Loading...
HomeMy WebLinkAboutCorrespondence Regarding Foundation DesignAndy Schwaller From: Sent: To: Cc: Subject: Andy Schwaller Friday, April 2, 2021 10:06 AM kenyapinela @ g mai l.com Jim Wilson; Ford Mgmt. LLC Permit BLMF-12-20-6631 13th Street, Silt Aldo and Kenia, Jim Wilson did a site visit to your project in Silt, CO. lt appears you are moving right along with your site prep. We have also reviewed a recent soil report. Please note the following items must be addressed prior to any foundation work for the manufactured home: L. The foundation plans need to be amended to reflect the over excavation and additional structural fill placement under the proposed footers as per the soil report. The soil engineer needs sign off on the final subgrade prior to pouring any concrete for the footers. 2. The cut bank along the upper portion of your property appears to be very steep and not stable. Please have a civil engineer review and provide a report. 3. lt is important the final drainage off the property down stream to your neighbors does not change from what has historically drained onto their property. You could be liable for any damages from runoff. Please have the civil engineer provide a drainage report with any corrections to the drainage included. Getting the foundation and site drainage correct is first step in the site preparation to get the project done correctly. Thank you for your t¡me with this. Please call with any questions you might have. Andy Schwaller Building Official Garfield County \.oo Cno ø ilro f TrrVry,-tz¡ 'T-n+ þuor..G $" AxD il- % À^o"¿ F"øn\N-- 5 î"pP¿-+-l ti&0 Tt-n ÞÊ W ft-oa¡?-/ t)uq tl , ¡t*rn-rænS b*suwra*q_/ bT cau-L¿ M A fx'ovcÅJ\, Þhro/ 4,7-7ou 1