Loading...
HomeMy WebLinkAboutSubsoil Studyff** f, ää#åiff åiffi#åi;'Tf;ä.** I È t !l ãnn Þnv,rnnnên;ar Seionitcrç 5020 County Road 154 Glenwnod Snlinss- CO,ì I 60 I pilOilc: (v/u, .t+)- t>öó fax: (970) 945-8454 email : kaglenwood@kumarusa.com wrvw.k-umanrra,Ç0 ¡n.& * Ëm*lnr¡¿¿ lt'lurns¿d lñaø.næx:¡ñrt b!ar|JrvIvç vwatFv vv¡¡rlru¡¡r Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, antl Summit Courty, Colorado ,^.ir;';l 1 2. ?|?i Dave Cardiff Construction, Inc. Attn: Dave Cardiff 506 Mesa Verde Carhonrlale Colorado Rl ffi 7 dayç{ra¡jiiffq:qûstrtirçtisn(A,sieail.çq&1 Pr"ojectÌrln ?'l -7 -) 54 Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot20, Ranch at Coulter Creek, Saddle Circle, Garfield County, Colorado Dear Dave: As requested, Kumar & Associates, Inc. performed a subsoil study for clesign of foundations at thq 91¡þ!¡ît site 'fhe S1ltd¡,'r¡-,aq cnn¡lrcfld in aaq4tl2nqq..¡-,itlr nr-'r ?gÍeeme!1t fnr:lntlchnicel engineering services to you dated March 9,2021. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Consfmetion: Design plans for the resiclence have not been cleveloped. The pflopúsed house wiii .bc iocarecr indre ar'ea üiFiis i anci ¿anciwiii iirciy .ûc oriç tu iwu siüries over a walkout basement. Ground floor will be structural over crawlspace or slab-on-grade. Cut ciepths are expecteci to range'oetween a'oout 4 and iû feet. Founciation ioadings for this type of construction are assumed to be relatively lieht and typical of the proposed type of construction. If hrrilrlilrn ¡nn¡litinnc nr fnr¡nr{qfinn .lnadings are e;-nifi1an1l¡,' .lifferenf ftnm thnee r{q91"ih4d above, we should be notified to re-evaluate the recommendations presented in this report. Site Contiitions: The site was vacant anci the buiiciing area siopes ciown to the south anci east at between 10 to 20 percent grade. Below the buildins. atea, the slooes steepen to about 25 percent fo fhe easf anrl i5 nercent dowrr fo fhe south Vesefnfion consisfs of sase hn¡sh anrl scaffererlf _ -- -a- - e pinon trees witir atr understory oi grass atrd wee,is. Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating two exploratory pits in the building area and two pits in the septic area at the approximate locations shown on Figure 1. The logs of the pits are presented on Figure 2. The subsoils encountered, -] - whitish, ntçdiurn dense to stiff, gravolly silt and sand. Basalt rocks in a sand and silt matrix wcrc encountereci in Pit i at a <iepih of 2 Íbet. Resuits of a graciation anaiysis performeci on a sampie of slightly gravelly sand and silt (minus 3-inch fraction) obtained fiom the site are presented on ı.- ii_, -¡-.ı ,-.i ı--t,-,ñ-;-ir,-.rì ırì,ì-.