HomeMy WebLinkAboutEngineer's Report 12.20.2018e C?otr& Corrsfrr¡cfjorr lac.
1129 -24- Road
Grand Junctlon, GO 81505
Grand Junction (970) 245-0577 . Glenwood SpringsiAspen (970) 640-5029 . Montrose/Delta (970) 640-5029
Email: ccig¡@msn.com
December 20,2018
TPI Industrial
2471River Road, Unit A
Grand Junction, CO 81505
97 0-243 -4642 (wk), 97 0 -242-533 0 (fax)
Conceming: erection of steel structure and bolt installation for Divide Road Water Facility -
Pump Buildins located in Garfield Countv
The erection of the steel structure at the above referenced project was inspected by CCI
Engineering on 12-18-18. The structure has been erected in accordance with the structural steel
plans and bolt torque specifications furnished by the manufacturer.
Please call if you have additional questions concerning this issue. Thank you.
Seal Thomas A. Cronk
TZan¿.¿. rf . &t r¿
Date
lbþ-/8
CC, ENGINEERINc
28322
orutt
4a \
ç
s
<J \Ê
\SA