HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PERMIT
B LRE-06-21-6933
Abel Esteban Gomez
New Steel Building proposed for use as Agricultural
building and shop for the ranch properly
TBD CR 214, New Castle
CCP Subdivision, Lot 2, S.05, T.0ó, R.91
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE
(l.R.c.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C,C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNc AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT.
5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY 3.OOO
PsF SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR
BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION.
ó) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REOUIRES SPECIAL
INSPECTOR, PROVIDE APPROVAL REPORT AT FRAMING INSPECTION.
7) FTELD VERIFY MAN-DOOR FOR EGRESS FROM THE AG / SHOP BUILDING AS
SHOWN ON GABLE STEEL DRAWING E4.
8) OWNER CONFIRMS THIS WILL BE A HEATED STRUCTURE, FIELD VERIFY ALL
ROUGHED IN GAS PIPING, HEATING, MECHANICAL EOUIPMENT AND/OR
PROPOSED INSULATION AT FRAME INSPECTION.