HomeMy WebLinkAboutApplicationGurfteld County
GRADING PERMIT
APPLICATIONCommunity Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
19701945-82t2
www.ga rf ie ld-cou ntv.com
TYPE OF GRADING
ø MAJoR tr MINOR
INVOTVED PARTIES
Sherman Muller & Janice James clo MDC Below
Property Owner:Phone:
Mailing Address
EmailAddress:
230 Overlook Rd Carbondale, CO 81623
c/o Mata Design Co. Below
L A. Sedgwick, lnc 970 948-1 890
Contractor:Phone:
Mailing Address
EmailAddress:
P.O. Box. 10251 Aspen, CO 81612
beniasedgwick @yahoo.com
. Mata Design CoArchitect:Martin Mata 970 274-6011
Phone:
Mailing Address:P.O. Box 189 Carbondale, CO 81623
Email Address: matadesign@mac'com
High COuntry Engineering Phone: (970 )
v45-öO/O
Engineer:
Mailing Address:1517 Blake Ave. GWS 81601
Emait Address: mikeg@hceng'com
PROJECT NAME AND TOCATION
Project Name James-Muller Residence
Describe Work:New Drveway-New Home- New OWTS
Job Address:184 Clipper Place Carbondale, CO 81623
Assessor's Parcel Number:
sub. Stirling Ranch
239 129 105 024
24Lot _Block
Earthwork (squa re feet):38,183 sf Earthwork (Cubic Yards):1526 cy net cut
8
ALL UTILIT¡ES MUST BE LOCATED PRIOR TO ANY GRADING
NOTICE
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or
anauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe
Owner, must be provided with this Application.
Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Voíd Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, ifthe location, construction or use ofthe structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (L)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constituteanacceptanceof responsibilityorliabilitybytheCountyoferrors,omissionsordiscrepancies. Asthe
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read and understand the Not¡ce and Certification above as well as
required information which is correct and accurate to the best of my knowledge.Saoì*e S^ta
(:)
Property Owner Print and Sign Date
OFFICIAL USE ONIY ?d 100.o o1lcco
Ð'*oto¿'S ,1 ,sX f6'7aPt*g
¡1 rÚtEû)
Special Conditions:
vtwÐtre1Þ T
qLTGzoo
Permit Fee:
S too.9ê
Misc Fees:Total Fees:itoo.rP Fees Paid
4 too,u'
Balance due:f.d Grading Permit:
GRAÞ - 69lA
lssue Date:u=zlçt Zoning:
Pu¡>
BUILDING / PLANNING DIVISION
I {
I Date
1-2\-LO 4
I