HomeMy WebLinkAboutOWTS Design Plan 11.01.2020` i /f ) // / / / / / / / / // / / / / / / f / / /// // r 3 / / / �f ' 1 1 �/ // i o ; BURIED CULVERT DRIP UNE DRIP UNE EXISTING DRIVE CO- 325 ABANDON, REMOVE GATE AND REPLACE WITH FENCE CDOT ACCESS PERMIT DETAILS, REQUREMENTS, AND DESIGN CRITERIA Permit No. 320111 Location; HWY 325A, MP 3.172 Right Road Classification; R-B (Rural Highway) These Drawings will be marked preliminary until a Notice to Proceed is Issued by CBOT Owner or Contractor may NOT proceed with any construction without receiving an approved Notice to Proceed (NTP) from CDO7 Failure of receiving a Notice to Proceed prior to any construction will be a violation of the State Highway Access Code (2 CCR 601-i,"the Code') § 2.4. SSD (Stopping Sight Distance); Field measured by Colorado River Engineering= Southbound; 426-feet Northbound:+700-feet SSD Code Requirements; Tables 4-1 & 4-2. Table 4-2 is more controlling and is for the vehicle entering the highway. The posted speed limit is 40 mph, the use is residential, controlling 55D is 400-feet. The code has an adjustment for grade, using survey points for the centerline for the northerly (southbound lane) sight distance grade is approximately i% and therefore no adjustment factor is req'd (Table4-4). The approach from the south (northbound lane) slope is 3% on average downgrade use 1.2 Factor, SSD =1.2 x 400= 480 SSD reqmt, 600+ available, ok. The traffic control plan must be: A. Comply with CDOT Standard Plans Manual for Maintenance and Signing; and B. Be consistent with the MUTCD, identifying the type, number and spacing for all devices; and C. Be prepared by individual with American Traffic Safety Services Association (ATSSA) or Colorado Contractors Association certification - or sealed (stamped) by a Colorado registered professional engineer; and D. Be acceptable to CDOT prior to any construction within the right-of-way; and E. Be presented in a manner that provides a method of handling traffic (MHT) for each different phase of construction; and F. Describe the MHT according to the proposed construction phasing and include dimensioned diagrams of work zone elements, with the final traffic control plan submitted a minimum of three working days in advance of construction. (Such plans may be revised as necessary with CDOT concurrence.) BASE SURVEY DATA FROM TRAVIS 1 KAISER PLS. Description These drawings have been prepared for the client identified on the design sheet titleblock. Unless these drawings bear a signed engineers seal, they may be used only at owners sole risk. Drawing Revisions Approved Engineer's Seal MAX 100' [EXPOSED PIPE I BURIED CULVERT PROPOSED WELL LOCATION PROPOSED PROPANE TANK (BURIED) Original Drawing Preparation Checked Approved Client Approved sealed PROPOSED HOME SiTE PROPOSED ELECTRIC 10/2020 II/1/2020 - RIFLE CREEK CANYON DITCH PROPOSED SEPTIC TANK FEMAZONE B PROPOSED DRIVE WEST LATERAL RCCD 60' RIGHT OF WAY, SEE DRAKE CONSULTING SURVEY CoLo1ao RIVER ENGINEERING IAC ORPORATED SHEET TITLE: PO Box 1301 Rifle, CO 81650 Tel970-625-4933 EFFLUENT LINE PROPOSED WASTEWATER TREATMENT AREA (SEE SHEET 6) FEMA ZONE A3 NEWT TIC C/o Mike Johnson 970-366-6100 PROJECT: MWJ LLC SITE PLAN CRE FILE: M:\Land Projects R2'\.1213-Johnson\dwg\CRE SITE PLAN Design dwr MIN SETBACK 10' SITE PLAN 11/1/2020 SHEET NO. OF 7 Revision A FEMA ZONE A3 SEE SHEET 7 FOR DETAILS AND SPECIFICATIONS. Description These drawings have been prepared for the client identified on the design sheet titleblock. Unless these drawings bear a signed engineers seal, they may be used only at owners sole risk. FEMA ZONE B INFILTRATOR ROW, 6 EACH — QUICK 4 INFILTRATORS Drawing Revisions DRAINAGE SWALE 3' WIDE, 1 FOOT DEEP, MIN SLOPE 1% MIN SETBACK 10' Approved EFFLUENT LINE Engineer's Seal PROPOSED WASTEWATER TREATMENT AREA Original Drawing Preparation Checked Approved Client Approved sealed 10/2020 II/1/2020 DISTRIBUTION BOX SETBACK 50' COLORADO RIVER ENGINEERING INCORPORATED RIFLE CREEK CANYON DITCH APPROXIMATE PROPERTY BOUNDARY PO Box 1301 Rifle, CO 81650 Tel 970-625-4933 MWJ LLC C/o Michael Johnson 970-366-6100 PROJECT: MWJ LLC SITE PLAN CRE FILE: M:\Land Pr jects R2\1213-Johnson\dwg\CRE SITE PLAN Design dwg 11/1/2020 SHEET TITLE: WASTEWATER -TREATMENT PLAN SHEET NO. OF 7 Revision A 24" O Manhole Frame & Cover. Concrete and Cast Iron Riser Shown. Alternate HDPE or Fiberglass may be used. Inlet and Outlet Pipes to be Sealed with Waterproof Material (typ) — 24" 24" Pipe To Septic Tank 4" SDR 35 Sewer, Typ. (Schedule 40 Under Roads) (min. Slope = 2%) Septic Tank (Traffic Rated if Installed in