Loading...
HomeMy WebLinkAboutOWTS NarrativeRIFLE READY MIX 25828 Highway 6 Rifle, CO 81650 United Companies 2273 River Road 970-243-4900 Grand Junction, CO 81505 Robert.lewis@unitedco.com UUIRU COMPANIES ACRH COMPANY 1 United Companies Rifle Ready Mix OWTS Project Background and Description 8 New Production Equipment, equipment enclosure and production offices United Companies is proposing construction of a replacement Ready Mix Concrete production facility located at 25828 Highway 6 & 24, Rifle, CO (Parcel #217711300451) Township 6S Range 94W SW Corner Section 11 and NW corner section 14, operating under Special Use Resolution 89-030 filed with Garfield County under Parcel #217711300298. These sites were previously owned and operated by Casey Concrete Co. and purchased by United Companies in 2008. This facility will act as replacement equipment for the existing production facility to replace worn production equipment as well as provide a building envelope that encloses exposed materials storage bins providing ability to better control material exposure to weather. The existing production facility will remain in operation until the new facility is completed and operational. Existing Conditions 8 Existing Conditions of Construction Site and Surrounding Area Currently United Companies utilizes a vault and haul system located at the existing Ready -Mix Production Facility. This facility includes a 1,260 square foot metal building surrounding the plant equipment, a 350' square foot office trailer for production controls and 3 separate storage sheds for various tools and materials storage. The existing vault is located on the North East corner of the existing production facility and will stay in place until future demolition of the existing Production Facility is completed. The production water is currently sourced from an in ground well located just North of production Facility. The proposed area for the new vault is approximately 250' North of the existing vault and will be situated on the East side of the new production facility building in the light vehicle parking area. There are currently no structures in this area. Proposed Conditions 8 Planned Water Source & OWTS The existing well will remain in place and be utilized to provide Non -Potable production water to the new facility as well as aggregate stockpile watering to help control dust and maintain aggregate moisture saturation. Additionally, United Companies will look to add a future well approximately 120' South of the new production facility that will be sourced to provide Non -Potable production water to the facility. A new Septic Vault will be installed at the North East corner of the new production facility just North of the light vehicle parking area. As described in the letter provided by Huddleston -Berry the existing conditions will not allow for a traditional absorption field. A vault system of one (1)1500-gallon tank will be installed with a float level indication system. The level indication system will be installed in the last baffle of the tank. This vault will be monitored by the production foreman as well as a level indication device and will be placed on a scheduled clean out by third party waste management companies. Following installation of the new production facility and OWTS United Companies will dismantle the existing equipment and regrade the site to match existing profiles. The current vault system will be abandoned through clean out by third party waste management companies, the bottom of the tank will be broken and the top collapsed and will be back filled with a controlled low strength material (flow fill). The site will be graded to surrounding conditions. 2 Timeline 8 Construction & Demolition Timeline • Phase I - Construction of New Facility - Early 2020 • Phase II - Installation of new OWTS - 2nd Quarter 2020 • Phase III - Plant Demolition and existing OWTS abandonment - Remaining 2020 0 W 0 0 W Z IN z N D SSJODV „IZs - 1W01 V)A NW (ON 1n Or• Z ZZ- D (7 A A--. O z r D m D Dm Tlr Zr Dm >o_1N AA-4 o- > m - 9 > Ar Fc m➢ >0 mZ Nm HN -iZ X NI m 0 W Sril N A o C J 0�0 OZ DH ND K_ pr_ ma Z➢ yF CV'' 0>0-1 '0 1-0mN Ao r- A O A Z n < Oln0 <f▪ ri1 ND OC 1190 o D C V '0 N r m Mn mFA In A = oc O. O Z Coii 3. 0 m m Zr y O,mi r AOm m O m O A Ao A S -1 Z m E inr A O 0 O InAW =O m �-1 O O T A O➢ m c -n -0o m-r m -n a m 0 O UNCC UTILITY NOTIFICATION Know what's below. CENTER NOTIR C T1ON 800.922. 1987 Call before you dig. www.uncc.org CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Project Benchmark TBD Northing: — Easting: — Elevation: — Datum Source: UTM83-13F (NAVD 88) SCALE 30 0 15 30 ( IN FEET ) CONTOUR INTERVAL = 1 FOOT ORIGINAL SHEET SIZE: 22 x 34 60 NO. DATE EVI SIONS DESCRIPTION S:\PROJECTS\0087 United Companies\039 Rifle Ready Mix \Design\DWG\03—Base Files\0087-039 Site Map.dwg [Existing Conditions] 1/14/2020 10:41:52 AM BY 4111.11/L: RIVER CITY CONSULTAN 1 Phone: 970.241.4722 Grand Junction, CO 81506 www.rccwest.com Fax: 970.241.8841 744 Horizon Court, Suite 110 PROJECT #: 0087-039 DRAWN BY: CHECKED BY: nmr idg DATE ISSUED: 15.Jan.2020 HORIZ: VERT: 1" = 30'' N/A a UNITED COMPANIES Existing Conditions Exhibit C 1 / if FLOOD PLAIN ELEVATION: 5328.9 / s \ Nco Well \\\ \ \\\ \ \\ \\\ v�vvv v \\\ \ \\ I \\\ \\\\ N. 'N N, \ \\\\ \ \\ N�VAV \ \offA��\ \\\ r\ , \\\\ N , _ Op \ C \ �� \ R \N, \ —_1 —1 Proposed Propane Storage. Final location to be determined by Fire Marshall Feed Conveyor• Buried Water Line \\NN\ J \ \\ \S\\ 100 E_ ——5�330— - - - — _ Existing Concrete Pod \ —T_ - - Aggregate Bin Overhead Power / Line •Utility Pole r FLOOD PLAIN ELEVATION: 5328.9- / Cement Silos Septic Tank — 7 7 /l J1L __--7_' _5332_ _� s \ \ ' n0' O\ \/ / / 7 7 7� 7Q 7 7 \ 7 Epp \ \ 17,--,.. 7 7 7 tF \— 'po \ / \ / / — - — J 7 \ tsr) h -5333 _ -77 001 °o` 00 —5326 _AWL art UNCC UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. bail before you dig. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Project 13enchniark TBD Northing: — Easting: — Elevation: — SCALE 30 0 15 30 CONTOUR INTERVAL = 1 FOOT ORIGINAL SHEET SIZE: 22 x 34 — — - 60 KEVISIONO NO. DATE DESCRIPTION BY S: \PROJECTS \0087 United Companies \039 Rifle Ready Mix\Design \DWG \03-Base Files \0087-039 Site Map.dwg [C2 SITE 8c GRADING PLAN] 1/22/2020 8:51:40 AM \ --- —_--- 7 / /� III I_ — / / i 777. cov• 744 Horizon Court, Suite 110 Grand Junction, CO 81506 www.rccwest.com PROJECT #: 0087-039 DRAWN BY: CHECKED BY: jel idg • RIVER CITY Phone: 970.241.4722 Fax: 970.241.8841 DATE ISSUED: 15.Jan.2020 HORIZ: VERT: 1" = 30' N/A 111,11M NOTES: 1. ToC = Top Of Concrete. Finished Grade, (non —payed) assumed to be minimum of six inches (0.50') below ToC immediately adjacent to building. UNITED COMPANIES Site & Grading Plan C2