Loading...
HomeMy WebLinkAbout21053-OWTS PlanS81° 37' 18"W 2 6 4 . 4 6 ' ( T I E ) CabinWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWS PROPERTY LINE (S89°41'17"E 1063.86')PROPERTY L INE (S16°47 '59"E 379 .15 ') PROPERTY LINE (N89°40'44"W 665.30')C/OCounty Road No. 312 (Garfield Creek)SS>>>PP PP 6 9 6 86966696469626960 6962 69606950Ex . D i r t R o a d 696069506940693069206910690068906970 6980 6990 6964SITE BENCHMARK FND MONUMENT INSPECTION PORT AT EACH END OF EACH LATERAL, TYP. 4"Ø SCH.40 OR SDR35 PVC @ 2% MIN. EXISTING CDPHE APPROVED 1,000-GALLON TWO (2) CHAMBER SEPTIC TANK. INSTALL AN EFFLUENT FILTER IN OUTLET TEE AND EXTEND THE ACCESS RISERS TO THE SURFACE. CLEANOUT AT THE BUILDING TIE TO PROPERTY CORNER TO BE ASBUILT UPON COMPLETION CONSTRUCT A 12" DEEP SWALE ABOVE THE ABSORPTION FILED 5' MIN.20'MIN.10' MIN. PROFILE TEST HOLE, TYP. THE WELL (SHARED WITH PROPERTY TO THE NORTH) IS LOCATED APPROXIMATELY 750' TO THE NORTH OF THE ABSORPTION FIELD.25'MIN.EX. WATER SERVICE 4-WAY LEVELED DISTRIBUTION BOX 37110DERIC J O N WA L T ERCOLOR A D O LICE N S EDPROF E SSIONA L E N GINEER9/30/21 SITE EVALUATION 1.SITE EVALUATION WAS PERFORMED BY: DERIC J. WALTER, PE BOUNDARIES UNLIMITED INC. 923 COOPER AVE., STE. 201 GLENWOOD SPRINGS, CO 81601 970.945.5252 2.EVALUATION DATE(S): SEPTEMBER 2021. 3.SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF < 1000 GPD: 3.A.SPRING OR WELL=100' 3.B.POTABLE WATER SUPPLY LINE=25' 3.C.POTABLE WATER SUPPLY CISTERN=25' 3.D.DWELLING=20' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25' 3.G.LAKE, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' 3.H.DRY GULCH, CUT BANK OR FILL AREA=25' 3.I.SEPTIC TANK=5' 3.J.RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 4' (TREATMENT LEVEL 1, GRAVITY FEED) 3.SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1): 3.A.SPRING OR WELL=50' 3.B.POTABLE WATER SUPPLY LINE=10' 3.C.POTABLE WATER SUPPLY CISTERN=25' 3.D.DWELLING=5' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10' 3.G.LAKE WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' 3.H.DRY GULCH, CUT BANK OR FILL AREA=10' 3.I.STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5' NORTH ByRevisionNo.Date923 Cooper Ave., Ste. 201 Glenwood Springs, CO 81601 (T) 970.945.5252 www.bu-inc.com Engineer or Surveyor Seal Sheet Client Information: PROJECT NO. File Name: Designer: Drafter: Date:N:\PROJECTS\2021\21053-Appleton OWTS\dwg\21053-V-Topo.dwg 9/30/2021 2:41 PMSubsurface Utility Engineering (SUE) Required Project: If "Yes", SUE Certification by: Firm: Job #: Date:987654329/30/21 DJW DJW 21053-v-topo.dwg 21053 970.948.5520 New Castle, CO 81647 7625 County Road #312 Joshua & Ashlie Appleton Garfield County, Colorado1.Parcel ID: 2183-322-00-078Onsite Wastewater Treatment System (OWTS)Appleton OWTSC.1 NO N/A N/A N/A SURFACE 12"-18" TOPSOIL 7'-6"BROWN, VERY CONSISTENT FINE SILTY CLAY 00 40'80' Scale: 1" = 40' ATTACH REMOVABLE CAP OR THREADED CLEANOUT ASSEMBLY. INSTALL MARKER IF CAP IS TO BE BURIED. FLOW FINISH GRADE 4"Ø PVC RISER 4"Ø 45° BEND 4" PVC WYE 4"Ø SEWER LINE Vicinity Map Scale: N.T.S. Site & Soils Evaluation SOIL EVALUATION 1.SOIL EVALUATION WAS PERFORMED BY: DERIC J. WALTER, PE BOUNDARIES UNLIMITED INC. 923 COOPER AVE., STE. 201 GLENWOOD SPRINGS, CO 81601 970.945.5252 2.EVALUATION DATE(S): SEPTEMBER 2021 OF TWO (2) EXCAVATED PROFILE PITS EACH TO A DEPTH OF APPROXIMATELY 7'-6" (SEE TYPICAL PROFILE). 