Loading...
HomeMy WebLinkAboutGeotechnical Investigation and OWTS Design 04.06.2021Huddleston-Berry lingineeling & 'l'esting, Lf-C Aprll6,202I Project#02239-0001 Keith and Hanna Wittenberg 243 Elk Ridge Drive Glenwood Springs, Colorado 80601 Subject: Geotechnical Investigation & OV/TS Design Parcel 212307200138 New Castle, Colorado Dear Mr. and Mrs. Wittenberg, This letter presents the results of a geotechnical investigation conducted by Huddleston-Berry Engineering & Testing,LLC (HBET) for Parcel 212307200138 in New Castle, Colorado. The site location is shown on Figure 1. The proposed construction is anticipated to consist of a new single farnily residence. The scope of our investigation included evaluating the subsurface conditions at the site to aid in developing foundation recommendations for the proposed construction and to evaluate the site soils for onsite wastewater treatment. Site Conditions At the tirne of the investigation, the site was open and sloping down towards the southeast. Vegetation consisted primarily of weeds, grasses, and small to large trees on the southeast portion of the site. Elk Valley T.ane ran through the site. The site was bordered to the north and south by vacant lots, to the west by open land, to the east by a rural residential property. Subsurface Investigation The subsurface investigation included four test pits as shown on Figure 2. The test pits were excavated to depths of 3.0 to 8.0 feet below the existing ground surface. Typed test pit logs are included in Appendix A. As indicated on the logs, the subsurface conditions at the site consistent. The test pits encountered 0.5 feet of topsoil above tan, r-noist, dense gravels, cobbles, and boulders in a silty sand matrix to the bottoms of the excavations. Groundwater was not encountered in the subsurface at the time of the investigation. Laboratorv Testing Laboratory testing was conducted on samples of the native soils encountered in the test pits. The testing included grain size analysis, Atterberg limits determination, and natural moisture content determination. The laboratory testing results are included in Appendix B. 2789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry. com Parcel 212307200138 #02239-0001 0410612t @*,**,,*?r;r,? The laboratory testing results indicate that the native soils are non-plastic. In general, based upon the Atterberg limits and upon our experience with similar soils in the vicinity of the subject site, the native soils are anticipated to be fairly stable under loading. Foundation mmendafions Based upon the results of the subsurface investigation and nature of the proposed construction, shallow foundations are recommended. Spread footings and monolithic (turndown) structural slabs are both appropriate foundation alternatives. However, in order to provide a stable bearing stratum and limit the potential for excessive differential movements, it is recommended that the foundations be constructed above a minimum of 24-inches of structural fill. The native soils, exclusive of topsoil, are suitable for reuse as structural fill; provided particles in excess of 3-inches in diameter are removed. Imported structural fill should consist of a granular, non-expan siv e, n o nfu sflru|fug. material approved by HB ET. For spread footing foundations, the footing areas may be trenched. However, for monolithic slab foundations, the structural fill should extend across the entire building pad area to a depth of 24- inches below the lowest portion of the foundation. Structural fill should extend laterally beyond the edges of the foundation a distance equal to the thickness of structural fill for both foundation types. Prior to placement of structural fill, it is recommended that the bottorn of the foundation excavation be scarified to a depth of 6 to 9 inches, moisture conditioned, and proofrolled to