Loading...
HomeMy WebLinkAbout1.0 ApplicationNotes: The well pad site is located in the NW 1/4 Section 29,T6S,R96W ,6th P.M. (NAD83N39.4981oW108.1389o) The site will temporarily office and house up to a maximum of four individuals during natural gas drilling activities and is expected to be completed in one year or less. The individuals will occupy two individual trailer houses located on the well pad. Trailer houses have Colorado Division of Housing compliance tags. Aboveground sewage holding tank with aggregate storage of 1500 gallons capacity on-site. Sewage flows estimated to be 300 gallons/day (4 individuals x 75gpcd). Sewage holding tank needs to be emptied approximately every 5 days (1500 gallons / 300 gallons per day). Wastewater vault equipped with overflow alarm device. Terra utilizes the services of a licensed contractor to remove and haul the wastewater to a State certified treatment/disposal facility. Potable aboveground water tank with aggregate storage of 3360 gallons capacity on-site. Potable water demand is estimated to be 300 gallons/day (4 individuals x 75gpcd). Required minimum fire suppression demand is 2500 gallons. 10,000 gallons of water are stored onsite for fire suppression activities. Dry hydrants and water meter were on potable water tank. Road access to the site is maintained year-round through the services of private road maintenance and construction contractors. Base mapping byUinta Engineering & Land Surveying. Site features including housing trailers, water and wastewater tanks, portable toilets and dumpster were field located. Please note that this is a construction site and that the locations of drill equipment and other items are subject to change. Factory-Built Nonresidential Housing Structures have a minimum separation distance of 20 ft. TEP Rocky Mountain LLC GR 12-29 Well Pad GR 12-29 Site Plan Garfield County, Colorado Small Temporary Employee Housing and Septic Permit Application Applicant:TEP Rocky MountainLLC Date: September 23, 2021 Checked:DJF Version: 001 Fox Engineering Solutions, Inc. P.O. Box 413,Fruita, CO 81521 Ph: (970) 250-5505 Email:david.fox.fes@gmail.com Directions to Site: Emergency Contact List: Main Office: (970) 285-9377 answered 24 Hours Rig Site: (970) 549-3691 Satellite Phone JaysonBoebert: Drilling (970) 274-2569 Cell Kyle Kohl: Drilling & Completions Manager (970) 250-7593 Cell TylerGilliam: Drilling (936) 520-8434 Kevin McDermott: Safety (970) 309-1195 Cell Mike Gardner: Spill Response (970) 263-4875 Cell Identification & Location Key* 1. Wastewater Aboveground Tank (1500 gal.) 2. Potable Water Aboveground Tank 3320 gal) 3.Portable Toilets 4.Wildlife-proof dumpster 5. Company Man Housing 6. Office 7. Driller's Office/Housing 8. Directional 9. Mud Engineer 10. Shed * Subject to relocation for construction activities. 25 f t . 56 2 7 1 10110 ft. min.Flare Stack 3 4 6 From:Kaylee McIntosh To:opschief@gvfpd.org Cc:Tyler Gillam (TGillam@terraep.com); Kyle Kohl; Jayson Boebert; Shawn Brennan; Kevin McDermott; Delbert D. Dowling; Mike Gardner (MGardner@terraep.com); Bryan Hotard Subject:Terra Energy Partners *** GR 12-29 Pad *** Rig Move On Notification Date:Friday, September 24, 2021 16:00:00 Attachments:image001.pngGR 12-29 Pad_Move on Notice_Emergency Response_GVFPD.pdf Greetings, This notification is in accordance with Garfield County Community Development to inform you of the small temporary employee housing located on the GR 12-29 pad (Sec 29 – T6S R96W). Additional housing has been placed on support pad GR 14-28 (Sec 28 – T6S R96W). Please see the attached emergency response information. TEP Rocky Mountain LLC has commenced drilling operations that will continue for approximately 54 days (11/16/2021). At which time we will notify you of the removal of the employee housing. Should you have any questions or concerns regarding this notification please feel free to contact me. Thank you, Kaylee McIntosh | Sr. Engineering Specialist | TEP Rocky Mountain LLC | 1058 County Road 215 | Parachute, CO81635 ( (Office) 970.263.2731 | ( (Mobile) 970.623.9452 | * kmcintosh@terraep.com From:Kaylee McIntosh To:cbornholdt@garcosheriff.com Cc:Tyler Gillam (TGillam@terraep.com); Kyle Kohl; Jayson Boebert; Shawn Brennan; Kevin McDermott; Delbert D. Dowling; Mike Gardner (MGardner@terraep.com); Bryan Hotard Subject:Terra Energy Partners *** GR 12-29 Pad *** Rig Move On Notification Date:Friday, September 24, 2021 16:00:00 Attachments:image001.pngGR 12-29 Pad_Move on Notice_Emergency Response_GCSO.pdf Greetings, This notification is in accordance with Garfield County Community Development to inform you of the small temporary employee housing located on the GR 12-29 pad (Sec 29 – T6S R96W). Additional housing has been placed on support pad GR 14-28 (Sec 28 – T6S R96W). Please see the attached emergency response information. TEP Rocky Mountain LLC has commenced drilling operations that will continue for approximately 54 days (11/16/2021). At which time we will notify you of the removal of the employee housing. Should you have any questions or concerns regarding this notification please feel free to contact me. Thank you, Kaylee McIntosh | Sr. Engineering Specialist | TEP Rocky Mountain LLC | 1058 County Road 215 | Parachute, CO81635 ( (Office) 970.263.2731 | ( (Mobile) 970.623.9452 | * kmcintosh@terraep.com