HomeMy WebLinkAboutPermitGarfield Coufity
Public Health
Garfield County Public Health
2014 Blake Ave.
Glenwood Springs, CO 81601
Phone: (970) 945-6614 ext. 8150
Permit Number SEPT-6784 (Building B)
OWTS PERMIT
KEEP AVAILABLE AT PROJECT SITE
Permit Type X New X Repair X Remodiel/addition X Tank only
Issue Date 04/29/2021 Expiration Date 04/29/2022
For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable.
Project Address: 0062 County Road 113, Carbondale CO 81623 Parcel No.: 2393-181-00-359
Owner Name: CCC-B LLLP
Designed By: Zancanella and Associates Inc.
Contractor: Rudd Construction
Minimum Tank Capacity 1,000-gallon
Permit Conditions:
Owner Phone: 970 309-0123
Designer Phone: (970) 945-1253
Designer Phone: (970) 309-0123
This OWTS Permit is approved on the condition of compliance with the application and design
documents as submitted via email by Zancanella and Associates, Inc. dated April 27, 2021. Changes
must be approved by Garfield County Public Health and the designer prior to construction.
The OWTS will serve a 13,600 ftz warehouse commercial building, with a toilet and sink in each unit.
The system will utilize a new 1,000-gallon septic tank, as well as connection to the existing OWTS on
the lower portion of the site to the east. The engineer has demonstrated that the existing OWTS is
capable of handling the increased volume from Building B. Maintain all setbacks and elevations as
designed.
Contact the designer and Garfield County Public Health at feast 48 huurs prior to requesting final
inspection of the installed system prior to backfrll.
Agreement
All installations must comply with all requirements of the Garfield County OWTS regulations
including but not limited to the conditions specified above.
In consideration of the issuance of the permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location, construction and erection of the proposed
OWTS and associated structures for which this permit is granted. The applicant further agrees
that if the above said regulations are not fully complied with in the zoning, location, erection
and construction of the above described OWTS and structure, the permit may then be revoked
by notice from the Health Department and immediately become null and void.
The issuance of a permit and specifications of terms and conditions therein will not constitute
assumption of liability, nor create presumption that the local public health agency or its
employees may be liable for the failure or malfunctioning of any system. Permit issuance will
not constitute a certification that the system, the equipment used in the system, or any
component used for system operation will ensure continuous compliance with the provision of
the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.
Permit Approval
Plans and specifications for the proposed OWTS have been reviewed and are considered
satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated
in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from
the date of issuance unless construction on the system has commenced. An "as -built" drawing
must be submitted and inspection of the system must be completed by GCPH before final
approval of the system will be issued.
04/29/2021
Issued By: Garfield County Environmental Health
Department
Date