Roadway) Actual Invert Elevation of pipe leaving building unknown pending mechanical design by others. b Inlet Inverts shall be at least 3" Higher than the Outlet Invert 1250 Gallon Min. Septic Tank (Divided) Concrete Septic Tank Detail SOLE Vat . Snob Double Clean -Outs w/Removable Caps on line from Building to Septic Tank. Bi-Directional Cleanouts may be substituted. L o "3 ▪ 3 L o c ▪ = U c my c m w am to io w 1_ Y C 2 u Cleanout Detail SOIE it. Stab Treatment Area Infiltrator Plan SOME Ng fah Pipe To Septic Tank 4" SDR 35 Sewer, Typ. (Schedule 40 Under Roads) (Min. Slope = 2%) cr m Maximum Length from building to Septic Tank 100' Example piping layout shown. May be altered to accommodate distribution box hole layout. Min. Slope 2% to Trenches. Install Polylok Equalizer, Tuf-Tite Leveler, or Equal at Inlet of Each Feeder Pipe. L 1 itlkS Effluent Screen w/ Handle Extended to within 24" of surface. Concrete Septic Tank Shown. Alternate 2 Chamber HDPE Tank and Risers may be substituted. Concrete Distribution Box Shown. Alternate HDPE Box may be substituted. 36" HDPE or Fiberglass Riser w/ Lid for access to Flow Equalization Devices. 4" Pipe to Distribution Box. Approx. 400'. Min. Slope = 2% Install Cleanout at each 100' or at each pipe angle transition. Install Tracer Wire with Pipe. 36"0 Access w/Lid 4' SDR 35 Sewer Pipe to Trenches —\ , 1 m 1 Distribution Box w/ Baffle. Bed on 6" Cl. 6 Base Course Compact Base to 95% Modified Proctor. Concrete Distribution Box Shown. Alternate HDPE Box may be substituted. 11 Hole Distribution Box Shown. Alternate 7 Hole Box may be substituted. 36" HDPE or Fiberglass Riser w/ Lid Distribution Box Detail Original Grade Backfill with excavated materials. Max 1' lifts. Compacted to 95% modified proctor density. 4" Pipe from Septic to Distribution Box r-2.0'—1 Wastewater Pipe Trench Detail iYEYbSob SYSTEM DESIGN: An On -site Wastewater Treatment System (OWTS) is intended to serve the proposed Johnson Residence at Rifle Gap. For wastewater design purposes, the residence will contain 3 bedrooms and accommodate up to 6 residents. Therefore, the expected Daily Wastewater Design Capacity is 450 gallons. The Minimum required septic tank size is 1,000 gallons although a 1,250 gallon tank is recommended. The septic tank size requirements will be met by one 1,250-gallon concrete or HDPE tank. The tank will collect the influent from the residence. The septic tank will discharge by gravity to a distribution box. Effluent from the distribution box will flow by gravity to the soil treatment area located to the south of the residence. For design purposes, the soil percolation rate is based on the percolation tests cond ucted at the Johnson Property. The measured average soil percolation rate was determined to be 28.3 min/inch. Conservatively, a design soil percolation rate for soils with percolation rates between 41 to 60 min/inch will be used. Design Percolation Rate: 41-60 min/inch Design Long Term Acceptance Rate (LTAR): 0.35 gal/sq.ft./day The required Soil Treatment Area (STA) for a gravel type leach area is calculated using the following formula: STA = Design Flow / LTAR Therefore, STA = 450-gpd / 0.35 gal/sq.ft./day STA = 1,286-sq.ft. OWTS regulations allow a maximum reduction of 30% of the required soil treatment area for a gavelless type design in a Trench configuration. The proposed system will be a Chambered system in a Trench configuration. Therefore, the required Soil Treatment Area = 1,286 sq.ft. x 0.7 = 900 sq.ft. Required number of standard Quick 4+ Infiltrator Units = 900 sq.ft. / 1133 sq.ftjunit = 80 units Conservatively, the system system size will be increased by 20% to 96 Standard Quick 4+ Infiltrator Units. There shall be 6 Trenches with each being 16 units long for uniformity for a total of 96 units. Minimum Horizontal Setbacks: Min. Setback from Welts: Min. Setback from Creek and Ditch: Min. Setback from Property Lines: 100 ft 50ft 10ft The above designed OWTS shall be installed to satisfy all minimum setbacks and design standards as described by Garfield County and Colorado State regulations and will be installed according to all manufacturers specifications and recommendations. 4" PVC Inspection Ports (typ) at end of each row. Protect with Irrigation Valve Box. 4" Notch to be cut in Infiltrator and secured with screws. Use a cap or threaded plug to seal each port. A Actual elevations to be determined based on existing conditions encountered in the field. Finished Grade \\...