HomeMy WebLinkAbout4.0 Land Use Change PermitllllltrTË',f-¡LT1$tË,Él{ï¡ hl{l,lt1l¡'1,{lll[¡llï¡t{,¡ì ll ll IRecept ions : 942895
?" !?"'o'932 F3¿?t¿?8r'ü..,F:!, I I å8"èEFr r Er_o couNry co
LAND USE CHANGE PERMIT
A Parcel of Land Owned by Jolley Mesa LLC located approximately 4 miles
west of the Town of New Castle in Section 20, Township 6 South, Range 91
West of the 6th Principal Meridian and legally described in a Quit Claim Deed
Recorded at Reception Number 871838 in the records of the Garfield County
Clerk and Recorder.
A Booster Compressor located on a 0.52-acre site within a 1360.94-acre parcel
known as the Kokopelli Booster Compressoras shown on the Site Plan
Attached as Exhibit "A".
(GAPA-04-20-8785)
COMMU NITY DEVELOPMENT DEPARTMENT
GARFIELD COUNry, COLORADO
Sheryl Bowe AICP
mmunity DevelopmentDirector of
Date
dþr
..tl!
for
(Assessor's Parcel No. 21 81 -1 72-00-086)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code, as amended, and the Director's Decision Letter dated August 21,
2020, the Director of the Community Development Department hereby authorizes the
following activity:
This Administrative Land Use Change Permit is issued subject to the conditions set forth
in the Director's Decision from August21,2020 and set forth in Exhibit "B" and shall be
valid during compliance with such conditions and other applicable provisions of the
Garfield County Land Use and Development Code, as amended, Building Code, and
other regulations of the Board of County Commissioners of Garfield County, Colorado.
Lø h70
***
{þ
_sç1
llll tfrilfi lûfl ffi llll llt' ll, r'lFll,ll JllllFr f,r¡rht Il ll IRecept ion$ : 942695
@9l2el2ø2ø Ø3r5Ø:53 PM Jean Alberico2 of 4 Rec Fee:g@.@Ø Doc Fee:ø.øø ennptEl_O COUNTY CO
Exhibit A (Site Plan)
I
!
Ê{ÉI
å
5
¿
!e
{+
'' ,+
I
F
.d,*
ı
¡t
*
ô
*¡
åå
råt{
ä;ı
x
e
ð
8.
&
¿{
Ið
ÂìI\
g
x
i${
iß t
'åË
E$
,ã
Èä
nütUlå;
$å
[å
þT
EA \\¡
*.--*-\
\
¿
Y
ån
--*gü+¡-
2
7\
qôI !
O
IT(,
m(t
:c1
ãoß¡oc
2
ñtt
?ì
I ÕC
a
I I ôî
*
a
I I I I u ¡r I i lE Hf fJH llrlü llh h j rE I U li lrsf I Iù lLi¡ h hl' I I I I I
Receot ion$ : 942695
çìsl2l?tø¿(i øà'sø,s3 pl'l Jean Éllbericg---. -ä-åi-¿-Rã; Fãåistàlıø ooc-Èeä'ø.øø GnRFIELD couNTY c0
Exh¡b¡t C
(Conditions of Approval, pg. 1 of 2)
1) All representations made by the Applicant in the application shall be conditions of
approval unless specifically altered by these conditions of approval.
2) The Kokopelli Booster Compressor shall be operated in accordance with all
applicable Federal, State, and local regulations governing the operation of this type
of facility.
3) The facility shall maintain compliance with all applicable CDPHE permits, including
but not limited to, SPCC Plans and air quality permits (APEN permit) for the site.
4) The Applicant shall maintain compliance with all required COGCC permits and
forms for the facility.
a) Prior to operation of the facility the Applicant shall supply Garfield County
Community Development with a demonstration that all required COGCC and
CDPHE permits have been issued.
5) The facility shall maintain compliance with COGCC and County Noise Standards
and Regulations. Within 30 days of initiating operation of the booster compressor
the Applicant shall provide on-site noise readings to confirm compliance with the
noise requirements. lf compliance is not confirmed or if future compliance issues
are identified, the Applicant shall provide additional noise mitigation in order to
achieve compliance and may be subject to further noise testing.
6) The facility shall comply with Garfield County lighting requirements in Section 7-
304 including, but not limited to that exterior lighting is downcast and shielded.
7) Prior to the issuance of the certificate of occupancy for the building, the applicant
shall be required to install a Knox Padlock on the access gate, as required by
Colorado River Fire Rescue.
8) The operation of the facility shall comply with industry standards regarding fire
protection, fire detection, and fire extinguishers.
9) The installation and construction of the facility shall meet the following timeframes:
a) The Applicant shall install the facility in compliance with Colorado Parks and
Wildlife recommendations including requirements that construction and
installation of the facility occurs outside the December 1st to April 30th big game
winter period if possible. lf activity does occur within the wintertime period
vehicle traffic shall be restricted from 10am-3pm.
3
llll ll[rl'tll lffTlllt l+hlll
Receot i onË : 942595
'ld':l'^tgzz P 3 ¿?8¿? 8 r' ü. "' F Ë !
ùHll{l lþ¡r¡'it[rtl I' hl ll ll I
,âlBã"èEfirrr.D couNrY co
b) The Applicant shall install the facility according to recommendations provided
within the WestWater Engineering Report dated July 2019. The report
recommends that project construction shall be completed outside of the nesting
season, which is considered May 15 to July 15 for species in this area.
4