Þ-.! JJ..;,.,_r! slightly moist to moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of 1,500 y;i"ítrt oupfjuii ui"iii" ¡;rwpusvii içsiiiç¡ir;u, iiiç ¡uri¡ iv,,,,i i.u uuii¡iiilrss aii'.;, uvciii¡ig aii,.i ii ,v,v could be some post-construction foundation settlement. Footings should be a minimum width of 18 inches for continuous walls ancl2 feet for columns. Loose and disturbed soils encountered at the iounciation bearing ievei within the excavation shouici be removeci anci the looting bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with :.j-=.:::::- -.-:-.:' -=i-..-.-..-¡ ìi-.+::- i- --.i'- -. .-:::'--*i-^-::: j.^. - j--.-: -----..--,.--,-. T'i-.--,.---,--+ .--i{.^.---+;,-.-: -: :.---:4uwTuoLv vvvv¡ 4uvvv lllwlr uvqrrrró vrwv4ravllJ lvl trvJL l,rvrwvLru¡!. ¡ ¡qúçr¡¡ç¡ra vi ¡vvù¡¡róit øL ¡ùa-i 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported iength of at ieast i2 ieet. Founciation waiis acting as retaining structures shouici be <iesigneci to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 50 pcf for the ::- -'i: r " i'ioor Siabs: i ire narural on'slle sorrs, exciusive oi lopsoii, are suiiabie io suppori iighi.iy io moderately loaded slab-on-grade construction. 'l'o reduce the efÏects of some difTèrential movement, floor slabs should be separated from all bearing walls and columns with expansion ioints which allow unrestrained vertical movement. Floor slab control joints should be used to iuiiuuv uorrragL úu'; iu siuitÅo6.,,-,ovi..iiig. i'iiu t"g.ri,*,rrrviri¡ iui juiiii. ryaviiig o,,ú oi¿ri: reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath basement level siabs to taciiitate cirainage. This materiai shouici consist of minus 2-inch aggrcgatc with icss than 50% passing the No. 4 sieve and less than2o/o passing the No. 200 sieve. ¡!!f!!¡.r¡¡!r1¡rtrttlt,1t,t¿ıFñ/¡¡¿\u llll lllatcrrars rur suppurt or lr()()-r sraos s{rouru De gurnpaL,tgu r() at reasl iJTo oL rnäxrfiturn smn<iarci Proctor ciensity at a moisture content near oprirllum. R.equireti fiii can consist of rhe ttn- site soils devoid of vegetation. topsoil ancl oversizecl roc.k. Underdrain System: Although free water was not encounterecl ciuring our exploration, it has L^^- ^,,- ^.--^-:^-^^.i- +L^ ^-^^ +l^^+ l^^^1 ^^-^f.^,{ ^-^.,-,{-r¡nrn¡. nnø ..1^-,^l^-,{.,-:-^ +:*^- ^fvwwrr vur v^yw¡rvrrwv ru lrrv srva lrral ¡vvør ywrvrtvu ótvurrgyv4!wr vqtr uvvvrv}, uururó ururwD vl Kumar & Associates, lnc. @ Project No, 21-7-256 -3- heqr¡r¡ nrr"cinifafinn rìr seâqônnl rrrnnff Fr"nzen ornrrnrl rfirrino cnrino rrrnnff r-qn c*'nÍe a ncrcherl corìdiriori. We recoiiulìenci beiow-grade consiruction" such as reiairiing wa¡is, crawispace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backf,rll surrounded above the i::.ert 1s...g1...,.ith f:e: d::i:lilg -:.rcn'rl* =:t,^:icl. The drcir shc':ld be ple::d gt =::h 1-^'...