTION 505.