HomeMy WebLinkAboutCorrespondenceColleen Wirth
From:
Sent:
To:
Subject:
David Brown <david@strykerbrown.com >
Thursday, May 20,2021 9:00 AM
Colleen Wirth; Andy Schwaller
IExternal] Manchester Residence Schooner Lane
Colleen and Andy,
Thanks for taking time to meet recently to go over the height calculation methodology.
ldroppedoftheplansTuesdayofthemodifiedroofversíonofthehouse. Thisincludedafullnewstructural package,
but only the changed sheets in the Architectural set. The changes showÍng the lowered and revísed roofs are bubbled as
íf a change order.
As we discussed in our meeting, the roof over the entry area dropped 3 L/2feeL I adjusted the corners of the roof over
the Studío area to bring the average exístíng grade up.
lf you have any questions, or want to discuss these changes further, please let me know.
yours,
DAYID BROWN
david @strvkerbrown.com
970-379-4L00
1