-l cf excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1olo to a suitable gravitv outlet. Free-draining granular material used in the underdrain system should contain less than 2o/o passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least lYzfeet deep. An irrr^en-,i1rl! merlþr-ane Sr,lfh ?", ?n rr,ril ÞV{' shnrrl4 be nlq¡'e.{ h4n¡alh fhe r{tl.in gr"arre'l in a ttnrrgh shape and attacheci to the tbundation wall with mastic to prevent wetting of the bearing soiis. Surface Drainage: The follo.¡¿ing drainage precautions should be obsen¿ed durino cnrrqrn,cfion and maintained at all times after the residence has been completed: 1) Inundation ofthe foundation excavations and underslab areas should be avoided r.lr-,; i r ig i.i!i,:i a.¡..'1 i.,,r, 2) Exterior backfill shouid be adjusted to near optimum moisture and compacted to at least g5olo of the maximum stan<larcl Proctor elensity in pavement anel slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. Free-draining wall backfill should be capped with about 2 feet of the on-site, finer grl Je4 r,-:il l tc :¡i--;l = l:-äf;l s';;i¡l =1 li:;tl =;1. 3) The ground surface surounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway arsas. A swale may be :reed:d -phill n+ 4i:=:!:-:f::e r::cff :::=:C the:-^sidetrce. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heary inigation should be located at least 5 feet from the building. Consideration should be given to the use of xeriscape to !imit ^ntenfi¡l r¡¡ettir-rc nf enilq þc!4-¡-' the {^ttn4.ati4n ¡.3r1ç9d h.' ir¡!gqfian Septic Field: A USDA gradation test performed on soils from 6 ta 7 feet deep in Profile Pit 2 i-li^^+^^ +L^ ^^:l +-.^^ Ç^- ^^^+i^ ¡^^:^- :^ ^-^,,^11,, S^-¡-. I ^^q .-.1"ì-h .'t ^"1ã t ^ ^.'i+^l'l^ f^- oiiiUiUAtçS üÍiv SUii LJiiU iLri JUPtiU L¡USigiI lii \jiax-vvrrJ rJCLrrLrJ rJ\r.uu wllvlt ù[\.,urLl uu ÐulLúLLrrv r\rr ¿1. conventional septic system. The septic system should be designed by a professional engineer. K::==: -- -^-e:+litt::. !::.6 D¡¡ia¡f N^ t,t-7.-tEA -4- LÍmÍtations; This study has been oonducted in accordance with gonerally accepted geotechnical enginccring principles and practices in this aÍea at tiris time. Vie make no \¡/amanry either express or implied. The conclusions and recommendations suburitted in this report ale based , - - .- i!- - l-- - -3--.-- !- r ^ti.f,Ït,-riaTt¡i-rÃ,1 îf,1ûa-r Íäú Ãvñi,rñ,!ì^ñr ñrÌ.r ävıô!rnia^ ^+ ùhd ¡.a^.¡ir.rñ.r rñ/¡r,a,riô; ,-- ili^rr-¡ Ìút/U¡¡ .