Loading...
HomeMy WebLinkAboutFinal Framing Observations 02.17.2021ilw{}Lwil Re: February 17,2O2L Don and Dee Moore 25 Buckskin Circle New Castle, Colorado 81647 Final Framing Observation 255 Maroon Driue, Glenwood Sprinp - Garfield County, Colorado ESD Project No. 20.047C Dear Mr. and Mrs. Moore We have observed the condition of the installed framing at 255 Maroon Drive, Glenwood Springs, Colorado, in accordance with our Structurat Engineering Services Agreement dated April L0, 2020. Our observation was made on February L5,2O2L;we were accompanied by Hector Arias during our visit. Our review was based upon the Revision 1 construction drawings sealed by our office on September 8,2020, as well as all Structural Plan Addendum (SPA) and Structural Detail Addendum (SDA) sheets issued thereafter. The timber entry truss was completed, and the deck in the rear of the building had been revised to a concrete patio slab on grade since our previous visit, so a framing observation is not expected for that area. Many of the work items to be performed as outlined in our observation report dated December 18, 2020, had been completed with exceptions noted below. The stone facades at the bases of the front entry truss posts were installed; thus, the post bases were not exposed to view and could not be observed. Mr. Arias testified that the post bases had been installed per sheet SDA-08. lt is our professional opinion that the observed structure was in general conformance with the structural construction documents with the following exceptions. L. A35 clips missing (Photo 1) - 435 clips at the lower roof bearing (Master Bedroom roof) as shown in detail 5/56.003 (reference SDA-0L) were not yet installed. 2. Roof sheathing not attached (Photo 2) - During our previous framing observation, the roof sheathing for the Living Room roof where the roof rafters bear on grid E between grids 1 and 4 on sheet 52.003 was not attached to the blocking as shown in detail 5/56.003 (reference our framing observation report dated December 18, 2020). This is an important connection as it provides the load path for lateral loads from the Living Room roof to the SW4 to the north on the same sheet. Additional blocking was installed as specified in our previous report, but the nailing of the sheathing to the blocking as shown in Photo 2 still needs to be installed to complete the load path. 3. Shear wall sheathing not installed - The plywood SW4 sheathing had not yet been installed on the inside face of the shear wall shown on sheet 52.003 along grid E between grids 4 and 6. The plywood on the outside face of the shear wall was installed; this shear wall requires sheathing on both faces. Should you have any questions regarding our observations, please do not hesitate to contact us. Sincerely, Evolve Structural Design Brian Rossíter Senior Project Manager s2868 LI L