Loading...
HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PERMIT B LRE-06-21-6933 Abel Esteban Gomez New Steel Building proposed for use as Agricultural building and shop for the ranch properly TBD CR 214, New Castle CCP Subdivision, Lot 2, S.05, T.0ó, R.91 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (l.R.c.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C,C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNc AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY 3.OOO PsF SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. ó) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REOUIRES SPECIAL INSPECTOR, PROVIDE APPROVAL REPORT AT FRAMING INSPECTION. 7) FTELD VERIFY MAN-DOOR FOR EGRESS FROM THE AG / SHOP BUILDING AS SHOWN ON GABLE STEEL DRAWING E4. 8) OWNER CONFIRMS THIS WILL BE A HEATED STRUCTURE, FIELD VERIFY ALL ROUGHED IN GAS PIPING, HEATING, MECHANICAL EOUIPMENT AND/OR PROPOSED INSULATION AT FRAME INSPECTION.