HBET's satisfaction. Structural fill should be moisture conditioned, placed in maximum 8-inch loose lifts, and compacted to a minimum of 95o/o of the standard Proctor maximum dry density for fine grained soils and 90o/o of the rnodified Proctor maximum dry density for coarse grained soils, within L 2Yo of the optimurn moisture content as determined in accordance with ASTM D698 and D1557, respectively. Structural fill should be extended to within 0.i-feet of the bottom of the foundation. No more than O.l-feet of gravel should be placed below the footings or turndown edge as a leveling course. For structural fill consisting of the native soils or imported granular materials and foundation building pad preparation as recommended, a maximum allowable bearing capacity of 2,000 psf may be used. In addition, a modulus of subgrade reaction of 150 pci may be used for structural fill consistirrg of the native soils and a modulus of 200 pci may be used for approvecl importeci structural fill. Foundations subject to fiost should be at least 36-inches below the finished grade. Any stemwalls or retaining walls should be designed to resist lateral earth pressures. For backfill consisting of the native soils or imported granular, non-free draining, non-expansive material, we recommend that the walls be designed for an active equivalent fluid unit weight of 45 pcf in areas where no surcharge loads are present. An at-rest equivalent fluid unit weight of 65 pcf is recommended for braced walls. Lateral earth pressures should be increased as necessary to reflect any surcharge loading behind the walls. Water soluble sulfates are common to the soils in Westem Colorado. Therefore, at a minimum, Type I-II sulfate resistant cement is recommended for construction at this site. P:\2008 ALL PROJECTS\02239 - Keith Wittenberg\02239-0001 Elk CreekPæcel\200 - Geo\0223g-0001 LR03252l.doc 2 Parcel 212307 2001 38 #02239-0001 04/06121 Non-Structural Floor Slab and Exterior Flatwork Recommendations In order to reduce the potential for excessive differential movements, it is recommended that non-structural floating floor slabs be constructed above a minimum of 18-inches of structural fill with subgrade preparation, structural fîll materials, and fill placement be in accordance with the Foundation Recommendations section of this report. It is recommended that exterior flatwork be constructed above a minimum of l2-inches of structural fill. Drainage Recommendations Grading ønd draìnage are crítícul for the long-term performance of the structure and grading around the structure should be designed to carry precipitation and runoff away from the structure. It is recommended that the finished ground surface drop at least twelve inches within the first ten feet away from the structure. It is also recommended that landscaping within five feet of the structure include primarily desert plants with low water requirements. In addition, it is recommended that irrigation, including drip lines, within ten feet of foundations be minimized. HBET recommends that surface downspout extensions be used which discharge a minimurn of 15 feet frorn the structure or beyond the backfill zones, whichever is greater. However, if subsurface downspout drains are utilized, they should be carefully constructed of solid-wall PVC and should daylight a minimum of 15 feet frorn the structure. In addition, an impermeable membrane is recornmended below subsurface downspout drain lines. Dry wells should not be used. Onsite Wastewater Treatment System Feasibilitv In order to evaluate the site soils for onsite wastewater treatment, percolation testing was conducted at the site in accordance with Garfield County regulations. The percolation rate in the native soils ranged from 4 to 10 minutes-per-inch. The percolation testin g data are included in Appendix C. In accordance with Garfield