¡¡v süLü vü*i4¡v$ ^iv¡ii t^^v y¡\I/¡v^úivii ptaþ v.itEi satu üi iiiË ii.;üi;-;;ú iiii;iti;;;J Ui; ;;Bü¡ii I and to the depths shown on Figure 2, the proposerJ type of construction, and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other bioiogicai contaminants (lvíûBC) <ieveioping in the flrture. If the ciient is concerneci about MOBC. then a professional in this special field of practice should be consulted. Our ¡l Þ i i a | ! ¡. t ¡ i ¡: ô.t ¡r¡3 ¡ r ¡¡Fr--iñiì!!ìi¡{ ¡!-!r-'¡¡i,-aÊ iñiFÍñíi¡-X¡iii:i ;jñii Ë-t¡râñrì¡.ãii¡_,r. ,-.i i:aÊ Çi¡i-.i'i¡.-r-:;:s i.iiñriiiiiiE+ rriÊrr..r -__¡¡!^;^u* +, i¡¡v exploratory pits and variations in the subsurfüce conditions may not become evident until cxcavation is performed. If conditions encountered during construction appear different from +!----.-.-- -l-------".:L-----l :-- +!=i- ".--,*---.¿ -=.- -l- -=-! I l- - ,- - tt.r, .' *¿ - --- ----t---^2 --^ -"crt^ -ulusË uËsçtlusu ur tluù lçl.tu[t, Wç s¡rourtl Ue rlulilrgc AI uÍice SO fG-eVAiUAIiOä Crf üie recommendations may be made. 'iitt" rcprri i¡oo i-rccri ¡rivparcú iur iirc e¡uiu¡rut; usc iry uur viiçui iur r.iasigii purpuuçs. ìVç ð.rç itüI responsible for technical inteqpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the impiementation of our recommendations, an<i to veritv that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis ^---^i:¿:^^¿:^--¿^ +:-^ ..^^^-----^--:-t: -:'t----^:-^ ::7^ '.^^^-----^-; --^ -:¿- --.^--,_--^:--.,v¡ ¡rrÙi¡ri.¡a/d¿iiv¡¡ú Eù liiV ivvvr¡ur¡vr¡i¡¡¡í¡\lii;i y¡uùv¡rrvi¡ ¡iü¡üi¡¡, rr v rvvùri¡¡iiViis i/i¡ errv vuJvr V.iiivil of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or if we may be of further assistance, please let us know, Respectfu lly Submitted. Þi -- ,-.-. ,, -- d] å ........ ^i-- ¿! .iiÈ!Ìcaû;- és rå+þ{¡ü.Ë¿è¡;Ésr L.i ',.;;z- Í)aniel E. Hardin t *-1{þt T.}._,_ ì,-.-,. cit Ê DEHlkac atúachments Figure I * Location of Exploratory Pits Fisure 2 - [,oss nf ],lxnlnrafnrv Pifsç ç' - "---f-* Figure 3 -"Lcgcnd and Notes Figure 4 * Gradation Test Results taifrllfra e- E lU¡ I r'- ¡ :rBâr¡trñfi ¡ aôî !¡Af !t¡f¿\¡ tÞsrv J v vut I v¡ous5¡vrr r vùt ¡wosrtu ut/. $. *¡*êl å Â*="-:íri;¡i.*':-:. !ì li;. .1 l"l 4,::;? r'i';, :l'å -?. ;i.14 -0 0 5 IU t- LrJ f¡Jt! I:lt-o- l¡Jô F l,¡lblL I FfL lJJô 5 I +4=6 -.1 -zoo=¡o -l GRAVEL=21 -l slruo=¿z SILT=27 ULAI = IU - tu "í 21 -7-256 Kumar & Associates LOGS OF EXPLORATORY PITS Fig. 2 PIT 1 EL. 7446' Ptl 2 EL. 7558' PROFILE PIT 1 EL. 7326' PROFILE PIT 2 EL. 7332' I EêEÀ|N lUrJ\.,,lL; \J1\\rAl\lt/ JAI\Ul JlLl MAI YVlln f\\.,,\,, lJ' rlñM, MtrlJl, LlAfff\ EK\JVYI\. cLAY (CL); StLTY, SANDY, STIFF, SLIGHTLY MOIST, BROWN BASALT ROCKS: GRAVEL TO BOULDER SIZE. IN SANDY SILT MATRIX. DENSE. SLIGHTLY MOIST WHITISH. i r' lSlLr AND SAND (ML-SM); GRAVELLY, MEDIUM DENSE TO STIFF, SLIGHTLY MO¡ST, WHIT|SH.VIt1 DISTURBED BULK SAMPLE PRACTICAL AUGER REFUSAL. NOTES 1. THE EXPLORATORY PITS WERE EXCAVATED WITH A BACKHOE ON MARCH 9,2021. F\rñt ^n ¡ T^F\/ ñrÌê ^ ñññÂ\rrr ¡L. tnr LUUAttvttJ vf tnr L^rLvnAtvnt rttJ llr^r MLAJU^Lu ñTTÃv^tlvlHtLLt ol TAvillv rnvryl FEATURES SHOWN ON THE SITE PLAN PROVIDED. -1. ¡ñL -LLÏ.'