3.EVIDENCE OF WATER: NONE. SOILS WERE MOIST, BUT NO IDENTIFIABLE SEASONAL WATER TABLE LAYERS EXISTED. 4.COLOR: BROWN, CONSISTENT. 5.USDA SOIL STRUCTURE TYPE: MASSIVE. 6.USDA SOIL STRUCTURE GRADE: STRUCTURELESS (HAVING NO OBSERVABLE AGGREGATION AND NO DEFINITE ARRANGEMENT OF THE SOIL PARTICLES). 4.USDA SOIL TEXTURE CALCULATOR RESULTS: SILTY CLAY. 4.1.% SAND: 5± 4.2.% CLAY: 55± 4.3.% SILT: 40± 5.USDA WEBSOIL DATA: 5.1.MAP UNIT: 23 - DETRA FINE SANDY LOAM, 12-25 PERCENT SLOPES 5.2.PLASTICITY INDEX: 7.5 5.3.LIQUID LIMIT: 27.5 5.4.SEWAGE DISPOSAL RATING: VERY LIMITED 6.ASSESSMENT: SOIL TYPE 4A WITH A TREATMENT LEVEL 1 LONG TERM ACCEPTANCE RATE (LTAR) OF 0.15 gpd/SF. Scale: N.T.S. Cleanout NORTHMAINTENANCE NOTES 1.TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWTS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING: 1.A.MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK. 1.B.MINIMIZE SOLIDS GOING DOWN THE DRAIN. 1.C.ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO A MINIMUM. 1.D.MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN. 1.E.USE LINT FILTERS ON LAUNDRY MACHINE DRAINS. 1.F.KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN. 1.G.AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER. 1.H.DO NOT USE LYE-BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN-OFF, OR OTHER STRONG CLEANING AGENTS. 1.I.DO NOT PUT ANY “ROOT DETERRENTS” DOWN THE DRAIN. 1.J.DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN 1.K.MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES. 2.THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE AND SEDIMENT AS NEEDED TO ENSURE PROPER FUNCTION OF THE SYSTEM. GENERAL ABSORPTION AREA NOTES 1.INSTALL CHAMBER UNITS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 2.ABSORPTION TRENCHES SHALL BE 3' WIDE OR LESS AND PARALLEL THE GROUND SURFACE CONTOURS. PARALLELING TRENCHES SHALL BE SEPARATED BY A DISTANCE OF 6' MIN. 3.THE BOTTOM OF THE ABSORPTION TRENCHES SHALL BE LEVEL AND THE BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE ANY SOIL SMEARS INCURRED DURING THE EXCAVATION. FAILURE TO DO SO MAY REQUIRE THE CONTRACTOR TO REPLACE THE ABSORPTION FIELD AT HIS/HER OWN EXPENSE. 4.DRAINAGE SWALES ARE TO BE PROVIDED ABOVE AND AROUND THE FIELD, AS NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORPTION AREA. 5.NO EXCAVATION OF THE ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER AND USE OF RUBBER TIRE VEHICLES OVER THE ABSORPTION AREA IS STRICTLY PROHIBITED. 6.UNSUITABLE MATERIAL EXISTING WITHIN THE FIELD SHALL BE EXCAVATED AND BACKFILL SHALL CONSIST OF IMPORTED LOAMY SAND OR SANDY GRAVEL. THE ENGINEER SHALL BE CONTACTED IF BEDROCK OR GROUNDWATER IS ENCOUNTERED IN THE OVER-EXCAVATION. 