County regulations, a percolation rate of between 5 to 60 minutes- per-inch is required for soils to be deemed suitable for onsite wastewater treatment. Although one of the tests fell outside this range, the native soils contain an appreciable amount of fines and will provide for excellent filtration of effluent. Therefore, based upon the results of the percolation testing, HBET believes that the native soils are suitable for onsite wastewater treatment. In addition to the percolation rate of the subsurface materials, the seasonal high groundwater elevation is an important factor in detenrilting the suitability of the site for Onsite 'Wastervater Treatment Systems. For OWTS suitability, the seasonal high groundwater elevation should be at least four feet below the bottom of the proposed absorption bed. As discussed previously, groundwater was not encountcrcd at thc timc of thc invcstigation. In general, based upon the results of the subsurface investigations, HBET believes that the seasonal high groundwater level is deeper than 8.0 feet below the existing grade at this site. Huddleston-Bcrry trsir.dûÉå ¡'r{1,4, l-l( JP:\2008 ALL PROJECTS\02239 - Keith Wittenberg\02239-0001 Elk Creek Parcel\2O0 - Geo\02239-0001LR032521.doc Parcel 212307 200 I 3 8 #02239-0001 04106121 lAW Huddleston-Bcrrt tr!ìÈcri!Í lr{Ì¡!, l-t C Seepøge Bed Design The design of the absorption system generally follows the requirements of the Garfield County On-Site Wastewater Treatment System Regulations, effective June 2018. The proposed construction at the site is anticipated to include a three-bedroom home. Based upon the soil percolation rate, a Long-Term Acceptance Rate (LTAR) of 0.6 will be utilized for the absorption field design. Infiltrator Systems Quick4 Standard Chambers are proposed. The daily flow of the sewage disposal system is calculated below and a plan and profile of the absorption system are shown on Figure 3. Average Daily Flow: (6 persons)(75 GPD/person) :450 GPD Soil Treatment Area : (450 GPD / 0.60) :750 Square Feet Adjusted Soil Treatment Area: (750 SFXl.0X0.7) :630 Square Feet # of Quick4 Chambers : (630 I 12¡:53 Chambers; Use 56 Chambers System Installøtion The installation of the septic tank, pump, plurnbing lines, Infiltrators, etc. should be completed in accordance with Garfield County and Infiltrator Systems, Inc. specifications. In addition, the following construction procedures are recommended : ' The septic tank and distribution box should be placed level over native soils that have been scarified to a depth of 8 to 12 inches, moisture conditioned, and recornpacted to a minimum of 95Yo of the standard Proctor maximum dry density, within *2Yo of optirnum moisture content. However, up to 3-inches of washed rock or pipe bedding passing the 1-inch sieve may be used as a leveling course under the septic tank and/or distribution box.. The bottoms of trenches and backfill around the septic tank and distribution box which will support sewer or effluent lines should be cornpacted to at least 90 percent of the standard Proctor maximum dry density, within +2o/o of optimum moisture content. Pipe bedding should have a maximum particle size of 1-inch.. Vehicular or heavy equiprnent traffic and placernent of structures should not encroach within 10 feet of the septic tank or distribution box. Inspection Sch.edul.e Huddleston-Berry Engineering & Testing LLC should be retained to monitor the construction of tlie OWTS. The following schedule of observation and/or testing should be followed: Observe the absorption bed excavation prior to placement of replacement soil and Infiltrator chambers. ' Observe placement of the septic tank and all connecting sewer and effluent lines prior to backfill. Veriff proper fall between inverts. ' Observe and veriff installation of the absorption bed prior to placement of cover and