Loading...
HomeMy WebLinkAboutEngineer's Report 12.20.2018e C?otr& Corrsfrr¡cfjorr lac. 1129 -24- Road Grand Junctlon, GO 81505 Grand Junction (970) 245-0577 . Glenwood SpringsiAspen (970) 640-5029 . Montrose/Delta (970) 640-5029 Email: ccig¡@msn.com December 20,2018 TPI Industrial 2471River Road, Unit A Grand Junction, CO 81505 97 0-243 -4642 (wk), 97 0 -242-533 0 (fax) Conceming: erection of steel structure and bolt installation for Divide Road Water Facility - Pump Buildins located in Garfield Countv The erection of the steel structure at the above referenced project was inspected by CCI Engineering on 12-18-18. The structure has been erected in accordance with the structural steel plans and bolt torque specifications furnished by the manufacturer. Please call if you have additional questions concerning this issue. Thank you. Seal Thomas A. Cronk TZan¿.¿. rf . &t r¿ Date lbþ-/8 CC, ENGINEERINc 28322 orutt 4a \ ç s <J \Ê \SA