HomeMy WebLinkAboutARC Approval Letter 07.07.2020Pinyon Peaks
Architectural Control Committee
July 7, 2020
Carla Cstberg
Via Email
Re: ACC Approval for Lot 10, Pinyon Peaks
Carla,
The ACC has reviewed the drawings you submitted for Lot 10 dated 06/10/2019 and
approve them as submitted. This approval does not constitute a building permit. This
must be obtained from Garfield County Building Department.
In general, we ask that you limit tree removal to just that required for construction and to
create and maintain a defensible fire zone around the structure. Exterior lighting should
be kept to an absolute minimum and be non source oriented. Pursuant to the Covenants,
construction is limited to 18 months once begun. Construction access through Pinyon
Peaks should be timed so as to avoid the thaw periods when we see the most road
damage. You will be responsible for any road damage caused by construction so it would
be to your advantage to photo document the roads prior to construction.
Good luck with your new construction and if there is anything 1, or any member of the
ACC can do to help, please do not hesitate to contact us.
Sincerely
--etle://ezer—
Tom Stevens
President, Pinyon Peaks Homeowners Association
Director, Pinyon Peaks Architectural Control Committee