backfill.. Observe squirt test to veriff even distribution of effluent from pump. 4P:\2008 ALL PROJECTS\02239 - Keith Wittenberg\02239-0001 Elk Creek Parcel\200 - Geo\02239-0001 LR03252l.doc Parcel 212307200 I 38 #02239-0001 04106121 @*,***,*?r;*ir In conformance with Garfield County regulations, HBET will be required to provide the Garfield County Health Department with documentation certifying that the OWTS was placed in conformance to the plan and profile and Garfield County regulations. General Notes The recommendations included above are based upon the results of the subsurface investigation and on our local experience. These conclusions and recommendations are valid only for the proposed construction. As discussed previously, the subsurface conditions encountered in the test pits were consistent. However, the precise nature and extent of any subsurface variability may not become evident until construction. As a result, it is recommended that HBET provide construction materials testing and engineering oversight during the entire construction process. It ís importønt to note that the recommendstions herein øre intended to reduce the risk of structural movement and/or dømøgq to vørving degrees, associøtecl witlt anv volume cltønge of the nstive soils. Howeven HBET cannot predict long-term chønges in subsurface moisture conditions and/or the precise masnitude or extent of volume cltange in the nøtive soils. Wltere signifìcønt increases in subsurface moisture occur due to noor grading, improper stormwater munagement, utilitv line føilure, excess irrigøtion. or other cøuse, either during conslruction or tlrc result of actions of the propertv owneh severøl incltes of movemenl øre possible. In addition, anv f¡tilure lo complv with the recommendations in this report releases Huddleston- Betv Engineering & Testing, LLC of snv liøbilitv with regard to tlte struclure nerformønce. We are pleased to be of service to your project. Please contact us if you have any questions or comments regarding the contents of this report. Respectfully Subrnitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering 5P:\2008 ALL PROJECTS\02239 - Keith Wittenberg\02239-0001 Elk Creek Parcel200 - Geo\02239-0001LR032521.doc F'IGURES ffi qPuhlic.nêt'" Garfield County, CO Overview Legend j Parcels Roads Parcel/Account Numbers Highways - Limited Access ..- Highway Major Road Local Road Minor Road Other Road Ramp Ferry Pedestrian Way Owner Name Lakes & Rivers , , Citiut - County Boundary Line Location FIGURE 1 te Location Ma D ate cr eaTe d: 3/ 25 /2027 Last Data Uploaded: 3/25/2O2I 2:I3:O4 Alvt D e v e ro pe d o' C) Fçå,g,Bidçl EWWATER LINE IIIIIIIII//////^lrP.3 I#//\- -//IIREPAIRAREA--lIDRAINAGE\,,,MINIMUM 1,OOOGALLON TANKNEW HOMEf--/IGENTL--J\iIIIIIIIIIIIt\\\\-\\\STAø/Æ\.-NOTE: Ic0NsTtFACTOFBED WIt SCALERISERS (AS NECESSARY)THAT LIDS ARE AT BRFINISHED GRADEEST. A.O FT4.0 FT MAX.INFILTRATER OUICK4STANDARD CHAMBERSIALIZED BED PROFILE)TIC TANKNET TT]SCALELINCHED, GEOTEXTILEABOVE CHAMBERSLCH,IIMUM SETBACKS(UNITS = FT)1,0 FT MTN, COVERD]STRIBUTIEN BTXCOVER SOIL; NATIVE SOILS OR OTHER SUITABLETOPSOL. GRADE TO CARRY SI.IRFACE WATERAWAY FROM BED..4qNI)10PROPERTY LINEUNOCCUPIEDBUILDINCDVELLINGLAKE, STREAM,UNLINED DITCHFLOODEI)FIELDSLINED IIITCHl0t0505510V/ATER LINE -\_\Æ*NEWHOMEINSPECTIONPORTSINFILTRATOR SYSTEMS QUICK4STANDARD CHAMBERS20'IN5',MINDISTRIBUTION B(ENSURES EVEN DOF EFFLUENTSEPTIC TANK WITHMINIMUM I,OOOGALLON CAPACITY4-INCH DIAMETER SEWEREFFLUENT PIPE MEETINC,DI785, SCHEDULE 40 OR SI APPENDIX A Typed Test Pit Logs N q Fo ct @f Ø:f Fz o ùott'-1lUÈoú.o YUu É. YJt¡l Huddleston-Beny Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-800s TEST PIT NUMBER TP.1 PAGE 1 OF 1 CLIENT Keith and Hanna Wittenberq PROJECT NAME Elk Creek Property PROJECT NUMBER 02239-OOO1 PROJECT LOCATION New Castle co DATE STARTEÐ 3112121 COMPLETED 3112121 GROUND ELEVATION TEST PIT SIZE EXCAVATION CONTRACTOR Hi-River GROUNDWATER LEVELS: AT TIME OF EXCAVATION AT END OF EXCAVATION AFTER EXCAVATION --- EXCAVATIONMETHOD Trackh/Backhoe dry LOGGED BY NOTES SD CHECKED BY MAB dry T t--- ^o.