HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-11-20-6595 & SEPT -11-20-6596
Katha Rossein & Ron Razzore
New Single -Family Residence and Accessory Structure (Shed)
TBD Sec03, TO7S, R87W — Carbondale
Ranch at Coulter Creek, Lot 11
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) AN OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION TO VERIFY SOILS
BEARING CAPACITY AS FOLLOWS: ALLOWABLE BEARING PRESSURE = 2,000 P.S.F.
4) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS
REQUIRED AT FOUNDATION INSPECTION TO VERIFY ALL STRUCTURES - INCLUDING
ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - ARE IN COMPLIANCE WITH
BUILDING ENVELOPE REQUIREMENTS.
5) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR,
IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH
GARFIELD COUNTY'S 25 -FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE
DEVELOPMENT CODE.
6) ON-SITE WASTEWATER TREATMENT SYSTEM SHALL BE DESIGNED AND INSPECTED BY A
COLORADO LICENSED PROFESSIONAL ENGINEER. PROVIDE ENGINEER'S FINAL REPORT &
APPROVALS FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT PRIOR TO FINAL
BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. DRAINFIELD MUST BE LOCATED
FULLY WITHIN BUILDING ENVELOPE AS PER FINAL PLAT REQUIREMENTS.
7) PRIOR TO FINAL INSPECTION, PROVIDE RADON TESTING IN ACCORDANCE WITH RANCH
AT COULTER CREEK'S FINAL PLAT (NOTE #17) AS FOLLOWS:
"DUE TO THE POSSIBLE PRESENCE OF RADON GAS IN THE AREA, TESTING FOR
RADON GAS SHALL BE DONE WHEN THE RESIDENCE HAS BEEN COMPLETED AND
PRIOR TO ISSUANCE OFA CERTIFICATE OF OCCUPANCY."
8) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.