____ Backfill with Excavated Soils (See Infiltrator installation instructions) Quick4+ Infiltrator Units, Trench configuration f) g) h) 6) a) b) c) d) e) f) NOTES: 1) General a) Engineered system requires Engineer's approval on all constructed items. b) Contractor shall notify engineer of construction progress so that engineer may schedule inspections accordingly. c) No back fill will occur on constructed items prior to engineer's inspection and approval. d) Engineer shall be notified when soil treatment area is under excavation e) Contractor shall reclaim all disturbed areas to pre existing conditions. f) For areas where vegetation is disturbed, contractor shall reseed with NRCS approved seed mixture or as approved by owner. g) Grading shall be accomplished such that roof drains, foundation drains, area drains or cistern overflows shall not enter the septic tank or any part of the wastewater treatment system. h) Contractor responsible for locating water lines, wastewater lines, irrigation lines and other utilities that may or may not be shown. 3) Soil Treatment Area a) Orientation can be adjusted to match ground contours as long as setbacks shown on plan view are met. b) Alternative configurations of number of rows and length can be constructed as long as setbacks are maintained, total area is not reduced, and proposed layout is provided to engineer for prior approval. c) The final cover over the trenches shall be graded to deflect run-off water away from the soil treatment area. 4) Distribution Box a) Contractor may use a single distribution box as shown on plan or multiple boxes may be used with sketch plan to be provided to engineer for prior approval. b) Location of distribution box(es) and pipeline route to each trench may be field adjusted. c) Distribution box(es) shall be constructed with the inlet invert at least 1 inch above the level of the outlet inverts. 5) Pipelines a) The contractor may use a 6" PVC alternate, minimum slope would be 1%. b) The pipeline alignment may be field adjusted to avoid existing infrastructure and utilities as long as minimum slope and minimum bury depths are maintained. c) The sewer line shall have a minimum offset distance of 10-feet from any water line. d) At water line crossings, the sewer shall either be 18" below the water line or encased 10-feet each side in concrete or larger diameter pipe. Water line/sewer line separation encroachments must comply with CDPHE encasement requirements. e) Cleanouts per plumbing code. Double cleanout between buildings and septic tank may be removed if plumbing code allows use of interior building cleanout and access bends in the building sewer shall be limited to 45" ells or long sweep quarter bends. All plumbing fixtures, sewers, vents, and appurtenances shall comply with State and local plumbing codes. All pipe trenches shall be recompacted to 95% std density or as field approved by engineer. Sch. 40 PVC is required whenever the building sewer is located under a driveway. Alternatively, pipe to be bedded with material to be approved by engineer. Septic Tank The distance from the outlet invert to the tank cover shall be at least 12 inches. Liquid depth shall be a min. of 30 inches and the max. depth shall not exceed the tank length or 60 inches, whichever is less. The volume of the first compartment shall hold no less than 1/2 of the required effective capacity. The transfer of liquid from the first compartment to the second shall be made at a liquid depth of at least 14 inches below the outlet invert but not in the sludge zone. No enclosed structure shall be constructed over the septic tank. Tanks shall be inspected annual and pumped every 5-years, or as needed. 6 Trenches Each with 16 Quick 4+ Units. Minimum 6' Spacing Between Rows. Stub 4" SDR 35 Sewer Pipe into Infiltrator Unit and secure with screws. Install splash plate below inlet. Scarify Excavated Leaching Surface (Keep Heavy Equipment Out of Excavated Area). Entire Leaching Bed/Trench Surface to be Level Within 0.1 feet. Treatment Area Infiltrator Profile bile Not bSeib These drawings have been prepared for the client identified on the design sheet titieblock. Unless these drawings bear a signed engineers seal, they may be used only at owners sole risk. Engineer's Seal 11/1/2020 Drawing Revisions Original Drawing Preparation No t0 A Description By Date Approved Date Drawn By JDL Date 10/2020 Checked Approved Client Approved CM sealed 11//2020 CoaAoO ENGINEERING 1JCORPORATILD PO Box 1301 Rifle, CO 81650 Tel 970-625-4933 CLIENP MWJ LLC C/o Michael Johnson 970-366-6100 PROJECT: MWJ LLC SITE PLAN CRE FILE: M:\Inf Projects R2U213-JohnsonWwggCRE SITE PLAN Design.dwg SHEET TITLE: WASTEWATER DETAILS SHEET NO. OF 7 Revision A