Ë o oo o +EÉ.-o MATERIAL DESCRIPTION IUÈ>É.¡- uJ,r, tfl =>O-l =z U> s t-uq>9tlÉı- H øî>Fl ^zJãasoz z uJùr-Cir l4 Oo o_ F- =L =ëÉ.Õ Lll o-É.:-l1- 'ØP -rOz>oO ATTERBERG LIMITS FzulFzOG.o9 U)tllztr oF f=a¿ J- O trF- 3= F 0ñ 6e 1= fL Sandy Clay with Organics (TOPSOIL) GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (SM), tan, moist, loos **Lab Classified GB-1 NYrv GB 1 7 NP NP NP 42 Bottom of test pit at 8.0 feet. 02239-OOO1 ELK CREEK PROPERTY,GPJ GINT US LAB.GDT 3/25121!vo(-111o-tz=ornvo¡\)N)(¡)(oooootrmz{^o=f0)o-T0t3f0)ãofuoã\O ^ l..J rrrl.)á:Èq=!.Øæ5 0 0a9a ?bo aw50@O o"(æ-<oaG<=3.oqR"É¡o'Eat.-Õ!7omot-oo-{ızzoáo0)I-ooo!7omoz=mmxooox!ôo={lnØ{!=zcT[D>miÅn-+9T.NzomØFltloxG)oR?o1eã-zØ=om-{-ogmxoÞızooz{7oonIî'n='o0-{mU'Þnmc'(,NN)o-moxmo(!=@-tl\)c)-5TD0)ox5oooo=!t-El-{mo(¡)N)t\)o1o#Ë*;ãH9[iıä*-2Íá-.r9ıtzzoÃoCzctmt-lll-{ızao-:man-l!-{LNmDEPTH(ft)GRAPHICLOG+mvtrÐmU)o7tl-tozSAMPLE TYPENUMBERRECOVERY %(ROD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIÏ WT(pcr)MOISTUREcoNTENT (o/o)-l- --{=ms¡-l@ø)mÐFINES CONTENT("/")LIQUIDLIMITPLASTICLIMITPLASTICITYINDEX:.¡(¡r\-..j--..t-¡:.'-.J\ ,t/rU)0)fo0.)É.Jo(o0)ı'Ø-lo!(r)Irøv)=n:¿$m'-ØJ-oOØOr@Ã- tE3in9)0)fTDoct-om7Øf0)LØzo3g)=.x(Doo3ooøE.0)90ooo Huddleston-Beny Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 TEST PIT NUMBER TP-3 PAGE 1 OF 1 PROJECT NAME Elk Creek Propertv PROJECT NUMBER 02239.0001 PROJECT LOCATION New Castle. CO CLIENT Keith and Hanna Wittenberq GROUND WATER LEVELS: AT TIME OF EXCAVATION AT END OF EXCAVATION AFTER EXCAVATION --- TEST PIT SIZE drv Trackh/Backhoe drv CHECKED BY MAB GROUND ELEVATION NOTES COMPLETED 311212'IDATE STARTED 3112121 EXCAVATION CONTRACTOR Hi-River EXCAVATION METHOD LOGGED BY SD ATTERBERG LIMITS IFÀruo o () äEÉ.-o MATERIAL DESCRIPTION TIJù>É.F I.¡J 3ËO-r>= U) s É.- 9ägs uJ É. u)u>Fl ^zr.Yatooz z TUù l-ôwp OofL F =F^zo to trl o\ú- lD Floz>oO ô,--f=ø' J- OtrF 3= FñxYm 69<=J o_ Fz LUt-zOG() e.) Ø u.lztr !.2.'.! I j-2 !1!,i'.lt Sandy Clay with Organics (TOPSOIL) 2 GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (sm), tan, moist, loos Bottom of test p¡t at 3.0 feet. N N l-oq m J U)l Fz(, 0q ts tf.UÈo É.È YUU É.o ì¿Jl! oooooNNo U)z =lJoo¡ Ê0 Huddleston-Berry Engineering & Testing LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 PROJECT NAME Elk Creek Propertv PROJECT NUMBER 02239-OOO1 PROJECT LOCATION New Castle, CO CLIENT Keith and Hanna Wittenberq TEST PIT NUMBER TP-4 PAGE I OF 1 COMPLETED 3112121 TEST PIT SIZE CHECKEDBY MAB EXCAVATION CONTRACTOR Hi-River EXCAVATION METHOD Trackh/Backhoe GROUND ELEVATION AT END OF EXCAVATION dry AFTER EXCAVATION --- LOGGED BY SD NOTES DATE STARTED 3112121 GROUND WATER LEVELS: AT TIME OF EXCAVATION drv ATTERBERG LIMITS 0 IF^fLË o O äqÉ.-(t MATERIAL DESCRIPTION t"rJ o->ÉFUJ!g(Lr>= U) s üa g 0r* u øû>F-l Yr<ıo>oz ztrj ILr-âir l2 Oo o_ F.IF^za) É.o tll o\ú-l1-L4t!ro2>o() o, f=o= J- OFF 3= Fsı 69f= o- Fz uJt-zOGo9) U)ulz LL { '"" '! ?. j.l :!1..! Sandy Clay with Organics (TOPSOIL) 1 GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (sm), tan, moist, loos Bottom of test pit at 3.0 feet. q N l-o dif U)l Fzo Èq tstUIo É.I YU tr.l É.o To !oU|-ot¡lo APPENDIX B Laboratory Testing Results Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-255-8005 ATTERBERG LIMITS' RESULTS CLIENT Keith and Hanna Wittenberq PROJECT NAME Elk Creek Propertv PROJECT NUMBER 02239-OOO1 PROJECT LOCATION New Castle. CO P L S T I c I T I N D E X 50 40 30 20 10 CL.ML @ 20 40 60 LIQUID LIMIT BO 100 Specimen ldentification LL PL PI #200 Classification o TP.1, GB-1 3t12 NP NP NP 42 SILTY SAND w¡th GRAVEL(SM) s N t--z cq ts É.uÈo É.À Yt¡lu É.() YJl¡l oooô NNo tt> E Io É. t¡J6e.tu F N q ¡-oqo 5 U)f Fzo Èq F É.Uco É. Yt¡lu É.