Andy Schwaller
Thursday, May 20,2021 8:06 AM
Jim Wilson; Colleen WirtÈ
FW: [External] Requirements e-mail to Garfield County Building Department.
Not sure if this permit has been issued or still pending. The location ís Lot 4 Bíg R Subdivision. Maybe L60 Gemat Court.
From: jblatz@ccmaspen.com <jblatz@ccmaspen.com>
Sent: Wednesday, MaY L9, 202L7:45 PM
To: Orrin Moon <Orrin.Moon@Crfr.us>
Cc: Andy Schwal ler <aschwaller@garfíeld-cou nty. com>
Subject: Re: [External] Requirements e-mailto Garfield County Building Department.
Thanks Orrin. We will get right on it
On May Lg,2O2l4:30 PM, Orrin Moon <Orrín.Moon@Crfr.us> wrote:
Here you go John.
TfÌ-&.B{K YQU,
Q'RfrIN Ði. fiilO:ON
Pfi fr VE NTI_ÇTI ÐIVISTOFI ÇåII'H FIF 18 E ftIE RSH&N-
eçrrcß*Ðe 8lfäR Ë[&ü fifrseuE
9?0:6â5-T U43,
orrin.moon(Acrfr,us
À_
3
^
Jl¡¡
tr
1
Dave,
r have reviewed the prans for the Metar shop, rot 4 at Big R Subdivísion and r have the followíng requirements:
L. Address shall be assigned to the building with a Gemat court address whích is visible from Gemat
court. I show 160 Gemat court already assigned to lot 4 in the county records'
z. As per the Final subdivision plat Note # 12, the building shall have a fire alarm system installed' The fire
alarm system shall meet the requirements of NFPA 72 with plans approved by my office, rough in and
final lnsPectiott required'
3. Fire extinguishers required as per NFPA 10 and 2015 IFC'
For your information the paint booth shown on the originar prans (you shourd get the new plans) has been removed by
the owner and will be constructed at a later date in a new building on the property'
T}IÀT,¡K {ÇU,
ORRIN Þ" MOON
Fft f,VANT}TN ÐIVTSICI\ ÇHIËË/FT&E M&RS}I Å"L
e0L0fi&Ðo ftlvtrR Ft8Ë. ilgscufl"
9?û-6s$:'t 243
orrin.moon(Acrfr.us
Colleen W¡rth
From:
Sent:
To:
Subject:
Andy Schwaller
Thursday, May 20,2021 12:04 PM
Colleen Wirth
RE: [External] Requirements e-mailto Garfield County Building Department.
Thanks
From: Col leen Wirth <cwirth @ga rfiel d-cou nty.com >
Sent: Thursday, May 20,202110:52 AM
To: Andy Schwaller <aschwaller@garfield-county.com>; Jim Wilson <jwílson@garfíeld-county.com>; Matt Provost
<m provost@ garfield-cou nty. com >
Cc: Sam I rmen <sirmen @garfield-county.com>
Subject: RE: [External] Requirements e-maílto Garfield County Buílding Department.
BICO-O9-20-6489 John Blatz Big R Commercial Park - AMENDED P1ANS Status
Update
Here's the scoop as best I can trace.
Receípted Sept 2020; issued early Nov 2020.
Dave Argo original revíewer.
Matt was on job site first % April2O2L and directed them to resubmit drawings reflecting as-built changes the added
mezzanine level.
4-15-2-21, Contractor dropped off plan sheets with Brooke the following day, and very capably moved them my roll plan
bin.
4-20-ZA27l consulted with Andy and sent out l'tcorrection emailto Kurt Carruth architect, builder, Summit AE
structural engineer.
Kurt C. responded a few days later, but no structural updates.
5-7-202t Colleen sent 2nd email to project team requesting confirmation on mezzanine framing plan status
5-tO-202L Kurt C. responded Summit AE still workíng on it and will submit once available.
5-tg-2021. Colleen still holding ORIGINAL APPROVED PLANS and AMENDED PLAN BLUEPRINTS on desk, waiting on
structural engineer.
FYI - lt appears the high strength bolting special inspection report and state electrical ínspector reports have been
added to the file folder circa 4-2L-202L. Special inspector documented bolting in the mezzanine. Loose bolt
corrections were made with special inspector present.
As I am stíll waiting to finish review of the AMENDED PLANS, I can add Orin's (fire dist) comments onto AMENDED FIELD
COPY /CONDITIONS. I am, however, concerned work may be continuing on the job site without the AMENDED PLANS
in hand, and depending upon your thoughts and input may be worthy of considering making a stop by the job site to
keep them informed. Orin's email chain shows a reference to JOHN, so I trust that was direct communication with John
Blatz building owner.
On my end, I could reach out to Summit AE to check on progress of preparing plans, but they may just be that busy and
overloaded right now. (ln a nut shell, the AMENDED PLANS are incomplete, under review and not reissued.)
Thoughts?