HomeMy WebLinkAboutCorrespondenceAndy Schwaller
From: Andy Schwaller
Sent: Monday, November 23, 2020 3:25 PM
To: 'affordable'
Cc: Lindsay Krol; Dave Argo
Subject: Gilberto Montanez Silt Co Building Permit
Please verify with the foundation engineer that he designed the foundation for a 40 PSF flat roof snow load P(f) and not
a 40 PSF ground snow P(g) as per Garfield County's published snow load requirements. A sealed letter from the
engineer is required. Please call if you have any questions.
Thanks,
Andy Schwaller
Building Official
Garfield County
1