(J UN U)zÍo Huddleston-Berry Engineering & Testing, LLC 2789 Riverside Parkway Grand Junction, CO 81501 970-25s-800s GRAIN SIZE DISTRIBUTION CLIENT Keith ancl Hanna Wiltenbero PROJECT NAME Elk Creek Property PROJECTNUMBER 02239-OOO1 PROJECT LOCATION New Castle, CO U.S. SIEVË OPENING IN INCHES I U.S. SIEVE NUMBERS3 4 6 810 1416 20 30 40 5060 100 HYDROMETER6 4 3 21.5 3t4 1t23t8 '100 oà 90 B5 BO 75 70 t--II tu =m É. tIJztr f-zt! C) É.uj o- 65 60 Ãà 50 45 40 35 30 )q 20 l5 10 5 0 100 10 1 GRAIN SIZE IN MILLIMETERS 0.1 001 0.001 COBBLES GRAVEL SAND SILT OR CLAYcoarsefinecoarsemediumfine I T-ì:\I j \ I \ \I \\ \il :l Specimen ldentification Classification LL PL PI Cc Cu o TP.1, GB.1 3112 SILTY SAND w¡th GRAVEL(SM)NP NP NP Specimen ldentification D100 D60 D30 D10 %Gravel %Sand %sitt o/oClay o TP.î, GB.1 3112 25 0.242 18.4 40.1 41.5 APPENDIX C Percolation Testing Results PERCOLATION TESTING Project Name Parcel 212307200138 Location: New Castle CO Testing Conducted By: S. Dinterman Supervising Engineer:M. Berry ; Width Depth 8.0 ÍtPit Dimensions: Le Water Level Depth: SOIL PROFILE De Descri n Test Number: 3ft::-l-tn. 12-in Time (min.) Water Depth (in.) Change (in.) 0 1.125 5 4.5 3.375 10 6.5 2 15 8 1.5 20 8.5 0.5 25 I 0.5 30 9.25 0.25 35 10 0.75 40 Drv 7Rate (min/in): Not Encountered X Top of Hole Depth Diameter of Hole: Depth of Hole: Test Number Top of Hole Depth Diameter of Hole: 6ft 5-rn Remarks Test Number: Top of Hole Depth Diameter of Hole: Depth of Hole: 2 Depth of Hole 13-in roject No. est Pit No. Date: 311212021 TP-2 39-0001 0-1 fr Clavey Sand with Orqanics (TOPSOIL) 1-8 ft GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (sm), tan, moist, loose Time (min.) Water Depth (in.) Change (in.) 0 0.75 5 2.25 1.5 10 4 1.75 15 5.375 1.375 20 6.625 1.25 25 7.5 0.875 30 8.25 0.75 35 9.25 1 40 10.125 0.875 45 10.75 o.625 50 11.25 0.5 55 11.75 0.5 60 Drv 10 Time (min.) Water Depth (in.) Change (in.) Average Percolation Rate (min/in) Rate (min/in):Rate (min/in): Project Name:Parcel 212307200138 Testing Conducted By: S. Dinterman Pit Dimensions: Length Water Level Depth SOIL PROFILE PERCOLATION TESTING Not Encountered X Test Number Top of Hole Depth: Diameter of Hole: Depth of Hole: Location: New Castle, CO Supervising Engineer: M. Berry ; Width Depth 3.0 ft Test Number: Top of Hole Depth: Diameter of Hole: 5-in. Depth of Hole: 1B-m. Time (min.) Water Depth (in.) Change (in.) 0 1 5 3.625 2.625 10 6.75 3.125 15 9.125 2.375 20 11.125 2 25 12.75 1.625 30 14 1.25 35 15 1 40 1ô 1 45 17 1 50 Dry 5Rate (min/in): 1 Remarks Test Number: Top of Hole Depth Diameter of Hole: Depth of Hole: ect No. 02239-0 ale: 311212021 Proj Pit No TP-2 0-1 ft Clavev Sand with Oroanics (TOPSOIL) 1-3 ft GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (sm), tan, moist, loose Time (min.) Water Depth (in.) Change (in.) Time (min.) Water Depth (in.) Change (in.) Average Percolation Rate (min/in) Rate (min/in)Rate (min/in): Project Name Parcel 212307200138 Testing Conducted By:S. Dinterman Pit Dimensions: Len Water Level Depth: SOIL PROFILE Depth Description Diameter of Hole: Depth of Hole: 7-in 15-in Time (min.) Water Depth (in.) Change (in.) 0 0.5 5 5 4.5 10 8.5 3.5 15 10.25 1.75 20 11.75 1.5 25 13 1.25 30 Dry 4.Rate (min/in) PERCOLATION TESTING Not Encountered X Top of Hole Depth Diameter of Hole: Depth of Hole: Location: New Castle co Supervising Engineer:M. Berry ; Width Depth 3.0 ft 0-1 ft Clavev Sand with Orqanics (TOPSOIL) 1-3 fr GRAVELS, COBBLES, and BOULDERS in a Silty SAND matrix (sm), tan, moist, loose Test Number:I Test Number:Test Number: Top of Hole Depth: 3 ft Remarks Top of Hole Depth Diameter of Hole: Depth of Hole: 02239-000No est Pit No 1P-4 311212021 Time (min.) Water Depth (in.) Change (in.) Time (min.) Water Depth (in ) Change (in.) Average Percolation Rate (min/in) Rate (min/in)Rate (min/in):