HomeMy WebLinkAboutEngineer's Structural Observation Report 01.22.2018Structural Observation Report Projeet Name: 76 Comanchero 76 Comanchero New Castle, Cö. 8L647 Present Steve Beaulieu - Õwner Landan Anderson, P.Ë. -Anderson Structural Engineering, lnc. {ASf} .. lnspection Date: January 17, 201B Conditions: Sunny, Dry Report Date: January ?2,2018 Project Location: 4a ì.*n' Notes; 1. Rough framing was observed. Ceiling and wall insulation was installed. Framing was generally in accordance with the project specifications. Discrepancies are noted below. 2, Outrigger rafters in the roof were noted to have been connected with {2} 16d toe nails into a 2x ledger, in lieu of the LUS hangers specified an the detail 10/55.2, 2x pressure blocking is applied to the ledger and the outrigger is fastened w¡th {3) 16d to the pressure blocks. The as built condition is acceptable. 3. The installed heade r ât the top of the stair was {2) 2 x 10. Roof framing plan S3".2 specified {3) 2 x 8. The substitution is acceptable. 4. Framìng for the exterior A-frame prow consisted of ? x 6 outlookers framed between a 2x ledger and a 3 x B R.S. rim beam" The 3 x B rim was supported atthe ridge beam with a steel bucket connection. The bucket wäs connected to the ridge wíth {2} %" M.B. and {6} Timberlok srews. The bottom of the 3 x I rim shall be connected to the lower wall with {a}Tirnberlok screws into solid blocking. 5. The {3i 1L118" LVL cantilever beam on the upper lever along grid 1".5 was suppÕrted by a 4 x 10 beam spanning from grid 1. to ?. This is acceptable per previaus correspondence. 823 Grand Avenue, Suite 34û " Glenwood Springs, C0 81601 {97CI} 984-t320 . email: lafr$ar:@*nderson-slructural.csm ng 6. The connection for the {3) !17/B' LVL cantilever beam at grid 4.5 was nated to have {1-} Simpson HTS twist strâp ättäched to the post. A second twist strnp was attached to the perpendicular beam. A side strap consisting of 18 ga. minimum thickness steel plate shail be added to attach the beam to the packout past, {3}%" Simpson SDS screws shall be used at the beam and at the post { 6} total. 7. The exterior entry roof canopy was built with 1X T & G spanning between a 2 x ledger and a 3X truss and knee brace system, The attachment to the wall is by {2) 5lB" lag scrêws into blocking. The as built assembly is acceptable' B. {2} Z x 10 beams were installed aT the deck in lieu of 6 x 8's specified on dwg, S1.1. This is acceptable. The joists were end nailed with {3} 10D and rested cn a 1x ledger with {1} l¿" GRK screws at each joist location. 823 6rand Avenue, Suite 340 ' Glenwood Springs, CO 81601 {970} 9S4-03 20 . em ail : h"$dsn &a n dq rsqÍ}:$trutlural.cafrr.