Loading...
HomeMy WebLinkAboutInstallation Report 01.11.2021Huddleston-Berry Engineering & Testing, LLC Garrett Morris 2693 County Road 301 Parachute, Colorado 81635 Subject: OWTS Installation Inspection 2693 County Road 301 Parachute, Colorado 2789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com January 11, 2021 Project#02156-0001 Reference: Geotechnical Investigation and OWTS Design, 2693 County Road 301, Parachute, Colorado by Huddleston-Berry Engineering & Testing, LLC for Mountain Ridge Construction Services, August 25, 2020. Dear Mr. Morris, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at 2693 County Road 301 in Parachute, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as -built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering Cc: Garfield County Building Department ATTACHMENTS r I -Id 04 ,S8Z— REPAIR AREA 9'2' STA 70' NEW RESIDENCE to n 1,000 GAL TANK Scale: 1" = 60' Project # 02156-0001 Date: 01 /11 /21 By: MAB Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 2693 COUNTY ROAD 301 AS -BUILT SITE PLAN