ì¡i'-¡t'i+ iii iñL Lrai Lü-aiii:-ji--ì i-iii íiL-rL L-¡tii¡_iLü o¡ i¡aiLir¡UL;ìiiu¡i GL¡iiLLìì CONTOURS ON THE SITE PLAN PROVIDED. 4. THE EXPLORATORY PIT LOCATIONS AND ELEVATIONS SHOULD BE CONSIDERED ACCURATE ONLYT^ TUr nr^Drr l\/Dt trn DV Îutr t¡trTu^n tlerñ¡U ¡-L ULU¡\LL IIVi¡ L¡LU U¡ IIIL IVILIIIVU UJLU. 5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE AFrKUÃtMATr uüu¡¡unxrL5 6LrwLLN MATExlnl 'r rrt-s ANU triL rKAN5rruN5 MAt ËL úr(AuuAL. 6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF EXCAVATION. PITS WERE trñçFrllLLÈU JUÞ.iÉqULIìÌ l\J JtlMrLllTlr' 7. LABORATORY TEST RESULTS: WC = WATER CONTENT (%) (ASTM D 2216); +4 = PERCENTAGE RETAINED ON NO. 4 SIEVE (ASTM D A22); -2OO= PERCENTAGE PASSING NO. 2OO SIEVE (ASTM D 1 1 4O); GR^.VEL = PTRCENT RET.^.IN[D 0\l NO, '!0 SIEVE: SAND = PERCENT PASSING N0.10 SIEVE AND REïAINED ON NO.325 SIEVE; cil T - DrD^rllT D^qellln lln 24tr cltr\rtr T^ D^DTlnl r QlTr ^nîl/I/.J¡L¡ - r Lt\vLttt I ñJrtttu ttv. g¿u JtLtL tv I ñt\ttvLL Jlal .vv¿tvtlYtt r,,!é! - ! L!\-r_,L!!! -_r!YIF-LLL!\ !!!ts_!! l5-!\-!!r_'LL 1t!4L :r_¡r_¡4!!!!Y!: F t l I J I ? ßt I I -7 -r\^Krvnar ß Accnniatce NTNN ANN NôTFq fin1 o to 20 t0 ¡10 50 60 70 ao ro0 td , roo t0 €0 70 80 50 ,t!, 50 20 SIEVE ANALYSIS : H Þ htÉ DIAMETER OF CLAY TO SILT GRAVEL6XSANDl'A LIQUID LIMII SAMPLE OF: Sllghlly Grovelly Sond ond Silt PLASTICITY INDEX : i r i-tliiL,:ll..ll- l f Llil. ll Lil.- 1.1,75 9.5 t9 !6,1 SILT ANO CI ÀY 16 ?1 FROM:Plt2el-5' COBBLES lhe!. l€rl rslultr dpply only lo the rqmplsr whlch wôrr lorlrd, Thrbrllng rcporl rholl nol br roproduc6d, oxoopl ln full. wllhoul lho wrltlonqpprovol ol Kumor ll Arlgoiolr!, lno, Sl.vc onolyrl! lesllng b portom.d ln cccordonc. wlth.ASTU D6915, ASTM D7928, ASTM C156 dndlor ASTY Dll¿o- HYDROMETER ANALYSIS CLEAR SOUARE OPENINOS sfÍ' tf¿' t t tr' sr"" l--- ' '- " .1' SAND GRAVEL FINE MEDIUM COARSE FINE COARSE 'é e ! g ã a Iû ¡21 -7 -256 Kumar & Associates GRADAÏION TEST RTSULTS Fis. 4 I r\/nn^[r-ÎTn ^Àt^t \/Ô¡c Ôtr\rr ^Àr^t\/ôro 24 HR, 7 HR .001 .002 .005 .009 ,019 i 1 MIN, #32s #140 #60 #3s #18 #10 #4 3/B' 3/4 1 ()-7 îà +1 o- Fz. LrJOVLI 0_ 5050 O LJz i_ tl.jM z E. LrJL 90 70 4060 3070 20 10 20 30 106 .025 .500 1,00 2,00 3' 5',6" B', 4.75 9.5 19,0 37.5 16.2 152 203 100 .045 utAtvtE I Én uT TAn I tvLEo ¡t\ rvilLLilvtE r Eno I I GRAVEL v FINF I FJNF I MFntrJ[,4 I GFAVEL 21 %SAND 42 %stLT 27 to CLAY 10 "/o trÞ^N ¡- Dr^{il^ Ðì+ a G\ et -7t I tt a \Y v ¡I len^ Q^ll TVDtr. iêrnrrnlh¡ Q-nrlv I ^-mrJ vqr rvJ Lvqr I I ì 11 :í :i )1 -1 -2\^Ktvt¡er R Accnniafac llcn cRADATTôNt ïtrqï pF-cl ll Tq I I trin 5