Loading...
HomeMy WebLinkAboutApplicationGørfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (97Ols4s-82l'2 www.ga rfield-countv.com BUILDING PERMIT APPLICATION TYPE OF CONSTRUCTION Commercial/M u lti-Family Demolition Manufactured Home (Single or Multi-Level) I Residential (SF, Duplex or Townhome)Reroof Accessorv Dwelling Unit (ADU)- MAXIMUM SIZE OF 1,000 SQUARE FEET INVOLVED PART¡ES I ,¿itl-¡ "Ø'^ z>9dProperty Owner: Mailing Address: Email Address: Ph Contractor: Mailing Address Email Address: Arch¡tect: Phone: (-)- Mailing Address: Email Address: Engineer:Phone:I ) Mailing Address: Email Address: Manufactured Home lnstaller:Phone: Mailing Address: Email Address û Describe Job Address: Assessor's Parcel Number: Sub. 231 ziloTè Lot Block 0,d-{-Propertysize (sq. Ft. orAcres): 3, ) fu,frf Þowner'sVafuation of Work: 5- )f/4 Sq. Ft. of Building: / 2 f û HeiBht:[7'#ofF Class of Work:X New Remodel/Alteration X Addition Garage Attached x Detached PROJECT DETAITS Garfield County BUILDING DEPARTMENT 708 E¡ghth Street, Su¡te 407, Glenwood Springs, CO 87601 Tel: (970) 945-8272 PLAN R EVIE W CHECK LIST Permit No:bt4,K 7D/8 Building lssues Planning/Zoning lssues Engineered Foundation fuWPriveway Permit -/ Sffitsd Site plan N'4. SePtic Permit and Setbacks 0'(' Grade/ TopograPhY 3o% Subdivision Plat Notes A/,/ Fire Department Review Valuation Determinat ion/ Fees Red ne Plans/ StamPs/ Sticker Attach nditions Appl tion Signed an Reviewer to Sign APPlication Parcel/ Schedule No Attach Residential Plan Review List ,v,/,Road lmpact Fees Ø, r( /'/',4 ' Kt,l, o ,ß Property Line Setbacks 30 ft. Stream Setbacks Flood Plain Building Height Zoning Sign-Off ,4,e/Topography 40% //Planning lssues Subdivision Plat DescríBt ion & Summarv: Gp. /Zso /" 3z ?40# Snowload Letter - Manu. Homes Soils Reportfl,1 PROJECf DETAITS CONTINUED Septic:Community Permit #: NOTICE Authoriw. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. lesal Access. ABuildingPermitcannotbeissuedwithoutproofof legal andadequateaccesstothepropertyfor purposes of inspections by the Building Division. Other Permits, Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permÌssion to the Building Division to enter the property, described above, to inspect the work' I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer eer or builder I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. fn,l- Property Owner Print and Sign Date ll' Electric OtherNatural Gas PropaneType of Heat: ptDriveway Permit: oFFrcrAr usE oNLY ?¿ { 3qô .zz cc €/è{ftszt éb'Þ Special Conditions: Adiusted Valuation:9A 4OO Plan Gheck Fee: 416,?-L Permit Fee:532 b5 Manu. Home Fee ñ/A Misc. Fees: '"äTB, 97 Fees Paid: 4 3{¿.¿z Balance Due: -5 ıL,6 S BP No: BLÊ€- ?ol g OWTS No: -x/ASetbacks:OCC Group:tne Const. Type: r¿q Zonine: Ë.u Ê,{ u F{TZstl Date BUITDING / PLANNING DIVISION Signed Approval Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (FinaliCO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. 'Tae> Property Owner Print and Sign Date a a