7.TOPSOIL COVER MAY BE VARIED (1-FOOT MINIMUM, 2-FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING. Scale: N.T.S. Typical Chamber Trench System 36" MAX. UNDISTURBED NATIVE SOILS 6' (MIN.) BOTTOM TO BE LEVEL AND FLAT OVER ENTIRE AREA TO WITHIN 0.05'±. (TYP.) REMOVE ANY ENCOUNTERED BOULDERS AND BACKFILL WITH LOAMY SAND OR SANDY GRAVELS. DO NOT USE COMPACTED MATERIALS. DO NOT WALK ON OR COMPACT BOTTOM OF TRENCH. FINISHED GROUND - MAINTAIN POSITIVE SLOPE AWAY FROM TOP SURFACE OF THE CHAMBER TRENCHES. PVC COUPLING FOR SUPPORT STANDARD INSPECTION PORT, TYP. (4"Ø PVC SOLID PIPE CUT TO FIT. LOCATE PER PLAN VIEW. ATTACH REMOVABLE CAP OR THREADED CLEANOUT ASSEMBLY. INFLOW AND OVERFLOW PIPES SHALL ENTER THE UPPER KNOCKOUTS GRAVELLESS CHAMBER SYSTEM: INFILTRATOR QUICK 4, ADVANCED DRAINAGE SYSTEMS BIODIFFUSER (STANDARD), OR ENGINEER APPROVED EQUAL. EX. GRA D E 1 0 % ± 1% MIN 3:1 M A X G R A D E FILL CIRCULAR IRRIGATION-STYLE VALVE BOX & COVER - LID COLOR PURPLE OR GREEN - LABEL "SEWER" 3:1 M A X G R A D E18" MIN1' MIN 2' MAX 1% MIN FILL SYSTEM NOTES 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CDPHE REGULATION 43 ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) REGULATION, MOST CURRENT EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE ENGINEER MUST OBSERVE THE CONSTRUCTED SYSTEM BEFORE BACKFILL AND PROVIDE A LETTER OF INSPECTION AS REQUIRED BY THE LOCAL AGENCY. A REQUEST FOR INSPECTION MUST BE MADE BY THE CONTRACTOR AT LEAST 48-HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING. 2.DEMAND CALCULATIONS (SEC.43.6.A.2.h) 2.A.RECREATIONAL CABIN USING TREATMENT LEVEL 1 (TL1). 2.B.AVERAGE DAILY WASTEWATER FLOW (ADWF) AND ORGANIC LOAD RATE (BOD5): 2.B.1.SYSTEM SIZED FOR TWO (2) PERSONS. 2.B.2.ADWF = 75 gpdc * 2 PERSONS = 150 gpd 2.B.3.BOD5 = 0.20 lbs/day * 2 PERSONS = 0.40 lbs/day BOD5 mg/L = BOD5*1,000,000 = 0.40 lbs/day*1,000,000 = 320 mg/L ADWF*8.34 150 gpd*8.34 2.B.4.CBOD5 = BOD5 * 0.85 = 272 mg/L 3.SEPTIC TANK (SEC.43.9.B.2.a): 3.A.UTILIZE THE EXISTING 1,000-GALLON TWO (2)-COMPARTMENT TANK (PER TABLE 9-1). 3.B.THE TANK IS NOT SUBJECT TO BUOYANCY. 4.ABSORPTION AREA CALCULATIONS 4.A.GROUNDWATER WAS NOT ENCOUNTERED, THE SITE SLOPES AT THE OWTS ARE BETWEEN 2-6%. THEREFORE, THE SYSTEM SHALL BE A SHALLOW GRAVELLESS CHAMBER SYSTEM IN A PARALLEL TRENCH CONFIGURATION. 4.B.SOILS WERE ANALYZED BY BOUNDARIES UNLIMITED INC (SEPTEMBER, 2021). THE LONG TERM ACCEPTANCE RATE (LTAR) IS ESTIMATED AT 0.15 gpd/SF (SEE THE SITE & SOILS EVALUATIONS DETAIL). 4.C.MINIMUM SOIL TREATMENT AREA, A: A = ADWF = 150 = 1000 SF LTAR 0.15 gpd/SF 4.D.SIZE ADJUSTMENT FACTORS: GRAVITY TRENCH= 1.0; CHAMBERS= 0.7 4.D.1.A, adj = 1000 SF * 1.0 * 0.7 = 700 SF 4.E.GRAVELLESS CHAMBER SYSTEM: 4.E.1.INFILTRATOR QUICK4: 700 SF / 12 SF/UNIT = 59 UNITS IN TRENCH CONFIGURATION. USE 60 UNITS IN A 4 x 15 CONFIGURATION. 4.E.2.ADS ARC 36: 700 SF / 15 SF/UNIT = 47 UNITS IN A TRENCH CONFIGURATION. USE 48 UNITS IN A 4 x 12 CONFIGURATION. 5.THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS AND/OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 6.CLEAN OUTS ARE REQUIRED AT THE HOUSE AND AT ALL BENDS AND AT LEAST EVERY 100-FEET BETWEEN THE HOUSE AND THE SEPTIC TANK. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION. 8.INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED. 9.INSTALL 3-INCHES OF BLUEBOARD INSULATION, 3-FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 5-FEET. UNDER NO CIRCUMSTANCES SHALL COVER BE LESS THAN 2-FEET. 10.SITE PLAN INFORMATION FROM OTHERS. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. Co u n t y R o a d 3 1 2 SITE I-70 BROWN, SANDY-SILTY CLAY BROWN, SANDY-SILTY CLAY 4'-0"New Castle Glenwood Springs