Loading...
HomeMy WebLinkAboutWell PermitOFFICE OF THE STATE ENGINEER COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 (303) 866-3581 Form No. GWS-25 1095 WELL PERMIT NUMBER ___________________-_______-____303451 DIV. 5 WD 45 DES. BASIN MDAPPLICANT MATTHEW M & SYLVIA M RINGER 7225 COUNTY ROAD 312 NEW CASTLE, CO 81647- APPROVED WELL LOCATION GARFIELD COUNTY SW 1/4 NW 1/4 Section 32 Township 6 S Range 90 W Sixth P.M. DISTANCES FROM SECTION LINES Ft. from Section Line Ft. from Section Line UTM COORDINATES (Meters,Zone:13,NAD83) Easting: Northing:PERMIT TO CONSTRUCT A WELL ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2, unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved pursuant to CRS 37-92-602(3)(b)(II)(A) as the only well on a tract of land of 40 acres described as the SW 1/4 of the NW 1/4, Sec. 32, Twp. 6 South, Rng. 90 West, 6th P.M., Garfield County. 4) The use of ground water from this well is limited to fire protection, ordinary household purposes inside not more than three (3) single family dwellings, the watering of poultry, domestic animals and livestock on a farm or ranch and the irrigation of not more than one (1) acre of home gardens and lawns. 5) The pumping rate of this well shall not exceed 15 GPM. 6) The return flow from the use of this well must be through an individual waste water disposal system of the non-evaporative type where the water is returned to the same stream system in which the well is located. 7) Pursuant to Rule 6.2.3 of the Water Well Construction Rules, the well construction contractor shall submit the as-built well location on work reports required by Rule 17.1 within 60 days of completion of the well. The measured location must be accurate to 200 feet of the actual location. The location information must include a GPS location (UTM coordinates) pursuant to the Division of Water Resources' guidelines. NOTE: Permit nos. 158787 (abandoned), 90492-VE and 158787-A were previously issued for this parcel when the tract of land totaled 280 acres. NOTE: Parcel Identification Number (PIN): 23-2183-322-00-011 NOTE: Assessor Tax Schedule Number: R017214 (totaling 242.075 acres) APPROVED DMW __________________________________________ ________________________________ Receipt No.9504168 DATE ISSUED 11-02-2016 EXPIRATION DATE 11-02-2018 State Engineer By Dick Wolfe by